Art. 8: Building Procedure Ordinance (BVV)
Art. 8
1 The body responsible for coordination shall ensure, for projects that require review by multiple bodies, adequate formal and substantive coordination of the assessments, consistent decisions, and uniform instructions on the right of appeal.29
2 Assessments listed in the Annex that are not material to the admissibility of the project itself are not subject to the coordination obligation. Such ancillary permits may be reserved for supplementary procedures.24
Court Decisions Applying This Provision (4)
BRGE.IV.Nr.0038.201 · zh (§ 8 Abs. 1 BVV)
Facade Alteration Permit in Protected Area: Lack of Material Coordination
Cited in the reasoning as largely repeating the principles of Art. 25a RPG concerning the coordinating authority.
BRGE.III.Nrn.0060.0 · zh (§ 8 Abs. 1 BVV)
Residential Development Permit Appeals Dismissed Over Preemption, Infrastructure, and Design Issues
Cited regarding the formal and material coordination of administrative acts required for a building permit.
BRGE.III.Nrn.0060.0 · zh (§ 8 Abs. 2 BVV)
Residential Development Permit Appeals Dismissed Over Preemption, Infrastructure, and Design Issues
Cited regarding assessments that are not subject to the coordination obligation.
VB.2021.00112 · zh (Art. 8 Abs. I BVV)
Flood Control Tunnel Easement Dispute
This provision is listed under 'Rechtsnormen' but its specific application in the dispositive is not detailed.