IEHC 620 ECLI:IE:HC:2016:620 Generato dall'IA

High Court denies injunction for unauthorized quarry development, deferring to planning authority enforcement.

Numero d'incarto IEHC 620
Autorità giudiziaria
Giurisdizione Irlanda (IE)
Data della decisione
Esito del giudizio Respinto (Dismissed)

Sintesi Legislator

Generato dall'IA

The High Court dismissed An Taisce's application for an injunction against McTigue Quarries Limited for continuing unauthorized quarry development. While the court found the quarrying activities exceeded the scope of a substitute consent, it declined to issue relief because no planning authority had yet taken enforcement action. The decision prioritized the role of statutory planning authorities over judicial intervention in the absence of an imminent threat to the environment.

Regesto Legislator

Generato dall'IA

Section 160 of the Planning and Development Act 2000; Section 3 of the Environment (Miscellaneous Provisions) Act 2011: The High Court may exercise its discretion under s.160 to grant injunctive relief for unauthorized development, but will defer to planning authorities if no enforcement action has been threatened, reserving judicial intervention for cases involving imminent and serious threats to the environment.

Parole chiave

Generato dall'IA
unauthorized quarry development substitute consent planning injunctive relief discretion planning authority enforcement environmental protection law

Disposizioni normative citate

Generato dall'IA

Giurisprudenza citata

Generato dall'IA

Ti chiedi come si applica questa sentenza alla tua fattispecie?

Analizza questa decisione insieme alla legislazione federale e cantonale, ai commentari e alla giurisprudenza successiva in Legislator AI.

Apri in Legislator →

Testo completo

Neutral Citation [2016] IEHC 620

THE HIGH COURT

[2015 No: 302MCA]

IN THE MATTER OF THE PLANNING AND DEVELOPMENT ACTS, 2000-2011 AND IN THE MATTER OF AN APPLICATION PURSUANT

TO SECTION 160 OF THE PLANNING AND DEVELOPMENT ACT, 2000

BETWEEN

AN TAISCE – THE NATIONAL TRUST FOR IRELAND

APPLICANT

AND

McTIGUE QUARRIES LIMITED & GARY McTIGUE AND CAROLINE McTIGUE

RESPONDENTS

JUDGMENT of Mr Justice Max Barrett delivered on 8th November, 2016.

I. Overview

1. The respondents operate a quarry in County Galway. The total quarry area is about 12.1 hectares, with the extracted area

comprising about 8.6 hectares. The quarrying involves a number of processes and activities. These include the blasting, crushing and

grading of rock. There are also truck movements in and out of the quarry. It appears not to be disputed that the quarry is in an area

of scenic beauty and some environmental significance.

2. Back in 2010, significant changes to planning law as it relates to quarries were effected by way of the Planning and Development

(Amendment) Act 2010. The changes were necessary because of the decision of the Court of Justice in Commission of the European

Communities v. Ireland(Case C-215/06). Among the changes made were the establishment of a substitute consent process whereby

the legal position of quarry developments that had been done without an environmental impact assessment (EIA), screening for an

EIA, or appropriate assessment (AA) could apply for a ‘substitute consent’.The key provision in this regard was a new s.261A of the

Planning and Development Act 2000, as inserted by the Act of 2010. Notably, for reasons that will be identified later below, a

substitute consent regularised what was done previous to the consent, and allowed the undertaking of certain remedial measures

after the consent, but, save as regards the taking of those remedial measures, it did not allow for continuing or future development of

a quarry; such continuing or future development required separate planning permission to be obtained following the issuance of the

substitute consent. (That, at least, was the sequencing before certain further amendments were made to the planning code last

year. Those amendments post-date the events in issue in this application and so, are of limited interest for the purpose of the within

proceedings).

3. In the present case, An Taisce maintains that the respondents have obtained a substitute consent but have engaged in continuing

development that is unauthorised. As a result, An Taisce has come to court seeking injunctive relief pursuant to s.160 of the Act of

2000. The granting of such relief is a discretionary remedy.

II. What is the Effect of a Substitute Consent at Law?

4. Section 177O (“Enforcement”) of the Planning and Development Act 2000 provides as follows:

“(1) A grant of substitute consent shall have effect as if it were a permission granted under section 34 of the Act and

where a development is being carried out in compliance with a substitute consent or any condition to which the consent

is subject it shall be deemed to be authorised development.

(2) Where a development has not been or is being carried out in compliance with a grant of substitute consent or any

condition to which the substitute consent is subject it shall, notwithstanding any other provision in this Act, be

unauthorised development.”

5. At first glance, a reading of s.177O(1) would suggest that the grant of a substitute consent, such as that issued by An Bord

Pleanála on 5th January, 2015, is to be treated as if it were a grant of permission under s.34. A substitute consent is not a permission

granted under s.34. However, the Oireachtas has given the same effect to both, and clearly intends that, for all intents and

purposes, a consent, insofar as it applies, is to have the same effect as a permission.

6. Of course, it is dangerous to read any statutory provision without regard to the wider context in which it was enacted. A literal

reading of one statutory provision may make perfect sense as a stand-alone reading of that provision but no sense when one has

regard to the wider picture pertaining. And s.177O is something of an example par excellence in this regard. The literal reading of

s.177O referred to above makes perfect sense if one reads s.177O in isolation. But it makes no sense when one has regard to the

wider picture pertaining.

7. As An Taisce has noted, and as the court indicated in its overview, the substitute consent process was established, following the

decision of the Court of Justice in Case C-215/06, to allow the retrospective regularisation of a quarrying development which had

been carried out in the absence of an EIA, screening for an EIA, or AA, as applicable. A substitute consent application was required to

be accompanied by a remedial EIA or a remedial Natura Impact Statement (where applicable). Such remedial statement was required

to include a statement of the significant effects, if any, on the environment (which either had occurred or were occurring or which

could reasonably be expected to occur because the relevant development was carried out). The effect of a substitute consent, An

Taisce contends, was that where remedial measures were identified in the course of the application process, these and these alone,

thanks to s.177O(1), could be done prospectively without falling foul of the planning code, unless of course there was a breach of

s.177O(2).

8. In support of its reading of s.177O, An Taisce points to s.177K(2)(d) of the Act of 2000, as inserted by S. 57 of the Act of 2010

(and as applicable when the substitute consent at issue in these proceedings was granted), and s.177K(2)(d) as since amended by

reg.6(b) of the European Union (Environmental Impact Assessment and Habitats) (No. 2) Regulations 2015. As enacted, s.177K(2)(d)

required An Bord Pleanála, when making its decision in relation to an application for substitute consent to consider, inter alia, “the

significant effects on the environment, or on a European site, which have occurred or which are occurring or could reasonably be

expected to occur because the development concerned was carried out”. (Emphasis added). As amended, s.177K(2)(d) requires

An Bord Pleanála to consider, inter alia, “the significant effects on the environment, or on a European site, which have occurred or

which are occurring or could reasonably be expected to occur because the development concerned was or is proposed to be

carried out”. (Emphasis added). The change in wording, An Taisce contends, makes clear that prospective authorisation of a

development was only contemplated in the legislation, as extant, after the substitute consent in issue in these proceedings was

granted.

9. The court accepts that this last contention is the correct reading of matters. However, in fairness, the argument might perhaps be

made that Government simply decided to make express in the amended s.177K(2)(d) what it already considered was apparent in

s.177K(2)(d), as enacted. And one does enter rather odd territory in seeking to construe the meaning of legislation by reference to

legislation that did not exist when either the legislation that one is seeking to construe was enacted, or when a particular action

(here the granting of the substitute consent) was done. Much more persuasive, therefore, to the court’s mind, is An Taisce’s correct

contention that s.177O must be interpreted in the light of Ireland’s obligations under European law. After all, the substitute consent

procedure arose out of the State’s obligation to comply with European law, in particular the problems identified by the Court of Justice

in Case C-215/06. In that judgment, the Court of Justice observed, inter alia, as follows:

“…Findings of the Court

49 Member States must implement Directive 85/337 as amended in a manner which fully corresponds to its

requirements, having regard to its fundamental objective which, as is clear from Article 2(1), is that, before

development consent is given, projects likely to have significant effects on the environment by virtue, inter alia, of their

nature, size or location should be made subject to a requirement for development consent and an assessment with

regard to their effects (see, to that effect, Case C 287/98 Linster [2004] ECR I 723, paragraph 52, and Case C 486/04

Commission v Italy [2006] ECR I 11025, paragraph 36).

50 Further, development consent, under Article 1(2) of Directive 85/337 as amended, is the decision of the competent

authority or authorities which entitles the developer to proceed with the project.

51 Given that this wording regarding the acquisition of entitlement is entirely unambiguous, Article 2(1) of that directive

must necessarily be understood as meaning that, unless the applicant has applied for and obtained the required

development consent and has first carried out the environmental impact assessment when it is required, he cannot

commence the works relating to the project in question, if the requirements of the directive are not to be disregarded.

52 That analysis is valid for all projects within the scope of Directive 85/337 as amended, whether they fall under Annex

I and must therefore systematically be subject to an assessment pursuant to Articles 2(1) and 4(1), or whether they fall

under Annex II and, as such, and in accordance with Article 4(2), are subject to an impact assessment only if, in the

light of thresholds or criteria set by the Member State and/or on the basis of a case by case examination, they are likely

to have significant effects on the environment.

53 A literal analysis of that kind of Article 2(1) is moreover consonant with the objective pursued by Directive 85/337 as

amended, set out in particular in recital 5 of the preamble to Directive 97/11, according to which ‘projects for which an

assessment is required should be subject to a requirement for development consent [and] the assessment should be

carried out before such consent is granted’.

54 As the Irish legislation stands, it is undisputed that environmental impact assessments and planning permissions

must, as a general rule, be respectively carried out and obtained, when required, prior to the execution of works. Failure

to comply with those obligations constitutes under Irish law a contravention of the planning rules.

55 However, it is also undisputed that the Irish legislation establishes retention permission and equates its effects to

those of the ordinary planning permission which precedes the carrying out of works and development. The former can

be granted even though the project to which it relates and for which an environmental impact assessment is required

pursuant to Articles 2 and 4 of Directive 85/337 as amended has been executed.

56 In addition, the grant of such a retention permission, use of which Ireland recognises to be common in planning

matters lacking any exceptional circumstances, has the result, under Irish law, that the obligations imposed by Directive

85/337 as amended are considered to have in fact been satisfied.

57 While Community law cannot preclude the applicable national rules from allowing, in certain cases, the regularisation

of operations or measures which are unlawful in the light of Community law, such a possibility should be subject to the

conditions that it does not offer the persons concerned the opportunity to circumvent the Community rules or to

dispense with applying them, and that it should remain the exception.

58 A system of regularisation, such as that in force in Ireland, may have the effect of encouraging developers to forgo

ascertaining whether intended projects satisfy the criteria of Article 2(1) of Directive 85/337 as amended, and

consequently, not to undertake the action required for identification of the effects of those projects on the environment

and for their prior assessment. The first recital of the preamble to Directive 85/337 however states that it is necessary

for the competent authority to take effects on the environment into account at the earliest possible stage in all the

technical planning and decision-making processes, the objective being to prevent the creation of pollution or nuisances

at source rather than subsequently trying to counteract their effects.”

10. Having regard to the above-quoted findings, it does not appear to this Court that it can sustainably be argued, consistent with

European law, as identified by the Court of Justice, that a substitute consent, such as the one at issue in the within proceedings,

could authorise works that would require an EIA, without such an EIA being undertaken in advance of the works being carried out. Put

plainly, a substitute consent regularises what was done previous to the consent, and allows the undertaking of certain remedial

measures after the consent, but does not otherwise allow continuing or future development of a quarry: such continuing or future

development requires separate planning permission. So when the respondents contend, as they have contended, that (a) the

substitute consent is not retrospective or historical only, and (b) a development that complies with a substitute consent is deemed

(in every respect) to be authorised development, it appears to the court that contention (a) is misdirected and both contentions are,

with respect, wrong. Contention (a) is misdirected because that is not what An Taisce has argued. And both contentions are wrong

because, for the reasons identified in this judgment, the court has found that the more nuanced interpretation offered by An Taisce is

the correct interpretation of statute when one looks beyond the wording of s.177O to the legal back-drop to that provision, most

notably to Case C-215/06, and the deficiencies in Irish law which that judgment identified and which the relevant provisions of the

Act of 2010 were intended to cure.

11. Notably, in the present case, no evaluation or examination of future works (as opposed to remedial or restorative works) has been

undertaken, none of the assessments required under s.172 or s.177S and s.177T of the Act of 2000 are recorded as having been

undertaken on the works now being carried out, and current and future site-development is not regulated by any conditions. The only

conditions in the substitute consent relate to remedial or restorative works. There are none of the conditions that one would expect

in a permission for a prospective quarry development, e.g., as to ultimate quarry depth, opening hours, blasting, emissions limits or

extraction rate limits. Indeed the court is left with the abiding impression that these are matters that would have been addressed in

any permission that might have issued pursuant to any such s.34 application as followed the issuance of the substitute consent. In

short, An Taisce appears to the court to be correct in its assertion that the respondents, through their ongoing acts of excavation,

are presently engaging in “unauthorised development” within the meaning of section 2(1) of the Act of 2000 [1]. Given this finding, it

does not appear to the court to be necessary to consider whether the respondents have acted in breach of the substitute consent,

though it does not see on the evidence before it that they have. The only question arising for the court therefore is whether to grant

the injunctive relief sought.

[1] “Unauthorised development” is defined in s.2(1) of the Act of 2000 as meaning “in relation to land, the carrying out of any

unauthorised works (including the construction, erection or making of any unauthorised structure) or the making of any

unauthorised use”. The word “development”, as defined in s.2(1) includes “the carrying out of any works on, in, over or under land”.

And the word “works”, also defined in s.2(1), includes “any act or operation of…excavation”.

III. Section 160 proceedings

12. AnTaisce has brought these proceedings pursuant to s.160 of the Act of 2000. So far as relevant to the within proceedings, s.160

provides as follows:

“(1) Where an unauthorised development has been, is being or is likely to be carried out or continued, the High Court…

may, on the application of a planning authority or any other person, whether or not the person has an interest in the

land, by order require any person to do or not to do, or to cease to do, as the case may be, anything that the Court

considers necessary and specifies in the order to ensure, as appropriate, the following:

(a) that the unauthorised development is not carried out or continued;

(b) in so far as is practicable, that any land is restored to its condition prior to the commencement of any

unauthorised development;

(c) that any development is carried out in conformity with –

(i) in the case of a permission granted under this Act, the permission pertaining to that development

or any condition to which the permission is subject…

(2) In making an order under subsection (1), where appropriate, the Court may order the carrying out of any works,

including the restoration, reconstruction, removal, demolition or alteration of any structure or other feature….

(6)…

(ab) Notwithstanding paragraph (a) or (aa) an application to the High Court…may be made at any time for an

order under this section to cease unauthorised quarry development…

(b) Notwithstanding paragraph (a), an application for an order under this section may be made at any time in

respect of any condition to which the development is subject concerning the ongoing use of land.”

13. The respondents maintain that the complaints made in these proceedings ‘engage’ three prior decisions of the planning authorities

and represent an impermissible attempt to impeach those decisions through the medium of s.160. Those three decisions are (1) a

decision by Galway County Council of 27th April, 2007, to register the quarry pursuant to s.261 of the Act of 2000, (2) a decision of

the planning authority on 3rd August, 2012, that the quarry commenced operation prior to 1st October, 1964, and was therefore

eligible to apply for substitute consent, and (3) a decision of An BordPleanála of 5th January, 2015, pursuant to s.261A, to grant a

substitute consent. It is not clear to the court, from the argument before it, how assiduously An Taisce contends that the quarry

that is the subject of the within application did not commence in operation prior to 1st October, 1964. Equally, however, it does not

appear to the court that the true purport of the within proceedings is concerned with the substitute consent process that was

undertaken or which resulted in the just-mentioned decisions. The true purport and focus of these proceedings is that the

respondents, it is alleged by An Taisce and accepted by the court, are engaged in activities which are not covered by the substitute

consent. So the substitute consent process and all that goes with it sit to one side. This application is concerned with continuing

development that sits outside the scope of the substitute consent. Of course, one cannot tell what is outside the scope of the

substitute consent without having regard to what is within its scope. However, if the respondents are contending, and the court does

not understand them to contend, that even this limited exercise is impermissible, then they are, with respect, mistaken. Such an

approach would have the effect that no section 160 application could be brought in respect of a development thought to be within

the scope of a planning permission or substitute consent, no matter how genuinely a party believed the contrary to present, and that

would be absurd. Nor does the court consider that the involvement of An Taisce or any connected person in the process that yielded

the substitute consent precludes An Taisce from later contending in a s.160 application, and as it contends here, that there are

elements of ongoing development that are not caught by the substitute consent and which represent, in the circumstances

presenting, unauthorised development.

IV. Some Case-Law Applicable to Section 160 Proceedings

14. Section 160 has been construed on numerous occasions by the Superior Courts and the respondents contend that the below-

mentioned propositions of principle can be identified in the relevant case-law. The court accepts propositions 1 to 3, as identified by

the respondents, to be established law. For the reasons given below, the court does not accept that principles 4 and 5, as posited by

the respondents, are correct as a matter of law.

Proposition #1

Section 160 must be strictly construed.

15. That this is so follows from the observation of Denham J. in Mahon v. Butler [1997] 3 I.R. 369, at 376 that “The planning code

should be construed strictly. Actions can and do have grave financial and social repercussions.”

Proposition #2

The applicant bears the onus of proof in a s.160 application.

16. That this is so is apparent, inter alia, from the judgment of the Supreme Court in Fingal County Council v. Kennedy [2015] IESC

72. Proposition #3

An applicant must adduce evidence to discharge the said onus of proof.

17. That this is so follows from the observation of Hedigan J. in Smyth v. Dan Morrissey Ireland Ltd (Unreported, High Court, 25th

January, 2012), at para.6.3, that “It seems to me that in circumstances where the applicant wishes to alter the status quo…it is for

the applicant to adduce evidence proving that what he asserts is true…”.

Proposition #4

Any assertion on affidavit which is not contradicted is deemed to have been established on the balance of probabilities.

18. In this regard, the court has been referred to the decision of O’Donovan J. in Ryan v. Roadstone [2006] IEHC 53. However, the

court does not see that this case is authority for what, in truth, would seem a quite unusual principle. Although the court’s attention

was not drawn to the specific element of the Ryan judgment that is considered to be authority for this fourth principle, it seems likely

that it is derived from O’Donovan J.’s second conclusion under the heading “Conclusions” that “In the light of the uncontroverted

assertion by Patrick Martin that the Western Quarry permission was not operational at any material time hereto, I am not

persuaded that the respondent contravened condition 13 of that permission whereby all vehicles carrying quarried or other dust

producing materials to or from the site of the permission were required to be sheeted”. However, all this observation conveys to this

Court is that given a particular uncontroverted assertion, O’Donovan J. was not persuaded of the contrary. However, O’Donovan J.

(rightly) does not close his mind to the possibility that he might have been persuaded of the contrary. For the principle as espoused

by the respondents would have as its result that a patently wrong assertion could be made in affidavit and fall thereafter, thanks

perhaps to mere oversight on the part of opposing counsel, to be deemed to have been established on the balance of probabilities.

Proposition #5

The High Court, under s.160, does not have jurisdiction to entertain a contention that a development is unauthorised development.

19. In this regard, the respondents have pointed to Cantwell v. McCarthy [2005] IEHC 351. However, it does not appear to the court

that Cantwell is authority for such a sweeping proposition. Indeed it would seem odd that in an application for an injunction in relation

to an unauthorised development, the court would not have jurisdiction to entertain a contention that the development in issue was

an unauthorised development. Rather, Murphy J. concludes in this regard in Cantwell, at para. 9.3, that “[A]n application for an order

pursuant to s.160 must fail so long as the permission remains unrevoked.” The distinction between this proposition and the wider

proposition proffered by the respondents in this case appears to the court to be of some significance. For Cantwell was a case in

which planning permission had issued and had not been revoked; here, by contrast, the central plank of An Taisce’s case is that no

planning permission has ever issued. That An Taisce would be allowed to contend that no planning permission has ever issued but that

the court would not have jurisdiction to entertain the unavoidably linked contention that the development in issue is not an

unauthorised development would make no sense in practice or in law. Thus, the court considers that it does have jurisdiction to

entertain the contention that planning permission has never been granted and must therefore, as a matter of logic, have jurisdiction

to entertain the inextricably linked contention that the development which would have been the subject of such planning permission,

had it been granted, is an unauthorised development.

V. Nature of Section 160 Procedure

20. The respondents contend that s.160 establishes a ‘summary type’ procedure that is not an appropriate vehicle through which to

resolve novel questions of law or complex questions of fact. In this regard, they point to dicta concerning s.27 of the Local

Government (Planning & Development) Act 1976, as amended which referred to s.27 as a “fire brigade section” (Dublin Corporation v.

McGowan [1993] 1 I.R. 405, 411) and suggested that “novel questions of law and complex questions of fact…could not be dealt with

readily in summary proceedings” (Waterford County Council v. John A Woods [1999] 1 I.R. 556 at 563). A number of points might be

made in this regard. First, the court is not bound by dicta concerning a repealed provision that has been succeeded by a provision

which establishes a much-amended and streamlined procedure, though such dicta may, of course, provide illuminating guidance as

regards the proper interpretation of the later provision. Second, the Rules of the Superior Courts anticipate that oral evidence may be

given in s.160 proceedings. The notion that novel questions of law and complex questions of fact cannot be decided in proceedings

where oral and affidavit evidence may be given, albeit that such proceedings typically proceed by way of affidavit evidence, and

where parties/counsel may put such arguments as they will does not hold true. If that were the case then, in truth, there would be

no case in which such questions could be decided. Third, if it were true that s.160 proceedings were not an appropriate vehicle

through which to resolve cases presenting novel questions of law or complex questions of fact, then injunctive relief by way of s.160

would be impossible to obtain in such cases. There is nothing in s.160 to suggest that the Oireachtas thought that in such cases,

injunctive relief by way of s.160 should be unavailable. And it ill-behoves the courts to impose constraints that our elected lawmakers

did not envision and which the law does not otherwise require. Fourth, it is not beyond the wit of counsel learned in the law to

identify in likely every s.160 application some putative question of law or fact which would purportedly take such application outside

the scope of s.160, even though, again, there is nothing in s.160 to suggest that our elected lawmakers aimed at such an end where

such a question presents. Fifth, even if the respondents were correct that s.160 establishes a ‘summary type’ procedure that is not

an appropriate vehicle through which to resolve novel questions of law or complex questions of fact (and the court does not consider

that the respondents are correct in this regard) the court does not consider any novel question of law or complex question of fact to

present in the within application in any event.

VI. Discretionary Nature of Section 160 Relief

21. It is clear from the use of the word “may” in s.160(1) that the nature of the relief to be granted pursuant thereto is discretionary.

And though the discretionary nature of the relief does not flow from the absence of locus standi requirements in s.160, it is

undoubtedly true, as Barrington J. opined, in respect of the since repealed s.27 of the Act of 1976, in Avenue Properties Ltd v. Farrell

Homes Ltd [1982] I.L.R.M. 21 that the absence of such requirements makes it “all the more important that the Court should have a

wide discretion as when it should and when it should not intervene”. The court has been referred to a number of helpful cases in

which this discretionary power has previously been exercised, and the factors considered to be of relevance in the exercise of same:

(i) Public Interest

- in Leen v. Aer Rianta (Unreported, High Court, 31st July 2003), as recently cited with approval by the Supreme Court in

Derrybrien v. Saorgas Energy Limited [2015] IESC 77, McKechnie J. took into account the public interest in ensuring that

an airport was not closed down and noted that in general any element or feature of public interest which arises from the

particular circumstances can be taken into account.

(ii) Commercial Impact

- in AmphitheatreIreland Ltd. v. HSS Developments [2009] IEHC 464, Hedigan J., at para. 41, took into account the

“beneficial impact in terms of employment, the influx of people to related facilities at Citywest including the hotel, and

the long-term viability of the hotel and the Citywest complex”.

(iii) Undue Hardship

- in Wicklow County Council v. Jessup & Smith (Unreported, High Court, 8th March, 2011), Edwards J. declined to make an

order where “the consequences would be devasting for the respondents”; this attentiveness to the issue of undue

hardship that may present for the respondents is also evident in the earlier line of case-law concerning the since repealed

s.27 of the Act of 1976 (see, for example, Avenue Properties).

(iv) Opinion of planning authority

- the opinion of the planning authority is relevant (see, for example, Grimes v. Punchestown Developments Company Ltd.

[2002] 1 I.L.R.M. 409 and Smyth v. Dan Morrissey Ireland Ltd., op. cit.).

(v) Behaviour of Parties

- Clearly when it comes to the granting of discretionary relief, indeed likely when it comes to the fashioning generally of

reliefs, the court, as a court of conscience, will have regard to the previous conduct of the parties. Here certain

references have been made to the behaviour of a Mr Sweetman with whom An Taisce appears to have liaised. However,

he does not appear to be an agent or employee of An Taisce, the applicant in these proceedings, and thus his actions

cannot be attributed to An Taisce. There is also a general assertion that An Taisce has adopted contradictory positions in

its submissions in this application and during the substitute consent process. This, the court presumes, is a reference to

what seems to be An Taisce’s varying position (as described by Mr McTigue in his affidavit evidence) as regards whether

there was quarrying before 1964. However, this historical detail seems to the court to be very much an issue on which a

party, based on the information to hand at any one time, could, quite legitimately, take a varying position.

VII. Conclusion as to Injunctive Relief Sought

22. The court is loath to grant an injunction that would effectively halt a viable and, it would seem, long-standing business from

continuing in operation, with all the adverse consequences that this could bring for the owners and any employees. However, for the

reasons identified above, the court considers that the respondents are engaged in unauthorised development that ought to be the

subject of planning permission and which is not covered by the substitute consent that has been obtained. There is clearly a public

interest in the promotion of legitimate commercial enterprise. However, there is also a public interest on the part of those now living,

and those yet to come, in the protection of our natural environment to the level, and in the manner, contemplated by law. So what is

the court to do?

23. Notwithstanding the potential for injunctive relief via s.160, the primary enforcers of planning and development law are planning

authorities. And in this regard, a particularly striking feature of the case at hand, and a factor that has largely driven the court to the

conclusion that it has reached as to how to exercise its discretion under s.160 in this instance, is that no enforcement action has

been taken to this time; indeed the court does not see in the papers before it that any such action has even been threatened at any

time. So if there is, and there is, when it comes to the respondents’ quarrying business, a difficulty presenting as regards planning

permission, there does not seem to be that type of imminent and serious threat to the environment that the court considers would

justify it in supplanting the planning authority in its apparent view of matters and electing, from a remove, to wield the sledgehammer

of injunctive relief.

24. Having regard to all of the foregoing, the court has decided, on balance, not to grant the injunctive relief now sought. Of course,

the court’s decision does not preclude the planning authority from taking enforcement action now or at some future time, a factor

which the respondents may wish most earnestly to consider when resolving how best to proceed after the court delivers the within

judgment.

VIII. Application for Protective Costs Order

25. Separate to the principal motion in these proceedings, An Taisce has made application for an order pursuant to s.7 of the

Environment (Miscellaneous Provisions) Act 2011 declaring that s.3 of that Act applies to the within proceedings. It did not appear

that this was a matter of much contention between the parties; neither was it a matter of agreement between them. So the court

will adjudicate on the point. These are civil proceedings within the meaning of s.4(1)(a) and (b) of the Act of 2011 and that do not

come within s.4(3) of that Act. They are therefore proceedings to which s.3 of the Act of 2011 applies. They are also proceedings in

which An Taisce has succeeded in its contentions as to the true legal purport of a substitute consent, albeit that the court has

elected, in its discretion, not to grant the injunction sought. Having succeeded on the law, An Taisce may consider that an order of

costs in its favour, pursuant to s.3(4) of the Act of 2011, is merited. As the court has not heard any argument on this aspect of

matters, it will refrain from making any order as to costs until it has heard the parties further in this regard.