Legislator Jurisprudence & Législation
III 2017 199 • VG SZ III 2017 199 Généré par l'IA

Appeal Regarding Demolition and Expansion in Open Space Zone

Numéro de cause III 2017 199
Autorité / Tribunal
Juridiction Suisse · Canton de Schwytz (CH-SZ)
Date de la décision

Synthèse Legislator

Généré par l'IA

The case involved an appeal against the rejection of a request for building permission concerning the demolition of an existing structure and the construction of a new, larger building on a property located in an area designated for open space and recreation, where the existing structure was legally non-conforming due to its location within this designated zone. The court upheld the lower instances' decision to deny the permit, reasoning that the proposed project constituted a significant expansion that contravened the established land use plan, which mandates that such areas remain predominantly open and that structural development, especially enlargement, is generally prohibited absent specific, exceptional planning justifications that were not met in this instance.

Regeste Legislator

Généré par l'IA

Appeal Regarding Demolition and Expansion in Open Space Zone: The court upheld the lower instances' decision to deny the permit, reasoning that the proposed project constituted a significant expansion that contravened the established land use plan, which mandates that such areas remain predominantly open and that structural development, especially enlargement, is generally prohibited absent specific, exceptional planning justifications that were not met in this instance.

Mots-clés

Généré par l'IA
permis de démolir zone à bâtir promotion immobilière qualité pour recourir contre permis approbation des plans plan directeur Planungs- und Baurecht (Baubewilligung) | Planungs- und Baurecht
Généré par l'IA

Vous souhaitez savoir comment cet arrêt s'applique à votre dossier ?

Analysez cette décision avec la législation fédérale, le droit cantonal, la doctrine et la jurisprudence subséquente dans Legislator AI.

Ouvrir dans Legislator →

Texte complet

\n \n \n \n \n

\n\n| | | |\n III 2017 199 |\n |\n \n\n

\n \n \n

\n\n| | | |\n |\n Entscheid vom 23. Februar 2018 |\n \n\n

\n \n \n

\n\n| | | |\n Besetzung |\n lic.iur. Achilles Humbel, Präsident |\n \n|\n |\n Ruth Mikšovic-Waldis, Richterin Dr.oec. Andreas Risi, Richter |\n \n|\n |\n MLaw Joëlle Sigrist, Gerichtsschreiberin |\n \n\n

\n \n \n

\n\n| | | |\n Parteien |\n A.________ und B.________, \n Beschwerdeführer, \n vertreten durch Rechtsanwalt M.________, |\n \n|\n |\n \n|\n |\n gegen |\n

\n|\n |\n \n \n1. Gemeinderat Freienbach, Unterdorfstrasse 9, Postfach 140, 8808 Pfäffikon, \n vertreten durch Rechtsanwalt N.________,, \n2. Amt für Raumentwicklung ARE, Bahnhofstrasse 14, \n Postfach 1186, 6431 Schwyz, \n3. Regierungsrat des Kantons Schwyz, Bahnhofstrasse 9, \n Postfach 1260, 6431 Schwyz, \n Vorinstanzen, |\n

\n\n

\n