Reg. 2 Interpretation. — DEVELOPMENT NOTIFICATION ORDER
Reg. 2 Interpretation. · DEVELOPMENT NOTIFICATION ORDER
(1) In this Order, unless the context otherwise requires
"the Act" means the Development Planning Act;
"the Authority" means the Planning Board of the Planning
Authority;
"balconies improvement scheme" means a scheme with this
name, or any such scheme, for the financial support of the repair
and replacement of timber balconies in specific localities;
"calendar year" means a period of twelve months beginning with
the day on which the development or use or any intervention
connected therewith is first begun, according to whichever is the
earliest;
"designated areas" means sites and areas identified by the
Strategic Plan for the Environment and Development or Local Plan
policies, or other planning policies, for protection, conservation or
preservation, including areas of archaeological, ecological,
geological, geomorphological, hydrological, palaeontological,
architectural, historic, artistic, or antiquarian importance, or of
natural beauty, or scientific interest, together with any specific
areas designated under the Act. Urban Conservation Areas are
excluded from this definition, without prejudice to any designated
areas overlapping onto such Urban Conservation Areas;
"Development Control Design Policy, Guidance and Standards"
m e a n s D e v e l o p m e n t C o n t r o l D e s i g n P o l i c y, G u i d a n c e a n d
Standards 2015, without prejudice to any subsequent amendments
or revisions thereto as may be approved by the Authority;
"development plan" means and includes the Strategic Plan for
Environment and Development, subject plans, local plans, action
plans and development briefs;
"distribution system operator" shall have the same meaning
assigned to it in the Electricity Regulations;
"dwelling" means a single family dwelling unit including, but not
limited to, a terraced house, villa, bungalow, flat, a receded
dwelling, penthouse, maisonette or basement permitted to be used
for residential purposes in terms of currently approved
* but see Legal Notice 164 of 2016.
Development Control Design Policy, Guidance and Standards;
"environmental impact assessment" means an environmental
planning statement carried out in accordance with the Environment
Protection Act;
"environmental planning statement" means an environmental
planning statement carried out in accordance with the Environment
Protection Act;
"existing agricultural holding" means land currently and lawfully
used for cultivation at the time the reservoir or pump chamber is
constructed;
"footprint" means the space contained within the external walls
of a building at ground floor level, including internal yards, shafts,
terraces or courtyards totally enclosed or surrounded by the
building, but excluding terraces, backyards, yards and pool decks
not totally enclosed or surrounded by the building;
"grade separated junction" means a junction where two or more
roads cross over each other at more than one level;
"highway boundary" means land which consists of an existing
road, street, square, court, alley, lane, bridge or footway;
"listed building" means a building which is itself a designated
area;
"material" includes waste, refuse, rubble and any soil imported
onto, or deposited on, the land;
"offroading" means any type of driving, manoeuvring or parking
with a motor vehicle not on a road, except for the purpose of
agriculture, maintenance of services and, or public works, or of law
enforcement and the keeping of good order;
"offroading" event" means any kind of training, racing or
rallying of an "offroading" type by a motor vehicle which are
organized by any person, or by a society or body of persons;
"operational land" or "operational building" means land or a
building used or required in connection with the movement or
maintenance of aircraft, or with the embarking, disembarking,
loading, discharge or transport of passengers, goods or livestock at
an airport, and is land or a building owned by or under the control
of the relevant airport operator;
"Outside Development Zone", hereinafter referred to as ODZ,
means land outside the boundary for development as approved by
Parliament in 2006;
"planning scheme" means a planning scheme made and approved
in accordance with the Building Permits (Temporary Provisions)
Act, 1988;
"public utility services" means and includes works related to
water distribution, sewerage and storm water undertakings,
electricity and telecommunications undertakings and any other
undertakings and structures related to the electricity infrastructure;
"ridge" means the edge of a hill or plateau, where relatively flat
or gently sl oping land giv es way to a valley si de, hi llside,
escarpment, cliff or other comparably distinct slope;
"route bus" means a vehicle constructed principally for the
carriage of seated passengers and with areas for standing
passengers to allow frequent passenger movement, licensed to
carry passengers for hire or reward and which is registered to
perform scheduled trips with the Central Office for Scheduled Bus
Transport Services;
"same style, design, and materials" means the style and design,
and the type, form and colour of the materials, used in the works
which are to be replaced and "same style" or "different style" shall
be construed accordingly;
"scheduled property" means every area, building, structure,
remains, rock formation or other geological feature, excavation or
cavity, individual tree or group of trees or woodland scheduled in
terms of articles 57 and 58 of the Act. For the purposes of this
Order, any land designated or declared as a Special Area of
Con serva ti on o r o th erwi se dec lared as p ro te cte d un der th e
Environment Protection Act shall be treated in the same manner as
scheduled property;
"scheme for traffic management" means a scheme including any
works or operations for the purpose of controlling, affecting or
altering, the direction, rate of flow, and means of movement, of
vehicular and pedestrian traffic, and includes, but is not limited to,
the alteration of road junctions or kerblines, the parking of
vehicles, restrictions on parking, loading and unloading,
pe de s tr i a n is a t io n , a nd t h e in s t a l l a ti o n o f t r a ff ic l i gh t s a nd
pedestrian crossings and any other electronic traffic control
devices;
"temporary" means any non-permanent structure or use lasting
for a limited time not exceeding thirty days, unless otherwise stated
in this Order, and which does not involve any non-reversible
intervention;
"Urban Conservation Area", hereinafter referred to as UCA,
means a historic area (village core) as identified in a planning
scheme or local plan or other currently approved planning policies;
"Urban greening project" means a project which turns an urbanised
and, or spoilt ground to a landscaped area which is designed,
implemented, and maintained to create beneficial greening spaces
within the urban landscape. Urban greening shall form public
landscaped spaces with vegetated areas, which aim is to provide
managed green settings for leisure and recreation.
(2) In this Order, words and expressions that are not otherwise
defined in this Order and are defined in the Act shall have the same
meaning as they have in the Act.
(3)
(a) In this Order, wherever reference is made to a period of
thirty days, such period shall be deemed as excluding
the period of shutdown of the Planning Authority
offices.
DEVELOPMENT NOTIFICATION
(b) For the purposes of this Order, the period of shutdown
of the Authority offices shall be that period established
by Schedule 4 of the Development Planning
(Procedure for Applications and their Determination)
Regulations.
(4)
(a) With reference to any scheduled property that already
incorporates a protective buffer zone, and Areas of
High Landscape Value, any buffer distance of thirty
metres mentioned in the Schedules to this Order shall
not apply.
(b) In the case of an already existing building on property
that is not ODZ and that is scheduled or designated
solely on the basis of features located underground,
and if the new development is located entirely above
ground, the notification procedure established in
article 5(1) and (3) shall replace any restriction that
would otherwise be entailed by such scheduling or
designation, and the provisions of article 5(5) shall not
apply.
(c) In the case of property that is not ODZ and that is
scheduled or designated solely on the basis of
landscape value, any restriction on permitted
development that is entailed by such scheduling or
designation shall not apply in respect of -
(i)
trenching operations or other underground works
which do not permanently affect the land
surface, provided that the land is completely and
immediately returned to its original condition
once the works have been completed; and
(ii) internal alterations that do not affect the external
appearance of the building. The notification
procedure established in article 5(1) and (3)
shall apply, and the provisions of article 5(5)
shall not apply.
(d) Wherever there is a difference in opinion between the
Authority and any other party, or any need for
interpretation, as to whether a development -
(i)
is aesthetically or otherwise compatible with its
location; or
(ii) affects or alters materially the character and, or
Permitted development and, or the context of the
building or site and its surroundings; or
(iii) meets any requirement of this Order, whether
explicit or implied,
the opinion of the Authority shall prevail.