Legislator Case Law & Legislation
142.281.3 CH

Ordinance of the FDJP of September 22, 2014, on Construction Subsidies from the Confederation for Facilities Implementing Coercive Measures under Alien Law (foreigners) - Sectors, Areas Entitled to Subsidy, and Sector Prices

10 Articles / Provisions · Switzerland · Federal Legislation (SR / Fedlex)
Open official source Machine-readable Markdown (.md)

Table of Provisions (10)

Statutory Text (10 Articles)

étrangers

The sectors, the areas per detention place entitled to a subsidy, and the sector prices per square meter are set as follows

| Sector | Area per Detention Place Entitled to Subsidy (in m²) | Sector Price per m² (index state as of October 1, 2010) |

|-------------------------|------------------------------------------------------|--------------------------------------------------------|

| 1 Security | 1.75 | 300 |

| 2 Administration | 1.95 | 300 |

| 2a Migration Authorities| Up to 1.65 | 300 |

| 3 Staff | 1.65 | 100 |

| 4 Detainees | 7.45 | 100 |

| 5 Entry/Exit | 2.15 | 100 |

| 5a Transport | Up to 1.15 | 100 |

| 6 Accommodation | 16.46 | 700 |

| 7 Occupation | 8.63 | 600 |

| 8 Domestic economy | 5.76 | 700 |

Total area per detention place: Up to 48.1

étrangers

For buildings intended for sports practice, an area supplement of up to a maximum of 2.9 m² per detention place is granted when the facility has at least 100 detention places. The supplement is allocated to the "Inmates" sector.

étrangers

- Supplement for Exterior Arrangements of New Constructions

The supplement for exterior arrangements, including area-related supplements, amounts to 9% of the recognized costs according to groups 1 to 3 and 5 of the construction cost code Building of the Swiss Centre for Construction Rationalization Studies.

étrangers

The supplement for mobile equipment, including supplements related to the surface area, amounts to 5.7% of the recognized costs according to groups 1 to 3 and 5 of the Construction Costs Code Building of the Swiss Center for Construction Rationalization Studies.

étrangers

In the event of new construction, the per-place flat rate is calculated as follows: 1. Multiply the area in square meters by the corresponding sector price. 2. Add the products obtained in section 1 for the different sectors. 3. Add to the sum obtained in section 2: – the percentage share provided for exterior improvements; – the percentage share provided for movable equipment; – the security supplement provided.

The amount of the federal contribution is determined according to Art. 15 k OERE.

étrangers

In the case of a building renovation, the lump sum per place is calculated as follows: 1. Multiply the area in square meters by the corresponding sector price. 2. Add the products obtained in section 1 for the different sectors. 3. Multiply the sum obtained in section 2 by the degree of intervention and the renewal share. 4. Add to the product obtained in section 3: – the supplement for outdoor facilities and mobile equipment; – the supplement for security multiplied by the degree of intervention and the renewal share.

The amount of the federal contribution is determined according to Art. 15 k OERE.

étrangers

If, in the context of alteration works, a building does not achieve the defined sector surfaces for the model facility, the recognized costs per sector are reduced proportionally to the missing surface, relative to the surface eligible for a subsidy.

The missing surface in the "Living Quarters" sector can be compensated by an additional surface in the "Detainees" sector. In this case, the determining costs for the "Detainees" sector can be multiplied by a factor of up to 1.15.

Need to analyze how this provision applies to your matter?

Cross-reference this statute against case law, commentaries, and related legislative provisions inside Legislator AI.

Open in Legislator →