Legislator Case Law & Legislation
700.6 BVV CH-ZH

Art. 9: Building Procedure Ordinance (BVV)

Open official source Full Act (35 Articles) Machine-readable Markdown (.md)

Art. 9

1 The body responsible for coordination is

a. as a rule, the local building authority,

b. for projects requiring an environmental impact assessment, the authority responsible in the relevant procedure,

c.24 for projects not requiring a permit from the local building authority, the cantonal lead agency.

2 If a project must be assessed by multiple cantonal bodies, the cantonal lead agency ensures the coordination of the cantonal procedures and decisions.29

← Art. 8 Building Procedure Ordinance (BPO) Art. 10 →

Need to analyze how this provision applies to your matter?

Cross-reference this statute against case law, commentaries, and related legislative provisions inside Legislator AI.

Open in Legislator →

Court Decisions Applying This Provision (2)

BRGE.IV.Nr.0038.201 · zh (§ 9 Abs. 1 lit. a BVV)
Facade Alteration Permit in Protected Area: Lack of Material Coordination
Cited in the reasoning as designating the local building authority as the coordinating authority in the standard case.
VB.2014.00424 · zh (Art. 9 Abs. I BVV)
Appeal Dismissed Regarding Terrain Alteration Permit Denial in Recreational Zone
Cited as part of the legal norms applied in the context of the confirmed procedure.