Legislator Giurisprudenza & Legislazione
ln_2008_24 MT

Reg. 2 — Methods (Amendment) Regulations, 2008

Malta Government Gazette — Legal Notice 2008 24 — Methods (Amendment) Regulations, 2008
Apri la fonte ufficiale Atto completo (6 Articoli) Versione Markdown leggibile dalle macchine (.md)

Reg. 2 · Methods (Amendment) Regulations, 2008

(1) For Schedule 1 of the principal regulations, there shall Amends Schedule I

of the principal

be substituted the following>

regulations.

“SCHEDULE I ∗

Based on Annex I of the Directive

EEC PATTERN APPROVAL

1. APPLICATION FOR EEC PATTERN APPROVAL

1.1. The application and the correspondence relating to it shall be drawn up in an

official language of the State to which the application is made in accordance with

the laws of that State. The Member State has the right to require that the annexed

documents should also be drawn up in that same official language.

∗ See the Appendix to Schedules I and II.

1.2. The application shall contain the following information

- name and address of the manufacturer or firm, of his or its authorized

representative or of the applicant, and the place or places of manufacture of the

vessels,

- category of the vessel,

- intended use or prohibited uses,

- technical characteristics,

- trade name, if any, or type.

1.3. The application shall be accompanied by two copies of the documents

required and in particular

1.3.1. A description including

- the materials specifications, the methods of construction and the strength

calculations for the vessel,

- any safety devices fitted,

- the places where the approval and verification marks specified in these

regulations are to be affixed, as well as the other marks specified in the

Schedules V, VI and VII.

1.3.2. The general plans and, where appropriate, detailed drawings of important

design features.

1.3.3. Any other information provided for in Schedules V, VI and VII.

1.3.4. A statement certifying that no other application for EEC pattern approval

has been submitted for the same pattern of vessel.

2. EXAMINATION FOR EEC PATTERN APPROVAL

2.1. The examination for EEC pattern approval shall be carried out on the basis

of the plans and, where appropriate, on sample vessels.

The examination shall entail

(a) checking of the design calculations, method of manufacture, workmanship

and materials;

(b) where appropriate, checking of the safety devices and measuring equipment

and the methods of installation.

← Reg. 1 Methods (Amendment) Regulations, 2008 Reg. 3 →

Ti chiedi come si applica questa disposizione alla tua fattispecie?

Analizza questa norma insieme alla giurisprudenza, ai commentari e alle disposizioni correlate in Legislator AI.

Apri in Legislator →