Water Management Act (WWG) (WWG)
Table of Provisions (87)
Statutory Text (87 Articles)
Scope
This law regulates flood protection, water construction police, the use of waters, and water supply.
that
1 When applying this Act, particular attention must be paid to public
a. water resources being utilized judiciously and quantitatively
conserved,
b. water quality being maintained and, if possible, improved,
c. people and property being protected from harmful effects,
d. the supply of drinking water, utility water, and extinguishing water
being ensured,
e. existing recreational areas being preserved and new ones being created,
f. existing habitats for animals and plants being preserved and new ones
being created,
g. public access to water bodies being facilitated,
h. landscapes and townscapes being protected and structural alterations
being well-designed,
i. the natural water balance and water flow being protected and, if possible,
restored.
2 If public interests conflict, they must be weighed against each other.
Interests
Surface Waters
Surface waters, such as lakes, ponds, rivers, and streams, encompass the bed with its banks, forelands, and dikes, including the water standing or flowing within it, the underlying soil, and the air column. The watercourse bed consists of the land surface that is permanently or regularly covered by water.
Groundwater is water located within the Earth. It becomes groundwater
as a source within the meaning of Art. 704 CC5, as soon as it naturally
emerges to the surface.
1.10.21 114
1
724.11
Water Management Act (WMA)
Public
Waters and
Public
Water
Private
Waters
Scope of
Surface
Waters
Hydrological
Foundations
Obligations to
Tolerate
1 Groundwater and open and culverted surface waters are public, unless private ownership is proven. Groundwater discharged in drainage pipes remains public water.
2 Public waters are under the sovereignty of the state. Designated public surface waters are the property of the state.
3 No real rights can be acquired in public waters.
1 This Act shall apply to private waters insofar as this is expressly provided for or results from its meaning.
2 Private waters shall be subject to state supervision.
3 Disputes as to whether a body of water is of a public or private nature shall be decided by the civil courts.
The public surface waters are designated by the State and depicted in a plan. In accordance with public interests, they are separated as independent parcels of land. For unmarketed surface waters, the boundary is generally considered to be the line formed by the mean water level.
1 The canton shall procure the hydrological basic data required for the enforcement of this Act and the water protection legislation, to the extent that this is not done by the Confederation, and shall make them generally available in a suitable form.
2 For this purpose, it may carry out measurements and samplings on public and private waters and establish the necessary installations and facilities, in particular measuring and sampling stations.
1. Landowners must at all times permit the traversing, entering, and temporary use of their properties by the water management authorities and their agents, as well as by the flood defense force, insofar as it is necessary for the fulfillment of public duties.
2. The competent Directorate of the Government Council (Directorate) may in individual cases also order the same duty of toleration in favor of beneficiaries or applicants.
3. Unreasonable damage must be compensated.
4. The use must be notified as early as possible.
Water Management Act (WMA)
724.11
## 1 The Right of Expropriation
The right of expropriation rests with the Government Council. It may grant expropriation in individual cases to municipalities, other public law corporations, special-purpose associations, and – provided they are in the public interest – private undertakings.
2 For the rest, the provisions of cantonal expropriation law are applicable, unless federal law applies.
Dem Staat und den Gemeinden steht für Forderungen aus Grundpfand- dem Hochwasserschutz und aus Konzessionen gegenüber Grundeigentümern ein gesetzliches Pfandrecht zu.
The State and the municipalities are entitled to a statutory lien on real property for claims arising from land charges, flood protection, and concessions against property owners.
**II. Hochwasserschutz und Wasserbaupolizei**
II. Flood Protection and Hydraulic Engineering Police
1 Surface waters are to be secured in such a way that
frequent floods do not directly endanger people and
do not cause unreasonable damage to public and private property.
For flowing surface waters, flood protection must be ensured,
taking into account urban drainage.
2 Flood protection serves, with due regard for the natural water balance, in particular
Watercourse maintenance, watercourse development, retention of peak flows,
relief channels, lake regulation, torrent barriers and slope stabilization,
designation of hazard areas, infiltration of stormwater.
Aims and Means
of Flood
Protection
1 The canton shall ensure flood protection for public surface waters
of cantonal and regional importance designated by the cantonal council.
2 The municipalities shall ensure flood protection for all other
public surface waters.
3 Flood protection for private surface waters is the responsibility
of the owners. If they fail to meet their obligations or are unable to do so,
the municipality shall order substitute performance at the expense of
those liable.
4 The Directorate shall coordinate flood protection and remediation
measures based on an overall concept that considers the conditions of
the individual water bodies, their tributaries, and receiving waters.13
1.10.21 114
3
724.11
Water Management Act (WMA)
Cost Bearing
Promotion
a. Principle
b. Framework
credit for
watercourse
restorations
Competence
13. Cost Bearing for Flood Protection Measures
The bearing of costs for flood protection measures is generally determined by the responsibilities according to § 13.
The public body liable for costs may demand reasonable contributions towards its costs from another public body that derives a particular benefit from a flood protection measure. The contribution is primarily assessed based on the saved costs of its own protection measures.
Municipalities are entitled to transfer a maximum of three-fifths of their cost share to landowners and waterworks owners interested in the flood protection measure, as well as to other involved parties.
If public flood protection measures are wholly or substantially triggered by installations, facilities, precautions, or planning measures of third parties, proportional contributions to the costs may be demanded from the causative parties.
Public flood protection measures in which third parties have a particular interest may be pre-financed by the interested parties. The Directorate or the municipal water engineering authority decides on this upon request before the commencement of the water engineering police approval procedure and regulates interest-free repayment. It may delegate the implementation of subordinate measures to the interested parties.
23 The State may promote flood protection measures, culverting of waters, and measures for the renaturation of waters, independently of federal contributions, with subsidies up to 30% of the creditable costs.
For measures concerning the renaturation of waters, it may additionally grant subsidies from the Nature and Heritage Protection Fund.
The Government Council shall regulate the details.
17 The Cantonal Council approves a framework credit from which the competent Directorate may grant subsidies for watercourse naturalizations.
13 The cantonal water engineering authority is the Directorate.
The Government Council may delegate individual powers and duties to the
municipalities.
The municipal water engineering authority is the Municipal Board,
unless the municipality declares another body to be competent.
4
Water Management Act (WWG)
724.11
¹ Structural alterations to surface waters and hydraulic engineering works
within their proximity require a permit from the Directorate¹³, unless they
involve a concession-requiring use within the meaning of
⁹ ¹ The Municipal Council²² publicly displays state and communal projects for structural changes to surface waters for 30 days prior to their final approval and publicly announces the plan display. The projects must be marked out as far as representable.
2 Objections against the project may be lodged within the public display period. Legitimation is determined according to the right of appeal and complaint under the Administrative Justice Act². Municipalities affected in their legitimate interests have an independent right of objection.
3 All defects of the project may be raised with an objection. With the announcement of the public display, it may be ordered by personal notification that objections against expropriation, as well as claims for compensation, challenges to contribution demands, and requests for the execution of adaptation works must be submitted within the public display period; the additionally required project documents must also be displayed.
4 In expropriation proceedings, objections are excluded
a. against the project,
b. against the expropriation, if they should have been lodged within the public display period.
5 Objections are decided upon with the final approval. Whoever has failed to lodge an objection cannot challenge the decision.²⁰
1.10.21 114
5
724.11
Water Management Act (WMA)
b. Transfer of
Maintenance
Obligation
c. Adaptation
Obligation
Watercourse
Distance
6 For construction projects of minor importance, the objection procedure may be waived. In these cases, requests for project modification are permissible in expropriation proceedings.
7 The Government Council may regulate the details of the procedure by ordinance.
1 The permit shall be granted subject to conditions which transfer
the maintenance, in terms of type and scope, to the permit holder.
2 Instead of the maintenance obligation, the permit holder may be
charged a one-off or recurring contribution to costs if the competent
municipality carries out the maintenance itself.
1 If a flood protection measure has been ordered, the holder of a concession or permit shall carry out the necessary changes or additions to their facility at their own expense and on the instruction of the authorities. If measures are ordered that wholly or partially relieve the concession or permit holder of their maintenance obligation, the authority may demand an appropriate contribution to the costs of the public work.
2 The concession or permit holder is only entitled to compensation if their use is significantly impaired by the flood protection measures, and this cannot be remedied by adapting the facility.
3 If the concessioned or permitted building or facility gives rise to deficiencies or if a significant public interest requires it, the competent authority may demand that the necessary changes, additions, or removal be carried out at the expense of the concession or permit holder.
4 Instead of such orders, the competent authority may demand corresponding substitute levies, the amount of which shall be determined by the costs of those measures that the concession or permit holder would have to bear for adapting their facility. Disputes concerning such levies shall be decided in proceedings according to cantonal expropriation law.
1 Above-ground and underground structures and installations must maintain a distance of 5 m from open and culverted public surface waters. The application of this provision is incumbent upon the municipal building authorities.
2 In individual cases, the Directorate13 may increase this dimension if hydraulic engineering requirements necessitate it, or grant an exception for falling below the minimum distance if special circumstances justify it.
3 Exception permits may not contravene the spirit and purpose of para. 1, nor otherwise violate any public interests, unless the fulfillment of a statutory obligation of the public body would be rendered impossible or excessively difficult.
Water Management Act (WMA)
724.11
1 Hazard areas are those areas in which frequent or severely damaging floods are to be expected and where flood safety within the meaning of § 12 cannot be achieved in the short term with proportionate means.
2 The Directorate13 shall issue a plan concerning the hazard areas after hearing the municipalities.
3 Hazard areas shall be taken into account in planning law determinations.
4 The local building authorities shall order the measures necessary in individual cases within the building law procedure, which require approval by the Directorate13.
§§ 23 and 24.21
III. Water Supply
Purpose
The purpose of public water supply is the provision and delivery of drinking water of impeccable quality, under sufficient pressure and in adequate quantities for drinking, domestic, and fire-fighting purposes.
Water for drinking purposes must be used economically. It is generally to be supplied only via metering devices.
1 The municipalities shall ensure the water supply within the scope of their municipal area. They shall cover extraordinary needs, insofar as this is reasonable for them.
2 They shall expand the water supply in accordance with the general water supply project and the development plan. The general water supply project requires approval by the Directorate13.
3 They shall supervise private water supply undertakings.
4 They shall take the necessary measures for drinking water supply in emergencies.
5 They shall issue regulations concerning the water supply.
1.10.21 114
7
724.11 Water Management Act (WMA)
Private Water Supply Undertakings
Contributions and Fees
Cost Participation of Public Authorities
Tasks of the State
Water Scarcity
1 The duties of the municipalities in accordance with § 27 paras. 1 and 2
can be carried out by private water supply companies.
2 Private water supply companies can be publicly declared by the
Government Council. Publicly declared water supply companies
act sovereignly. The municipalities shall be heard before the public
declaration.
1 Property owners whose properties experience a special benefit from the construction of public water pipelines shall pay development contributions to the municipalities or the publicly declared water supply companies.
2 For the use of public water supply facilities, municipalities or publicly declared water supply companies shall levy cost-covering connection and usage fees or usage fees alone.
3 Instead of development contributions, only connection and usage fees or usage fees alone may also be levied.
4 In all other respects, the provisions of the Introductory Act to the Water Protection Act concerning contributions and fees shall apply.
16 The municipality bearing the costs may demand reasonable contributions towards its costs from another municipality that particularly benefits from water supply facilities of regional or supra-regional importance.
The State shall have the following duties
a. Overall supervision of water supply and coordination thereof,
b. Procurement of basic data, planning and implementation of inves-
tigations concerning water procurement,
c. Advising municipalities and water supply companies,
d. Promotion of water supply facilities of regional and inter-
regional importance,
e. Issuance of guidelines regarding the construction and operation of water
supply facilities and regarding drinking water supply in emer-
gencies.
In the event of an impending water shortage, the Directorate13 may
order the necessary measures concerning the distribution of water from the water supply facilities,
including the regulation of costs.
8
Water Management Act (WMA)
724.11
The Directorate 13 may authorize water supply companies to carry out excavations and soundings for groundwater on private land, as well as observations and investigations that are in the public interest, or may carry these out itself.
Connection Obligation
The owners of properties within the catchment area of public or private water supply systems are obliged to procure water from these systems, unless they possess an alternative, unexceptionable water supply.
17 1 If a significant public interest exists, the competent directorate may
**a. promote measures taken by municipalities and third parties in favor of water supply,**
**b. subsidize water supply facilities up to 75% of the eligible costs.**
**2 In particular, low-interest loans, risk guarantees, or sureties may also be granted.**
**3 The Government Council shall regulate the details.**
18
IV. Use of Waters in General
1. Concession and Permit
Abs. 1 is connected.
2 The permit can be limited in time. It will be refused if
flood protection is impaired or another public
interest would be significantly violated.
3 Permits that result in major changes to surface waters
may be combined with conditions for the expansion of the discharge
profile. Other flood protection
measures according to § 12 or proportional costs may also be imposed.
4 State projects for structural changes to surface
waters are determined by the Government Council. The Directorate¹³ is
responsible if the credit approval falls within its competence. It
also determines projects of municipalities. With the project determination,
the right of expropriation is granted.⁹
Permit
a. General
1 Regarding questions concerning the use of public waters that are fundamental to the later eligibility of a project for approval, preliminary decisions can be obtained. The application must be accompanied by the documents necessary for assessing the questions posed.
1.10.21 114
9
724.11
Water Management Act (WMA)
Procedure
a. Preliminary review
and public display of plans
b. Simplified
procedure
c. Objection
d. Local
hearing
e. Decision
on
objections
Granting of
concessions
and
permits
a. Public
interests
2 The preliminary decision is binding, valid, or subject to public-law appeal in the same way as water law concessions and permits, with respect to the questions addressed. The validity period of a preliminary decision is two years.
1. The application, along with the necessary documentation for the assessment of the project, must be submitted to the Directorate13 for preliminary review.
2. The application will be rejected if the permit would obviously impair public interests in an unacceptable manner.
3. Following the preliminary review, the Municipal Council22, upon instruction from the Directorate13, publicly exhibits the application for 30 days and makes the plan exhibition publicly known.
4. Where possible, the applicant shall mark the project during the period of the plan exhibition.
5. If the project undergoes a substantial change due to the approval of objections, the exhibition must be repeated.
Public display may be dispensed with if
a project is of minor importance or obviously does not affect the interests of third parties.
13 Within the objection period, anyone may raise an objection on account of the violation of public or private interests.
1 The Directorate13 conducts a local hearing for the amicable settlement of objections. An objection is settled with the written consent of the parties involved.
2 Unexcused non-appearance is considered a withdrawal of the application or the objection. These legal consequences must be announced in the summons.
13 1. The authority decides on objections that have remained contentious together with the decision concerning the concession or permit.
**2. Insofar as the objector is not entitled to appeal, the decision is final.**
1 Concessions and permits for the use of public waters may only be granted if they neither significantly impair public interests nor significantly diminish the rights of other water users.
2 The supply of drinking water to the population has priority.
Water Management Act (WMA)
724.11
3 Among several applications, priority shall be given to the project that better safeguards public interests.
b. Ancillary provisions
Concessions and permits are linked to the necessary ancillary provisions and are generally limited in time.
The granting of concessions and permits can be made contingent upon the provision of adequate security. The security serves in particular to cover expert assessment costs, damages that the construction, existence, or operation of a facility could cause, as well as the costs of measures required upon the decommissioning of the plant.
1. Public law restrictions on ownership that are imposed on a landowner in connection with the granting of a concession or permit can be noted in the land register.
2. If the concession or permit is subjectively real-connected with the ownership of a specific plot of land, it can be noted in the land register together with its ancillary provisions.
1 **Concessions and permit-requiring uses of public waters are subject to fees.**
2 The usage fee is determined based on the granted special advantages, namely the economic benefit, the type and duration of the concession or permit, the disadvantages arising for the public, the purpose of use, the quantity of water claimed, and – when utilizing the waters – the value of adjacent properties. Fees for hydropower use are determined according to § 66.
3 Usage fees can be levied once or periodically.
4 They should be regularly adjusted for inflation.
5 For uses according to §§ 65 to 74, one-time granting fees equal to the anticipated usage fee are levied. In the event of a modification or expansion of the facility during the concession period, the one-time granting fee is only payable for the increase in use.
6 In the presence of significant public interests, fees can be reduced or entirely waived.
7 Fees become time-barred within five years from their due date.
1.10.21 114
11
724.11
Water Management Act (WMA)
Unauthorized
Use
Transfer
Content of
Concession or
Permit
a. Mandatory
b. Optional
Termination
a. Expiration
b. Forfeiture
c. Repurchase
If someone undertakes a use without a concession or permit, the regular fee for that period can be increased up to threefold, even if the use is subsequently conceded or permitted.
1 The transfer of concessions and permits
may be made subject to approval.
2 The Land Registry Office notifies the Directorate13 of changes of ownership
concerning
a. properties where the subjective-real connection
of a concession or permit is noted,
b. concessions that are recorded in the land register as independent and permanent rights.
The concession or permit determines the scope, nature, and duration of the right of use, as well as the conditions and obligations upon its termination. The Government Council may issue further regulations concerning its mandatory content.
The concession or permit may contain further provisions, in particular regarding security, escheat, right of repurchase, and revocation.
The concession or permit expires at the end of its duration or through written waiver by the concession or permit holder.
A concession or a permit may be declared forfeited,
a. if the holder does not exercise their rights within a reasonable period,
b. if the holder interrupts operations for two years and does not resume them within a reasonable period,
c. if the holder violates important duties despite a warning,
d. after the unused expiry of the deadline for construction completion, provided that the delay can be attributed to the holder.
The State is entitled to repurchase the granted right, including the installations, in accordance with the concession provisions during the concession period. The concession authority asserts the right of repurchase at least two years in advance.
12
Water Management Act (WMA)
724.11
1 Upon expiry of the concession period, the State is entitled to the reversion,
i.e., to take possession of the installations and facilities free of charge
in accordance with the concession provisions. The concession authority
shall claim the reversion at least two years in advance.
2 The concessionaire is obliged to maintain installations and facilities
subject to a right of reversion in an operational condition.
1 Where the installations and facilities are no longer used for the works after the concession or permit has expired or been revoked, and after forfeiture, the owner or proprietor of the operational plot of land shall take the prescribed measures necessary due to the cessation of the works and the restoration of a natural watercourse condition.
2 The duration of the security and maintenance obligation shall be determined by the nature of the granted right.
Fire department
and the
Public and private surface waters may be used by the organs of the fire department and civil defense for rescue operations and for exercises to extract water without compensation. In doing so, the minimum amount of water necessary for animal and plant life must remain in the body of water.
1. If a beneficiary has lost all interest in a hereditary right (ehehaftes Recht), the Directorate13 may order its revocation.
2. The loss of interest is presumed if the right has not been exercised for ten years.
3. If the beneficiary's interest is of minor importance compared to public interests, the hereditary right may be revoked through expropriation.
4. If a facility created under a hereditary right is altered in such a way that it results in a significant increase in use, a new concession will be granted, and the hereditary right will expire.
2. Limitations on Use
Nutzungsrechte können zur Wahrung wichtiger öffentlicher Nachträgliche
Interessen eingeschränkt werden.
Einschränkung
von Nutzungs-
rechten
a. Im öffent-
lichen Interesse
1.10.21 114
13
724.11
Wasserwirtschaftsgesetz (WWG)
b. Im Interesse
anderer
Berechtigter
c. Arbeiten im
öffentlichen
Interesse
Einleitung von
Abwasser
Fischerei
---
Rights of use may be restricted to protect important public subsequent interests.
Restriction
of Rights
of Use
a. In the Public
Interest
1.10.21 114
13
724.11
Water Management Act (WMA)
b. In the Interest
of Other
Entitled Persons
c. Works in the
Public
Interest
Discharge of
Wastewater
Fishing
1 A concessionaire may be restricted in the exercise of their right due to significant needs of another entitled person, if this is overall in the public interest.
2 14
The owner shall tolerate temporary restrictions on use without compensation, provided they become necessary due to flood protection measures or other works carried out in the public interest on public waters.
The concessionaire tolerates the discharge of wastewater into the
inlet and outlet channels of its facilities, if a discharge permit
exists for this.
The right of fishery in hydroelectric power plants and reservoirs belongs to the state, unless private rights can be proven. The owners of the canals and reservoirs tolerate the exercise of fishing by the lessees. They shall take, according to the instructions of the Directorate, the necessary precautions for the protection and free passage of fish.
21
Competence
Water charge
V. Utilization of Waters in Detail
1. Hydropower Utilization
The Government Council decides on concessions for installations with a gross output exceeding 300 kW, the Directorate13 on the other installations.
1 For the use of hydropower, an annual water fee (Wasserzins) at the maximum rate under federal law shall be levied.
2 For installations with a gross output of less than 1000 kW, the Government Council may progressively reduce the water fee.
3 In the event of changes to the water body or water balance that lead to a significant change in gross output, the water fee shall be recalculated.
14
Water Management Act (WWG)
724.11
### Calculation of Gross Output
Gross output is calculated in accordance with federal legislation on the utilization of water bodies and hydropower.
Rights for which no interest has been paid since 1816 or for which the interest has since been redeemed, remain interest-free.
Water rights
The concessionaire is obliged to transport the screenings at their own expense to a treatment or incineration plant or to a suitable disposal site.
2. Groundwater abstractions and interventions in the aquifer
13 1 Groundwater extractions, as well as sustainable interventions and concession-
changes within the aquifer, require a concession from the Directorate.
2 When granting concessions, the natural water balance must be taken into account.
3 Temporary structural changes in the aquifer, as well as investigations, particularly soundings and pump tests, that are expected to have only minor effects on usable water resources, require a permit from the Directorate.
Permitting Authorities
1 In the event of structural alterations in the aquifer, sufficient groundwater flow must be ensured. If this is not possible or not expedient, the originator who impairs the flow must pay a compensatory charge. The amount of the charge is based on the costs that the originator would have to bear for the restoration of the flow due to a reasonable compensatory project.
2 Disputes concerning such charges shall be decided in proceedings in accordance with cantonal expropriation law.
1 The state may construct facilities for enriching usable groundwater if it is insufficient in terms of quantity or quality. The construction of such facilities by third parties requires a state permit.
2 For the use of enriched groundwater resources, the fees under § 47 may be doubled. Uses for water supply are exempt from this.
1.10.21 114
15
724.11 Water Management Act (WMA)
3. Other Uses
Concession and
Permit Requirement
Water Scarcity
The use of water for heating or cooling purposes, for water supply, for irrigation, for feeding ponds, and other uses requires, depending on the type, a concession or a permit from the Directorate¹³.
¹ In case of acute water shortage, the Directorate¹³ may authorize municipalities to temporarily approve water extractions for irrigation purposes for a limited period.
² It orders the necessary conditions for the benefit of aquatic life.
4. Utilization of Surface Waters
Concept and Scope
Competence
Material Extraction
Land Installations and Public Ground
The following are considered uses of surface waters: their spatial utilization. This includes
a. Buildings and facilities such as buildings, boat moorings and associated facilities, jetties, rafts, bridges, pipelines,
b. Reclamation of water areas for land recovery (land reclamation),
c. Material extractions.
¹ The Directorate¹³ decides on the concession or the permit for the utilization of surface waters.
² If surface waters are utilized in connection with road construction projects or pipelines, such as for electricity, gas, water, and wastewater, §§ 38 to 41 are not applicable.
1. The right to extract sand, gravel, and stones from public surface waters belongs to the State.
2. New extractions are only permissible if the sediment balance allows.
¹ New land reclamations generally remain the property of the State.
² The waters claimed by structures and installations remain public domain.
16
Water Management Act (WMA)
VI. Legal Protection19
19 1 Orders issued in application of this Act may be challenged by appeal before the Building Appeals Court.
**2 Excluded are acts of the Government Council.**
19 1. Standing to Appeal and Complain is determined by the Administrative Justice Act of 24 May 1959.
2. Natural, homeland, environmental, and fishing organizations, as well as other associations whose statutes have for at least ten years provided for their engagement throughout the canton with water protection and water use, are also entitled to appeal and complain against measures within the meaning of § 12 and permits granted in application of § 18.
3. The competent Directorate may file a complaint against appeal decisions that wholly or partially revoke an order by a cantonal authority, in order to protect public interests.
VII.20 Penal Provisions
1 Anyone who violates the duty to obtain a concession or permit or ancillary provisions of concessions and permits shall be punished with a fine of up to CHF 50,000, and in cases of intent to profit, with an unlimited fine.
2 If the offender acts negligently, the penalty shall be a fine of up to CHF 5,000.
VIII.20 Final and Transitional Provisions
The law of December 1901 is repealed.
a. The Planning and Building Act of September 7, 1975: . . . 8
b. The Administrative Justice Act of May 24, 1959: . . . 8
c. The Introductory Act to the Water Protection Act of December 8,
1974: . . . 8
d. The Introductory Act to the Civil Code (Introductory Act to the CC) of
April 2, 1911: . . . 8
1.10.21 114
17
724.11
previous
law
Amendments
previous
law
724.11 Water Management Act (WMA)
Transitional
provisions
a. Ordinances
b. Applicability
to concessions
or permits
not yet granted
c. Applicability
to concessions
or permits
already granted
Cantonal ordinances issued under previous law remain in force, as long as they do not contradict the directly applicable provisions of this Act, until they are replaced or repealed by new ordinances.
With the entry into force of this law, all projects requiring a concession or permit, for which the concession or permit authority has not yet decided, are to be assessed according to the new provisions.
This Act applies to existing concessions or permits, to the extent that it does not infringe upon vested rights.
Entry into Force
IX.20 Entry into Force
This Act is subject to a popular vote. The Govern-
ment Council determines the date of its entry into force7.
Transitional Provision for the Amendment of 28 October 2013
(OS 69, 262)
The competence for assessing appeals pending at the time of entry
into force is determined by previous law.
Previous competences also apply if the appeal period began to run
before the entry into force of the new law, but only ends thereafter. Otherwise, the new law applies to
pending proceedings.
1 OS 51, 707.
2 LS 175.2.
3 LS 711.1.
4 LS 781.
5 SR 210.
6 SR 711.
7 In force since 1 January 1993 (OS 52, 255).
18
Water Management Act (WWG)
724.11
8 For text, see OS 51, 719.
9 Inserted by the Administrative Justice Act of 8 June 1997 (OS 54,
268). In force since 1 January 1998 (OS 54, 290).
10 Version in accordance with the Administrative Justice Act of 8 June 1997 (OS 54, 268).
In force since 1 January 1998 (OS 54, 290).
11 Version in accordance with the Act on Adaptation to the Amended General Part
of the Criminal Code and to the New Juvenile Criminal Act of 19 June 2006
(OS 61, 391; ABI 2005, 1483). In force since 1 January 2007.
12 Inserted by the Act on Adaptation of Cantonal Administrative Procedure
Law of 22 March 2010 (OS 65, 390; ABI 2009, 801). In force since 1 July
2010.
13 Version in accordance with the Act on Adaptation of Cantonal Administrative Procedure
Law of 22 March 2010 (OS 65, 390; ABI 2009, 801). In force since 1 July
2010.
14 Repealed by the Act on Adaptation of Cantonal Administrative Procedure
Law of 22 March 2010 (OS 65, 390; ABI 2009, 801). In force since 1 July
2010.
15 Version in accordance with the Act on the Subordination of Tax Appeal Commissions and
Building Appeal Commissions to the Administrative Court of 13 Septem-
ber 2010 (OS 65, 953; ABI 2010, 266). In force since 1 January 2011.
16 Inserted by the Fiscal Equalisation Act of 12 July 2010 (OS 66, 747; ABI
2009, 172). In force since 1 January 2012.
17 Version in accordance with the Fiscal Equalisation Act of 12 July 2010 (OS 66, 747; ABI
2009, 172). In force since 1 January 2012.
18 Repealed by the Fiscal Equalisation Act of 12 July 2010 (OS 66, 747; ABI
2009, 172). In force since 1 January 2012.
19 Inserted by the Planning and Building Act of 28 October 2013 (OS 69, 262;
ABI 2011, 1119). In force since 1 July 2014.
20 Version in accordance with the Planning and Building Act of 28 October 2013 (OS 69, 262;
ABI 2011, 1119). In force since 1 July 2014.
21 Repealed by the Planning and Building Act of 28 October 2013 (OS 69,
262; ABI 2011, 1119). In force since 1 July 2014.
22 Version in accordance with the Municipal Act of 20 April 2015 (OS 72, 183; ABI 2013-
04-19). In force since 1 January 2018.
23 Version in accordance with the Act on the Financing of Measures for Nature and
Heritage Protection and for Recreation Areas of 14 December 2020 (OS 76, 331;
ABI 2019-11-29). In force since 1 October 2021.
1.10.21 114