Portuguese court dismisses new work embargo exception when preparatory acts precede actual construction start.
Sintesi Legislator
Generato dall'IAThe Tribunal da Relação do Porto dismissed the appellant's peremptory exception regarding the destination of the sold property for construction. The facts show the appellant attempted to oppose a new work embargo but failed to raise this as a preliminary plea in the subsequent preference action. The court ruled that mere preparatory acts, such as marking the land, do not constitute the commencement of work required to justify the embargo.
Regesto Legislator
UfficialeEMBARGO DE OBRA NOVA EXCEPÇÃO PEREMPTÓRIA ACTO PREPARATÓRIO
Parole chiave
Generato dall'IADisposizioni normative citate
Generato dall'IATesto completo
[DATA DEC. RECORRIDA] 10/29/1998
[Nº CONVENCIONAL] JTRP00025468
[Nº DO DOCUMENTO] RP199903119930296
[PRIVACIDADE] 1
[PROCESSO NO TRIBUNAL RECORRIDO] 35-B/96
[TEXTO INTEGRAL] N
[TRIBUNAL RECORRIDO] T J LOUSADA
[URL] https://www.dgsi.pt/jtrp.nsf/56a6e7121657f91e80257cda00381fdf/4D4EE16CF06CA2F48025686B0067271D?OpenDocument
SUMÁRIO
I - Se o agravante não deduziu oposição ao embargo de obra nova requerido pelo agravado como preliminar de acção de preferência que intentou contra aquele, relativamente à compra e venda de um prédio rústico seu, para intimar o adquirente a que não cause ao prédio objecto da preferência lesão grave e irreparável, não pode inserir nas conclusões do recurso a excepção peremptória de que o prédio vendido se destinava à construção.
II - Para que proceda a providência cautelar de embargo de obra nova, torna-se indispensável que a obra se tenha iniciado, o que não acontece com meros actos preparatórios.
III - É acto preparatório da construção em terreno rústico a " colocação de madeiramento e estacas de demarcação e alinhamento do terreno com a colocação de fio, balizando determinada área do terreno objecto de preferência ".