Order Establishing the Fee Schedule for Geomatics and Land Registry Services, March 4, 2026 - Purpose
Table of Provisions (44)
Statutory Text (44 Articles)
This order specifies the fees and disbursements collected for services performed by the Geomatics and Land Registry Service (hereinafter: the Service).
Fees and disbursements are owed by the person requesting the services.
The value-added tax is not included in the amount of the stipulated fees. It is charged additionally, in accordance with the relevant federal provisions for services that are subject to it.
A fee calculated based on time spent may be charged
a) for any information provided requiring more than 15 minutes;
b) in the case of a particularly complex matter, out of the ordinary, or one that involves an exceptionally long processing time, in addition to the fees provided for by this order.
The fee based on the time spent is billed according to the following hourly rate
a) service management, including land registry conservator
- CHF 184
b) geomatics engineer, deputy conservator
- CHF 160
c) geomatics technician / qualified specialist / assistant conservator
- CHF 136
d) geomatician
- CHF 112
e) technical or administrative staff
- CHF 104
f) apprentice
- CHF 76
For any extract from the land register, there is a fee per property.................
20.–
1 For the issuance of the following documents, the following fees are due
a) copy of a supporting document .................................................................
10.–
b) certified true copy ..................................................................................
40.–
c) series information extracted from the database, per document prepared and delivered
30.–
2. A maximum of 50 francs will be charged for documents from the same condominium ownership file.
1. Online access to the land registry database incurs the following fees, per request related to a property number
Fr.
a) for notaries......................................................................................
5.–
b) for other holders of access to all registered rights.............................
10.–
c) for holders of access to part of the registered rights..........................
10.–
2. The cantonal administrative services and offices, as well as the communes of Neuchâtel, are exempt from fees.
Online access to the document consultation platform gives rise to the following fees
Fr.
a) per condominium file.................................................
25.–
b) per servitude.....................................................................................
10.–
30.– A legal notice, rejection decision, or any other decision is owed.........
Owed
a) for certification of the registration of the operation in the ledger................
10.–
b) for certification of registration in the journal, certificate of ownership, or for any other legal certification to be established.................................................................
30.–
3. A fee is due for a request for supplement, request for correction, issuance of permission for late filing, drafting of a requisition, drafting of a consent to cancellation, or for any other document to be issued..............................................................
30.–
10.– An ad valorem fee under Article 9 of the LERF is due for each transferred property if it is collected......................................................................................................
Art. [Numbering consistent with original]
A fee is due for the modification of ownership title in the property, without a transfer of ownership, base amount of
50.–
Additionally, per property ..........................................................................
10.–
300.– is due per condominium property file: establishment, modification.
It is due upon registration of a building............................................ 50.–
Fr.
There is a fee for the cadastral plan for updating the descriptive state
15.–
Additionally, per building..........................................................................
10.–
150.–
There is a duty by servitude, by land charge: constitution, modification, assignment.
Owed
a) by annotation: constitution, modification, transfer.........................
80.–
b) by annotation and per real estate: report...........................................
10.–
Fr.
It is due by mention: creation, modification..................................
80.–
Fr.
For any modification of a pledge for which no ad valorem fee is charged, a pledge is due.................................................................................................
100.–
**1. It is due by registration of a creditor..................................................
50.–**
It is due
Fr.
a) per paper mortgage certificate issued at the time of constitution…….
100.–
b) per paper mortgage certificate issued during modification, update……………………………………………………………………..
50.–
30.– A conventional rank registration is due.
If a requisition or any other request results in several actions each subject to a fee, the various fees shall be cumulated.
1. For the postponement, registration, or modification of easements and mentions during the drafting of a mutation plan, in accordance with Article 743 CC [4], the following fees are due per easement and per mention
Fr.
for the first property.............................................................................
45.–
for each subsequent one.....................................................................
15.–
minimum per summary table..............................................................
45.–
2. For the revision of a file of easements and mentions, the fee is
Fr.
Per file...................................................................................................
45.–
For the services provided under the law on structural improvements in agriculture (LASA), dated November 10, 1999 [5], and its implementing regulation (RELASA), dated January 19, 2000 [6], the following fees are payable
Fr.
a) Reorganization and land consolidation, per owner ......................
500.–
b) Water supply, per owner .................................................................
200.–
c) Other unions, per owner ...............................................................
100.–
d) Contractual land consolidations
per owner ...........................................................................................
50.–
by consent of rights holders ..............................................................
50.–
In the creation of properties and the transfer of rights, the fees prescribed by this decree are applicable.
The procedure for the introduction of the federal land register is not subject to a fee.
1. The fees for updates are collected according to the table attached to this decree.
2. They correspond to the application index 100 (1992 price base) of the fee schedule for updates (TH33) of the Conference of Cantonal Geoinformation and Cadastre Services and the Swiss Association of Geomatics Engineers. These fees are indexed annually.
A fee of 300 francs may be charged for the coordination of official measurement data with information resulting from other legislative or regulatory provisions.
1. A corrective factor is applied for constructions according to the table below
Usable Gross Floor Area
Corrective Factor
m²
m²
%
from
1
to
50
............................................................................................................
- 50
from
51
to
100
............................................................................................................
- 40
from
101
to
150
............................................................................................................
- 30
from
151
to
200
............................................................................................................
- 20
from
201
to
250
............................................................................................................
- 10
from
251
to
300
............................................................................................................
0
from
301
to
400
............................................................................................................
+ 10
from
401
to
500
............................................................................................................
+ 20
from
501
to
750
............................................................................................................
+ 30
from
751
to
1000
............................................................................................................
+ 40
above
1000
............................................................................................................
+ 50
2. The corrective factor applies exclusively to the positions given in the annex and directly related to the alteration of the construction.
When the materialization of boundary points is deferred, the fee is charged at the time of the cadastral division.
1 The following fees are applied for the examination of files concerning the allocation of legal units of condominium properties
Fr.
Base price..............................................................................................
200.–
Per legal unit and annexes..............................................................
50.–
2. In the case of special services, these will be charged according to the time spent and the rate described in Article 5.
1. The public data from SITN is available free of charge, except for the digital data of official surveying.
2. The public data from SITN, including the digital data of official surveying, is free for research work and qualifying work (such as diploma projects, master's theses, or doctoral dissertations).
1. Access to the data on the geoportal is free.
2. The SITN offers an online service for ordering all the digital data it contains, including official surveying data, called Geoshop.
3. The terms of use for the data are governed by the general conditions published on the SITN's Geoshop.
1. Geographic services (web services) of the SITN are made available free of charge. These include the WMTS planning base, the WMS service, and the OGC API services.
2. Original data from official measurements are excluded from this provision.
3. The terms of use for these data are governed by the general conditions published on the SITN Geoshop.
1 By official cadastral survey digital data, it is understood as the 2D digital data related to the federal model of official cadastral surveying.
2. The fees for the dissemination of official cadastral survey digital data take into account
a) the investment costs, as well as the operating and maintenance costs of the data;
b) the costs of making the data available.
3. They are independent of the type of computer system and the data exchange format.
4. The rate corresponds to the application index 100 (price base 1993, index TH23 as of January 1, 1993: 1.60) of the fee schedule for digital parcel surveys (TH23) of the Conference of Cantonal Geoinformation and Cadastre Services and the IGS Association, Swiss Surveying Engineers and are indexed annually according to the recommendations of the Federal Department of Defense, Civil Protection and Sport.
5. Their maximum amount is 40,000 francs.
1. The fees for the initial dissemination of official cadastral geodata are as follows
Dissemination fees per hectare
Occasional Users
- Developed and Buildable Areas
- Agricultural and Forestry Areas located outside the mountain region
- Agricultural and Forestry Areas located in the mountain region
I
II
III
Share of costs per ha
19.90
3.50
1.40
Dissemination fees per hectare
Permanent Users
- Developed and Buildable Areas
- Agricultural and Forestry Areas located outside the mountain region
- Agricultural and Forestry Areas located in the mountain region
I
II
III
Share of costs per ha
34.10
11.30
3.10
2. For 2D data of the official cadastral survey, a minimum amount of 50 francs is charged.
1 The data may be acquired according to the following layers of information
Code
Information Layers
Costs
BATI
Only buildings for ground cover
20%
PFONC
Real estate ownership
30%
CS
Ground cover
30%
OBJ
Various objects
10%
CO
Official surveying conduits
0%
LNP
Administrative boundaries, nomenclature, and fixed points
0%
2. For public entities external to the State and cantonal and municipal public law institutions, the fees are reduced by 50%.
The annual fees for data update for permanent users are as follows
Dissemination fees per hectare
Permanent users
Built-up areas and building zones
Agricultural and forest areas located outside the mountain region
Agricultural and forest areas located in the mountain region
I
II
III
Fees per ha
5.00
0.10
0.10
The mass extraction of excerpts from the cadastre of public-law restrictions on property ownership is prohibited.
1 The following fees are due for the provision of printed plans
A4, A3
A2, A1, A0
First paper reproduction
.30.—
45.—
2. The work of preparing the plans is billed according to the time spent.
3. A fee of 5 francs is charged for the dispatch of the plans.
The Decree on the Emoluments of the Geomatics and Land Registry Services (Geomatics Domain), dated December 18, 1995 [7], and the Decree on the Fixed Emoluments Tariff of the Land Registry, dated February 16, 2005 [8], are hereby repealed.
[9] 1 This decree shall enter into force on May 1, 2026.
2. It shall be published in the Official Gazette and inserted into the Compendium of Neuchâtel Legislation.
Schedule of Fees for Updates by the Service
No.
Position
Unit
Unit Price
1.
MANDATE
1.1
Boundary Change
MANDATE
440.00
1.2
Cadastral Map Update
MANDATE
207.00
1.5
Merging of Parcels
MANDATE
220.00
2.
FIELD WORK
2.1
Planimetric Fixed Points
2.11
Research / Marking
PFP
20.00
2.12
Research with Auxiliary Tools / Marking
PFP
40.00
2.13
Re-establishment with Instrument
PFP
79.00
2.15
Inspection with Simple Tools or Instrument
PFP
32.00
2.17
Setup (including control/detail surveys)
PFP
60.00
2.110
Recognition and Measurement / New Point
PFP
143.00
2.111
Measurements on Reference Point
PFP
80.00
2.113
GNSS Initialization
100.00
2.2
Boundary Points
2.21
Research
PL
12.00
2.22
Research with Auxiliary Tools
PL
24.00
2.23
Re-establishing a Boundary Point
PL
38.00
2.24
Inspection of a Boundary Point
PL
16.00
2.25
Direct Determination of a Boundary Point
PL
20.00
2.26
Setting out with Conditions
PL
48.00
2.27
Setting out from Calculated Elements
PL
38.00
2.28
Boundary Determination within Buildings
PLX
80.00
2.29
Survey of Boundary Point and Auxiliary Boundary Point
PL/PLX
20.00
2.3
Position
2.31
Survey / Measurement of Situation Points
PT
8.00
2.32
Double Survey of Situation Points
PT
12.00
3.
MATERIALIZATION WORK
3.1
Standard Types
3.11
Installation of a New Marker
PCE
84.00
3.115
Installation of an Artificial Marker
PCE
19.00
3.12
Realignment and Wedging of a Marker
PCE
40.00
3.15
Drilling a Hole and Painting on Marker
PCE
12.00
3.16
Installation of a Dowel with Cap
PCE
19.00
3.17
Cementing a Dowel
PCE
32.00
3.18
Installation of a PFP3 Dowel
PCE
32.00
3.2
Supplementary Types
3.21
Concrete Setting of a Marker
PCE
62.00
3.22
Installation of a Cast Iron Cover
PCE
52.00
3.23
Cutting and Dressing of Coating
PCE
109.00
3.24
Extraction of Stones or Rock
PCE
62.00
3.3
Material, Supplies
3.4
Delayed Materialization
3.41
From 1 to 5 Points
PCE
220.00
3.42
From 6 to 10 Points
PCE
200.00
3.43
From 11 to 15 Points
PCE
180.00
3.44
Starting at 16 Points
PCE
150.00
3.5
Spot Re-establishment of Points
3.51
Re-establishment of PFP3
PFP
340.00
3.52
Re-establishment of Boundary Point with Materialization
PL
270.00
3.53
Re-establishment of Boundary Point without Materialization
PL
210.00
4.
OFFICE WORK
4.1
Planimetric Fixed Points
4.11
Direction Orientation Calculation
PFP
18.00
4.15
Determination of New PFP3
PFP
98.00
4.17
Determination of New PFP3 without Materialization
PFP
51.00
4.110
GNSS Initialization Control
40.00
4.2
Boundary Points
4.21
Calculation of Setting out Elements
PL
5.00
4.23
Controlled Survey Calculation
PL
13.00
4.25
Conditional Calculation
PL
6.00
4.26
Calculation According to Project
PL
11.00
4.29
Calculation of Setting out Elements
PL
5.00
4.210
Post-Materialization Control
PL
7.00
4.213
Updating Plans: New Boundary Point
PL
36.00
4.214
Deletion of Boundary Point Coordinates
PL
3.00
4.215
Updating Plans: Removed Boundary Point
PL
23.00
4.3
Situation (including buildings)
4.31
Situation Points Calculation
PT
6.00
4.32
Controlled Situation Points Calculation
PT
10.00
4.33
Calculation Linked to Geometric Conditions
PT
6.00
4.36
Updating Plans: New Situation
PT
6.00
4.37
Deletion of Situation Points Coordinates
PT
3.00
4.38
Updating Plans: Removed Situation
PT
9.00
4.4
Areas
4.41
Area Calculation / File and Mutation Table Update
PARC
71.00
4.42
Partial Areas Calculation
SPART
15.00
4.43
Calculation of Nature Area / File Update
SNAT
42.00
5.
EXPENSES
5.1
Travel and Expenses (per field work hour)
HOUR
32.00
Abbreviations
PFP
fixed point
PL
boundary point
PLX
auxiliary boundary point
PT
point
PCE
piece
PARC
parcel
SPART
partial surface
SNAT
surface nature