1. **Duties of the Municipalities**

Municipalities shall ensure a comprehensive water supply throughout the entire municipal area and shall maintain a separate account for this purpose.

2. They may transfer these duties, in whole or in part, to private water supply companies or other municipalities. In such cases, they remain responsible for supervision, the delineation of supply areas, and ensuring the drinking water supply in emergencies.

3. For subscribers in another municipality, the regulations and tariff of the supplying municipality shall apply.

1 Water metering necessary for recording water consumption

Meters must be installed in an easily accessible, frost-proof location.

2 The water supply company may grant exemption from the installation

of water meters

a. in the case of only provisional or sporadic water draw-off,

b. if this would lead to disproportionate costs.

3 Water meters do not have to be installed in fire extinguishing

installations.

The Office for Waste, Water, Energy and Air (AWEL) establishes planning obligations for the regional and supra-regional supply concepts.

a. Canton

1. Municipalities shall draw up a General Water Supply Project b. Municipalities

for their municipal territory. They shall periodically adjust it to changed

circumstances.

2. The General Water Supply Project requires approval from the AWEL.

1 Subsidies may be granted for measures and subsidy-eligible

facilities for water supply in accordance with § 34 of the Water Management Act

of June 2, 1991 (WMA)3.

2 No subsidies shall be granted for

a. provisional installations and maintenance work,

b. administrative costs and expenses.

Projects

1. 1. 12-75

1

724.41

Ordinance on Water Supply (WsVO)

Prerequisites for

Subsidies

1 Subsidies may be granted if the measure or facility

a. serves a significant public interest (§ 34 para. 1 WWG³),

b. is needs-based, appropriate and economical,

c. complies with the principles of cantonal and regional master plans,

d. conforms to the cantonal and communal planning concepts for water supply,

e. meets the state of the art.

2 A significant public interest exists particularly for the following measures and facilities

a. Planning and initial construction of water supply facilities of interregional or regional importance,

b. initial planning of drinking water supply in emergencies,

c. facilities for which no responsible body can be found for political or financial reasons,

d. facilities where a new technology worthy of promotion is to be employed.

3 No subsidies will be granted if the project execution was started without the consent of the AWEL prior to the decision on the subsidy commitment.

4 Subsidies for the general project planning of water supply facilities according to para. 2 lit. a and b, as well as related studies, soundings, expert opinions and other investigations, can only be granted if these are carried out in agreement with the AWEL.

1 The maximum subsidy rates are determined by Article 34

paragraph 1 of the WWG3.

2 When setting subsidies for measures and facilities

according to Article 6 paragraph 2 lit. a, the following will be taken into account

a. the improvement of supply security,

b. the economic viability of the measure or facility with regard to

construction and operation,

c. the impact on the level of water fees, if these would turn out to be

disproportionately high compared to other water supplies.

3 Insofar as the subsidy, together with other cantonal and federal

contributions, exceeds 75% of the eligible costs, it may be reduced

accordingly.

2

Ordinance on Water Supply (WsVV)

724.41

1 Applications for subsidies must be submitted to the AWEL in duplicate. Submission

2 The application must be accompanied in duplicate by

a. Construction description with a technical report including calculations,

b. Cost estimate,

c. Overview plan of the entire facility,

d. Project plans,

e. Credit resolution stating the cost bearers,

f. Construction program.

of the Application

1 The prospective amount of the subsidy will be assured to the

applicant in a decision.

2 With the assurance, changes and additions to the project can be

requested.

3 The deadline for submitting the documents according to § 10 para. 1 will

be set with the assurance.

Assurance of the Subsidy

1 Determination of the Subsidy

1 Upon completion of project execution, the applicant shall submit the following documents to the AWEL

a. Construction accounting with original receipts,

b. Execution plans and execution report,

c. Compilation of any other potential state and federal contributions for the project.

2 The AWEL shall review whether the project has been executed in accordance with the plans and legally, and shall determine the amount of the subsidy.

3 It shall reduce the granted subsidy by at least 25% if conditions or requirements have been disregarded.

4 It shall refuse the subsidy if

a. the project has not been implemented professionally,

b. the documents under para. 1 have been submitted late.

---

1 OS 66, 890; for justification, see ABI 2011, 2886.

2 Entry into force: 1 January 2012.

3 LS 724.11.