Building Permit Setback Determination: Street vs. Path Classification

Numero d'incarto VB.2022.00725
Autorità giudiziaria
Giurisdizione Svizzera · Canton Zurigo (CH-ZH)
Data della decisione
Esito del giudizio Accolto (Allowed)

Sintesi Legislator

Generato dall'IA

The case concerned an appeal regarding a building permit application, specifically the required setback distance from an access route serving 52 residential units, which involved determining whether the access qualified as a "street" or a "path" under the relevant planning law, as streets required a 6m setback and paths 3.5m. The court reasoned that a "street" is primarily for vehicular traffic, while a "path" is for pedestrians and cyclists, and that the purpose of the access, indicated by the number of units served and the physical dimensions, was paramount. Given that the access served a significant number of units and its existing width (4.5m) exceeded the requirement for a simple access path under prior guidelines, the court concluded that the facility constituted a "street" for setback purposes, thereby supporting the appeal based on the specified setback regulations.

Regesto Legislator

Ufficiale

Baubewilligung | Abgrenzung zwischen Weg- und Strassenabstand; Verkehrsanlage, die der Erschliessung von 52 Wohneinheiten dient. Fehlen Baulinien für öffentliche und private Strassen und Plätze sowie für öffentliche Wege und erscheint eine Festsetzung nicht nötig, so haben oberirdische Gebäude laut § 265 Abs. 1 PBG einen Abstand von 6 m gegenüber Strassen und Plätzen und von 3,5 m gegenüber Wegen einzuhalten, sofern die Bau- und Zonenordnung keine anderen Abstände vorschreibt. Art. 12 Abs. 1 BZO sieht keine anderen Abstände vor. Unter Strasse im Sinn von § 265 PBG wird eine vornehmlich dem Fahrzeugverkehr dienende und entsprechend ausgestaltete Verkehrsanlage verstanden. Demgegenüber ist ein Weg eine Anlage, die primär dem Fussgänger- und Radfahrerverkehr dient und nur wenig Motorfahrzeugverkehr aufzunehmen hat (E. 3.1). Neben dem technischen Ausbau ist vor allem die Zweckbestimmung, insbesondere die Erschliessungsfunktion der Anlage, von Bedeutung. Im Zusammenhang mit dieser Abgrenzung dienten bis zum Inkrafttreten der Verkehrserschliessungsverordnung gemäss ständiger Praxis die Zugangsnormalien vom 9. Dezember 1987 als Richtlinie, und es wurde daher auf die im dortigen Anhang nach der Anzahl erschlossener Wohneinheiten aufgeführten Zufahrtsarten abgestellt. Die Verkehrserschliessungsverordnung eignet sich im Hinblick auf die Abgrenzung von Weg und Strasse im Sinn von § 265 Abs. 1 PBG als Richtlinie hingegen nicht (E. 3.2). Bei der vorliegenden Anzahl Wohneinheiten wäre nicht nur nach den Zugangsnormalien, sondern – grundsätzlich – gar nach der Verkehrserschliessungsverordnung von einer Strasse auszugehen. Neben der Anzahl der erschlossenen Wohneinheiten spricht noch ein weiteres relevantes Kriterium dafür, dass es sich bei der strittigen Verkehrsanlage um eine Strasse handelt: Der bestehende Ausbau der schon vor Inkrafttreten der VErV erstellten Verkehrsanlage ist grösser als die gemäss früher massgeblichem Anhang zu den Zugangsnormalien für einen Zufahrtsweg geforderten 3 bis3,5 m; er liegt mit 4,5 m innerhalb der für eine Zufahrtsstrasse geforderten 4 bis 4,75 m. Es kann nach dem Gesagten nicht davon ausgegangen werden, dass die durchgehend geführte streitbetroffene Verkehrsanlage primär dem Fussgänger- und Radfahrerverkehr dient (E. 3.4). Gutheissung.

Parole chiave

Generato dall'IA
distanze dal confine licenza edilizia dimensioni della costruzione classificazione delle strade legge sui percorsi pedonali diritto di passo

Disposizioni normative citate

Generato dall'IA
Art. 12 Abs. 1 BZO
This provision was referenced as not establishing different setbacks than those under § 265 Abs. 1 PBG.
§ 265 Abs. 1 PBG
This provision defines the required distance from roads and paths, which formed the main legal basis for judging the appeal regarding the building setback.
Generato dall'IA

Questioni giuridiche chiave estratte da Legislator

Generato dall'IA
§ 265 Abs. 1 PBG

This provision defines the required distance from roads and paths, which formed the main legal basis for judging the appeal regarding the building setback.

Art. 12 Abs. 1 BZO

This provision was referenced as not establishing different setbacks than those under § 265 Abs. 1 PBG.

Ti chiedi come si applica questa sentenza alla tua fattispecie?

Analizza questa decisione insieme alla legislazione federale e cantonale, ai commentari e alla giurisprudenza successiva in Legislator AI.

Apri in Legislator →

Testo completo

Verwaltungsgericht des Kantons Zürich: VB.2022.00725

--- · --- · --- · --- · --- · [Standard Suche](/findinfo/xhtmltemplates/standard.htm) · [Erweiterte Suche](/findinfo/xhtmltemplates/advanced.htm) · [Hilfe](/findinfo/help/index.htm)

[Druckansicht](/cgi-bin/nph-omniscgi.exe?OmnisPlatform=WINDOWS&WebServerUrl=&WebServerScript=/cgi-bin/nph-omniscgi.exe&OmnisLibrary=JURISWEB&OmnisClass=rtFindinfoWebHtmlService&OmnisServer=JURISWEB,127.0.0.1:7000&Parametername=WWW&Schema=ZH_VG_WEB&Source=&Aufruf=getDocument&cSprache=GER&nF30_KEY=223383&W10_KEY=13317018&nTrefferzeile=1&Template=standard/results/printviewdocument.fiw)

--- · --- · --- · Geschäftsnummer: · VB.2022.00725 · Entscheidart und -datum: · Endentscheid vom 13.07.2023 · Spruchkörper: · 1. Abteilung/1. Kammer · Weiterzug: · Dieser Entscheid ist noch nicht rechtskräftig. · Rechtsgebiet: · Raumplanungs-, Bau- und Umweltrecht · Betreff: · Baubewilligung · Abgrenzung zwischen Weg- und Strassenabstand; Verkehrsanlage, die der Erschliessung von 52 Wohneinheiten dient. Fehlen Baulinien für öffentliche und private Strassen und Plätze sowie für öffentliche Wege und erscheint eine Festsetzung nicht nötig, so haben oberirdische Gebäude laut § 265 Abs. 1 PBG einen Abstand von 6 m gegenüber Strassen und Plätzen und von 3,5 m gegenüber Wegen einzuhalten, sofern die Bau- und Zonenordnung keine anderen Abstände vorschreibt.

Art. 12 Abs. 1 BZO sieht keine anderen Abstände vor. Unter Strasse im Sinn von § 265 PBG wird eine vornehmlich dem Fahrzeugverkehr dienende und entsprechend ausgestaltete Verkehrsanlage verstanden. Demgegenüber ist ein Weg eine Anlage, die primär dem Fussgänger- und Radfahrerverkehr dient und nur wenig Motorfahrzeugverkehr aufzunehmen hat (E. 3.1). Neben dem technischen Ausbau ist vor allem die Zweckbestimmung, insbesondere die Erschliessungsfunktion der Anlage, von Bedeutung. Im Zusammenhang mit dieser Abgrenzung dienten bis zum Inkrafttreten der Verkehrserschliessungsverordnung gemäss ständiger Praxis die Zugangsnormalien vom 9.

Dezember 1987 als Richtlinie, und es wurde daher auf die im dortigen Anhang nach der Anzahl erschlossener Wohneinheiten aufgeführten Zufahrtsarten abgestellt. Die Verkehrserschliessungsverordnung eignet sich im Hinblick auf die Abgrenzung von Weg und Strasse im Sinn von § 265 Abs. 1 PBG als Richtlinie hingegen nicht (E. 3.2). Bei der vorliegenden Anzahl Wohneinheiten wäre nicht nur nach den Zugangsnormalien, sondern – grundsätzlich – gar nach der Verkehrserschliessungsverordnung von einer Strasse auszugehen. Neben der Anzahl der erschlossenen Wohneinheiten spricht noch ein weiteres relevantes Kriterium dafür, dass es sich bei der strittigen Verkehrsanlage um eine Strasse handelt:

Der bestehende Ausbau der schon vor Inkrafttreten der VErV erstellten Verkehrsanlage ist grösser als die gemäss früher massgeblichem Anhang zu den Zugangsnormalien für einen Zufahrtsweg geforderten 3 bis 3,5 m; er liegt mit 4,5 m innerhalb der für eine Zufahrtsstrasse geforderten 4 bis 4,75 m. Es kann nach dem Gesagten nicht davon ausgegangen werden, dass die durchgehend geführte streitbetroffene Verkehrsanlage primär dem Fussgänger- und Radfahrerverkehr dient (E. 3.4). Gutheissung. · --- · Stichworte: · AUSBAU ERSCHLIESSUNG ÖFFENTLICHER VERKEHR STRASSENABSTAND WEGABSTAND · Rechtsnormen:

· § 265 Abs. 1 PBG VErV · Publikationen: · - keine - · Gewichtung: (1 von hoher / 5 von geringer Bedeutung) · Gewichtung: 3