General Building Ordinance (GBO) (ABV)
Table of Provisions (58)
Statutory Text (58 Articles)
1 Buildings and facilities within the meaning of the Planning and Building Act are
a. Buildings that are embedded in the ground or, with a certain local
connection, standing thereon, are, by their extent, capable of
influencing the surroundings through air and light displacement,
superimposition on an open ground area, or through other effects;
b. all outwardly visible changes to land or its use that are significant
under planning and building law.
2 Buildings and facilities notably include
Buildings,
Walls and fences,
Advertisements,
Outdoor antennas,
Installations for the use of solar energy,
Sports, play, and recreational facilities,
Swimming pools,
Camping sites,
Independent parking spaces, workshops, and storage areas,
Installations for material extraction and deposition,
Traffic and other transport facilities,
Filling stations.
14, 16 Buildings** are stationary structures that, for the protection of people, animals, or things, possess a fixed roof and generally further enclosures.
13, 16 1 Small structures are detached buildings with a
footprint of no more than 50 m², whose total height does not exceed 4.0 m,
or 5.0 m for sloped roofs and attached structures, and which
contain only ancillary usable floor area.
1. 1. 25-127
700.2 General Building Ordinance (GBO)
2 Attached structures are buildings connected to another building
with a footprint of no more than 50 m², whose total
height does not exceed 4.0 m, or 5.0 m for sloped roofs, and which
contain only ancillary usable floor area.
13, 16 Underground structures are buildings which, with the exception
of the access and the railings and balustrades, lie entirely
below the relevant or the lowered ground level.
13, 16 Subterranean structures are buildings that do not extend above the
relevant or lowered ground level by more than 0.5 m at any point in the façade line. In areas of access, measurements are taken from the relevant ground level.
Facilities are secondary installations to buildings and structures, such as playgrounds, rest areas, noise barriers, vehicle parking spaces, and internal access roads.
8 Equipment refers to technical installations of buildings and facilities that serve their use or safety.
14, 16 1 The naturally grown terrain is considered the determining terrain.** If this can no longer be ascertained due to previous excavations and embankments, the natural terrain of the surrounding area must be taken as a basis.
**2 For planning or development-related reasons, the determining terrain may be divergently stipulated in a planning or building permit procedure.**
13, 16 1. The Building Line
The building line is the envelope surface, formed by the vertical lines through the outermost points of the building structure above the relevant ground level.
2. Protruding and insignificantly recessed building parts are not taken into account.
13, 16 The façade line is the intersection of the façade plane and the determining ground level.
13, 16 The projected building line is the projection of the building
line onto the plane of the official survey.
13, 16 1 Protruding building parts may project a maximum of 2 m beyond
the facade line and may not, with the exception of roof projections,
exceed half of the respective facade section.
2
General Building Ordinance (GBO)
700.2
2 For the permissible proportion of the respective facade section,
multiple protruding building parts on different storeys are added together.
13, 16 1 Recessed building parts are set back from the main facade.
Recessed Building Parts
2 Insignificantly recessed building parts are set back by a maximum of 1.5 m from the facade line and do not exceed one-fifth of the corresponding facade section.
13, 16 Building Zone. The building zone encompasses the developable area which is determined in a land use plan, deviating from setback regulations and building lines.
II. Area Development (§ 69 PBG)13
14, 16 For the measurement of the site area, the measurement method provisions regarding the developable plot area for utilization figures apply mutatis mutandis.
III. The Utilization Figures (§§ 254 et seq. PBG)
1. The Building Exploitation Ratio (§ 255 para. 4 PBG)
14, 16 Rooftop, Attic, and Basement Floors that, within the meaning of Article 276
para. 2 PBG2, replace a full storey, shall be considered full storeys for the calculation of the
floor area ratio. Rooftop, Attic, and Basement Floors
a.
8, 16 The following are not included in the calculation
a. multi-purpose community rooms serving recreational purposes in multi-family homes and single-family housing estates, provided they reach at least 20 m² and, if larger, do not exceed 2% of the computable floor area,
b. ancillary rooms serving workplace design up to 2% of the computable floor area,
c.14 glazed balconies, verandas and loggias, as well as winter gardens and vestibules without heating installations, provided they serve energy saving purposes, up to 20% of the sum of all computable floor areas.
1. 1. 25-127
3
700.2
General Building Ordinance (ABV)
2. The Building Coverage Ratio (§ 256 PBG)14
Non-computable ancillary rooms serving recreational purposes
Ancillary rooms serving workplace design
Building components serving energy saving purposes
14, 16 For glazed balconies, verandas and loggias, as well as winter gardens and windbreaks without heating installations, to the extent that they serve energy saving purposes, the building density figure may be increased by up to 20% of the zone-specific base figure.
3. The Green Space Index (Art. 257 PBG)20
Deductible Green Spaces
Open Space Ratio (OSR) = usable open space (UOS) in %
determining land area (DLA)
The Building Coverage Ratio
Calculation of the Building Coverage Ratio (BCR)
Building Coverage Ratio (BCR) = built-up area in %
determining land area (DLA)
15, 19 1 Natural ground areas are surfaces that have a natural soil structure and natural infiltration properties.
2 Planted ground areas are surfaces with a sufficient humus layer that enables permanent vegetation and does not regularly dry out.
4. The volume index (§ 258 PBG)19
Allocation of the
volume index
GF = Ground Area
BM = Building Mass
above-ground building mass
relevant Ground Area (GF)
Building Volume Ratio =
BVR =
Length L. Width W. Height H
GF = Ground Area
Weathering Zone
h/2
h/2 = Weathering Zone
Weathering Zone is not
to be included/counted
h/2
Street
The Distances
Terms
G = Basic Setback
ALSC = Additional Length Surcharge
AHSC = Additional Height Surcharge
g = required boundary setback
BL = Basic Length according to
Building Code
AL = Additional Length
AH = Additional Height
BH = Building Height
14, 16 1 The municipalities may divide the volume ratio and regulate it separately for
a. main buildings,
b. minor buildings and annexes.
**2 For glazed balconies, verandas and loggias as well as conservatories and draught lobbies without heating installations, insofar as they serve to save energy, an additional volume ratio applies. It amounts to 20% of the zone-appropriate basic ratio.**
§§ 14-16.6
Attribution
IV. Special Use Orders (§ 49a para. 3 PBG)8
8 Spaces directly serving the special use, including associated access areas and sanitary facilities, along with internal partitions, are attributed to it.
6
4
General Building Ordinance (ABV)
700.2
8 1 Boundaries Immediately Mixed Spaces for Special Use
adjoining other spaces or common ancillary rooms and access Buildings
facilities, their area extends to half the thickness of the
partition wall.
2 Common ancillary rooms and access areas are allocated according
to the actual ratio between special and other use.
V. Definition and Measurement Method of the Municipal Boundary Setback
(§ 260 PBG)
1 The boundary clearance consists of the basic setback and
A. Definition
the additional height surcharge as well as the additional length surcharge according to the Building and Zoning Regulations.8
2 If the conditions for the additional length and additional height surcharge apply concurrently, the surcharge for the additional length shall first be added to the basic setback, and thereafter the surcharge for the additional height.
Permissible Building Height for Standard Development
The Setbacks
Boundary Setback for Stepped Facades
(Illustration limited to one facade)
Relevant Building Length
GL
ML 1
G
MLZ I
GL
ML 1
GL
ML 2
G
TG
MLZ 1
MLZ 2
G
GL
ML 1
!
> 2G
G
MLZ1G
§§ 21-26 ABV
The Setbacks
Boundary Setback Diagram of a Complex Building Volume
(Superimposition of all facade setbacks)
Assumptions
G = 6m on all sides
GL = 15m
MLZ = 1/3 ML, max. MLZ = 7m
§§ 21-26 ABV
The Setbacks
Boundary Setback of a Rounded Building Volume
§§ 21-26 ABV
Boundary Setback due to
Additional Height exceeding 12m
Boundary Setback due to
Exceeding the
Permissible Building Height
§270 Para. 2 PBG
16 1 The basic setback is the smallest required boundary setback without
B. Basic
surcharges for additional lengths and heights; it is measured
setback
perpendicular to the projected façade line and radially over the
building corners.14
2 If, according to the building and zoning regulations, there are two
different basic setbacks, the smaller one must be applied radially
around the building corners.
1 The supplementary charge for extra length corresponds to a specific portion C. Supplementary charge
of the facade length qualified as extra length; the supplementary charge may be limited to for extra length
a maximum.
2 The supplementary charge for extra length is measured at right angles to the facades;
it is not applied beyond the building corners.
I. In General
1. In the case of facades with horizontal segmentation, the length relevant for the extra-length surcharge is determined separately for each facade section.
2. Recessed facade sections are measured through projecting parts up to the outermost visible building edge, in or in front of the facade plane; projecting parts are only considered independent facade sections if their mutual distance is at least the sum of two basic distances.
3. For angled or rounded facades, the length relevant for the extra-length surcharge is determined in the same way as for facades with horizontal segmentation; the angling or rounding is to be regarded as a horizontally segmented facade with infinitely small offsets.
II. In case of a special facade course
700.2
General Building Ordinance (GBO)
III. For small buildings and annexes
D. Extra-height surcharge
14, 16
Small buildings and annexes are not taken into account when calculating the additional length surcharge, unless the building and zoning regulations stipulate otherwise.
The extra height surcharge within the meaning of § 260 para. 2 PBG2 is measured at right angles to the facades and radially over the building corners.
Concept
VI. Facade length (§ 292 PBG and §§ 6 c and 6 d)14
14, 16 1 The facade length corresponds to the facade section
which is decisive for calculating the permissible width of projecting and insignificantly
recessed building parts, as well as roof superstructures.
2 Above-ground projections extending over more than one storey are added to the facade length
if they have a closed height of more than 1.3 m in the direction of the relevant facade.
3 The Building and Zoning Ordinance may stipulate that the facade lengths of adjacent
main buildings relevant for the additional length allowance are added together if the building
distance falls below a certain measure.9
Definition
VII. Building Length and Building Width (§ 49 PBG)8
> 1.30
Relevant
Facade Length
1.30
1.30
Relevant
Facade Length
Building Length / Building Width
Relevant Building Width
Relevant Building Length
Relevant Building Length
Relevant
Smallest Enclosing Rectangle
Relevant
Building Width
14, 16 1 The building length is the longer side of the rectangle of smallest
area that encloses the projected facade line.
2 The building width is the shorter side of the rectangle of smallest
area that encloses the projected facade line.
3 Extensions are not taken into account, unless the Building and
Zoning Ordinance stipulates otherwise.
6
General Building Ordinance (ABO)
VIII. The Basement (§ 275 para. 3 PBG)14
700.2
Building Height with Influence
**from Boundary and Building Line Setbacks**
**§§ 270 and 278 et seq. PBG**
Building Line Influence Area according to § 278 para 2
Building Line Influence Area
max. 15.00
e.g. 9.00
max. 15.00
§ 279 para 2
14, 16 The average extent to which basements may project beyond the measurement line of the facade is calculated from the sum of the facade areas above the facade line, divided by the length of the projected facade line.
IX. Special Terms
1. **Significant Impairment by Shadowing within the Meaning of § 284 PBG:**
a. For developed properties: shadowing of inhabited neighboring buildings or those located in residential zones lasting longer than three hours on average winter days, typically measured at their base point.
b. For undeveloped properties in residential zones: shadowing of developable areas of the neighboring property lasting longer than three hours on average winter days, provided that this renders impossible or significantly hinders a development consistent with local conditions and the building and zoning regulations.
2. However, there is no significant impairment by shadowing if it is demonstrated with a cubic comparison project that complies with the regulations in all respects, that a development consistent with the building and zoning regulations would not result in less shadowing of the neighboring property.
3. If, in residential zones, the development on the neighboring property is considerably outdated or disproportionate to the objectives of the building and zoning regulations, the rules for both developed and undeveloped properties shall apply simultaneously.
1 Open in the sense of § 286 PBG
2 An overbuilding is considered open if its buildings stand freely on all sides.
Open and
closed
2 An overbuilding is considered closed if the buildings are built together on one side or multiple sides, or are placed or permitted or required to be placed on a boundary.
overbuilding
8 Housing Types Comparable to Single-Family Houses
a. are not located in a common stairwell with other dwellings and have direct access to the outside,
b. are furthermore situated in a building part that outwardly resembles a single-family house.
1. 1. 25-127
7
700.2
§§ 32a and 33.6
15
General Building Ordinance (GBO)
X. Entry into Force
Coming into Effect
This Ordinance shall enter into force³ after approval by the
Cantonal Council and publication in the Official Gazette on a date
to be determined by the Government Council.
Transitional Provisions for the Amendment of 11 May 2016
(OS 72, 60)
Until the Building and Zoning Ordinance is adapted to the amendment
of 14 September 2015 of the Planning and Building Act, the
following provisions, in the version valid before the entry into force of the
amendment of 11 May 2016, shall remain applicable: §§ 2, 2 a, 2 b, 2 c, 5, 6, 6 a,
6 b, 6 c, 6 d, 7, 8, 9, 10, 11, 12, 13, 22, 25, 27, 28, 29.
8
1 OS 46, 770 and GS V, 91.
2 LS 700.1.
3 In force since 1 July 1978.
4 Approved by the Cantonal Council on 29 August 1977.
5 Cf. Art. III, paras. 3 and 4 of the amendment to the Act of 1 September 1991
(OS 51, 817). In force since 1 February 1992 (OS 52, 48).
6 Repealed by Government Council Decision of 25 September 1991 (OS 52, 44). In force since
1 February 1992 (OS 52, 48).
7 Inserted by Government Council Decision of 25 September 1991 (OS 52, 44). In force since
1 February 1992 (OS 52, 48).
8 Version according to Government Council Decision of 25 September 1991 (OS 52, 44). In force since
1 February 1992 (OS 52, 48).
9 Inserted by Government Council Decision of 5 August 1992 (OS 52, 216). In force since 1 Octo-
ber 1992 (OS 52, 240).
10 Version according to Government Council Decision of 5 August 1992 (OS 52, 216). In force since 1 Octo-
ber 1992 (OS 52, 240).
General Building Ordinance (ABV)
700.2
11 Inserted by Government Council Decision of 14 May 2003 (OS 58, 199). In force since 1 January
2004 (OS 58, 250).
12 Inserted by Government Council Decision of 10 September 2008 (OS 64, 127; ABI 2008, 1535).
In force since 1 July 2009.
13 Inserted by Government Council Decision of 11 May 2016 (OS 72, 60; ABI 2016-05-27). In force
since 1 March 2017.
14 Version according to Government Council Decision of 11 May 2016 (OS 72, 60; ABI 2016-05-27). In force
since 1 March 2017.
15 Repealed by Government Council Decision of 11 May 2016 (OS 72, 60; ABI 2016-05-27). In
force since 1 March 2017.
16 Transitional provisions for the amendment of 11 May 2016. In force since 1 March
2017 (see Appendix).
17 Version according to correction of 24 April 2019 (OS 74, 188). In force since
24 April 2019.
18 Version according to Government Council Decision of 18 March 2020 (OS 76, 263; ABI 2020-03-27). In
force since 1 August 2021.
19 Inserted by Government Council Decision of 14 September 2022 (OS 79, 427; ABI 2022-09-30).
In force since 1 December 2024.
20 Version according to Government Council Decision of 14 September 2022 (OS 79, 427; ABI 2022-09-30).
In force since 1 December 2024.
1. 1. 25-127
9
700.2
Appendix 114
General Building Ordinance (ABV)
to the General Building Ordinance (explanatory sketches for
the measurement and calculation methods according to the Planning and
Building Act [PBG] and the General Building Ordinance
[ABV])
10
General Building Ordinance (ABV)
Figure 1.1 Equipment (§ 3 ABV)
Equipment
are ancillary facilities to buildings and installations
Figure 1.2 Installations (§ 4 ABV)
Installations
are technical facilities of buildings and installations
1. 1. 25-127
11
700.2
General Building Ordinance (ABV)
Figure 2.1-2.3 Buildings, Minor Buildings and Annexes (§§ 2, 2 a ABV)
Buildings
a
only ancillary floor areas and
limited in dimensions
Annex
a
Building length of the annex or minor building
Minor building
a
Figure 2.4 and 2.5 Underground Structures, Sub-level Structures
(§§ 2 b, 2 c ABV)
12
Stairs
UGF
SLS
SLS
SLS
Façade 1
Façade 2
UGF
SLS
f
Façade line
Upper edge of finished floor
Underground structures
Sub-level structures
permissible extent of protrusion above the
reference or lowered terrain
Proportion above the façade line
Façade 3
f
SLS
Façade 4
General Building Ordinance (ABV)
700.2
Figure 3.1 and 3.2 Façade Alignment and Façade Line (§§ 6, 6 a ABV)
Flat terrain: (Façade line = projected façade line)
insignificantly recessed building part
protruding building part
Sloping terrain: (Façade line ≠ projected façade line)
Façade line
1. 1. 25-127
Reference terrain
Façade alignment
13
700.2
General Building Ordinance (ABV)
Figure 3.3 Projected Façade Line (§ 6 b ABV)
Annex
insignificantly
recessed
building part
Building
protruding
building part
projected façade line
14
General Building Ordinance (ABV)
Figure 3.4 Protruding Building Parts (§ 6 c ABV)
Annex or
part of the building
protruding
building part
<a
> a
Annex or
part of the building
> b
associated
façade section
associated
façade section
<b
permissible extent for the depth of protruding building parts
permissible extent for the width of protruding building parts
projected façade line
<b
<b
Reference terrain
<b
<b
Façade length
a permissible extent for the depth of protruding building parts
permissible extent for the width of protruding building parts
b
1. 1. 25-127
15
700.2
16
700.2
General Building Ordinance (ABV)
Figure 3.5 Recessed and insignificantly recessed
Building Parts (§ 6 d ABV)
a
recessed
building part
> b
FS
>la
a
insignificantly
recessed
building part
<a
< b
FS
a
permissible extent for the depth of insignificantly recessed building parts
b
permissible extent for the width of insignificantly recessed building parts
FS associated façade section
Π
Façade
✓
Façade line
Figure 4.1 and 4.2 Building Length, Building Width (§ 28 ABV)
Building width
Building length
Building
Building width
Building
Façade line
Smallest enclosing rectangle
Building length
General Building Ordinance (ABV)
Figure 5.1 Overall Height (§ 281 PBG)
Highest points
of the roof structure
Overall height h
technically required roof structure
Highest points of the
roof structure
Overall height h
lowest point on reference
terrain under the ridge line
Reference terrain
lowest point on reference
terrain under the roof surface
Ridge line
Roof surface area above the lowest part
of the reference terrain
Overall height h
Overall height h
Reference terrain
1. 1. 25-127
700.2
17
700.2
Figure 5.2 Façade Height (§ 278 PBG)
General Building Ordinance (ABV)
gable-side
façade height Fh
for valley façade
eaves-side
façade height Fh
Façade height Fh
for valley façade
Façade height Fh
for side façade
Reference terrain
technically required roof structure
Parapet
gable-side
façade height Fh
Parapet
Façade height Fh
for side façade
Façade height Fh
for valley façade
Reference terrain
Façade line
Façade alignment
Intersection line of façade alignment with
upper edge of roof structure
18
General Building Ordinance (ABV)
Figure 5.3 Eaves Height (§ 275 para. 5 PBG)
Intersection point of façade alignment /
upper edge of roof structure
Façade alignment
Upper edge of roof surface
Upper edge of roof structure
700.2
Eaves height
Upper edge of unfinished attic floor
Figure 5.4 Clear Height (§ 304 PBG)
Clear height Floor height
Clear height Floor height
Clear height Floor height
1. 1. 25-127
19
700.2
General Building Ordinance (ABV)
Figure 6.1 Storeys and Number of Storeys (§ 276 PBG)
DA
AG
AG
GF
GF
DA Roof superstructures
AG Attic storeys
GF
GF
DG Attic storeys
GF Full storeys
BS Basement storeys
BS
BS
Reference terrain
Reference terrain
DA
AG
2. GF
DA Roof superstructures
3. GF
AG Attic storeys
1. GF
GF Full storeys
2. GF
BS Basement storeys
1. BS
1. GF
2. BS
IL
BS
Reference terrain
IL
20
General Building Ordinance (ABV)
Figure 6.2 Basement Storeys (§ 275 para. 3 PBG)
Façade line
a permissible dimension for protruding building parts
b permissible average dimension for
the protrusion of the basement storey
C permissible dimension for basement storeys
Proportion of the storey above the façade line
BS Basement storey
UGF Underground structure
UGF
BS
C
b
BS
BS
b
BS
700.2
1. 1. 25-127
21
General Building Ordinance (ABV)
700.2
Figure 6.3 Attic Storeys (§ 275 para. 2 PBG)
Attic storey
Intersection point of façade alignment /
upper edge of roof structure
Eaves height < b
Eaves height < b
b
permissible dimension for the eaves height of attic storeys
Attic storey
Eaves height < b
b
permissible dimension for the eaves height of attic storeys
Attic storey
Eaves height < b
22
General Building Ordinance (ABV)
Figure 6.4 Attic Storeys (§ 275 para. 4 PBG)
700.2
min. h/2
h
min. h/2
Attic storey
Full storey
Full storey
Figure 7.1 Buildable Area and Building Area (§ 7 ABV)
Av
Av
Av
Av
Av;
Av
Av
Building line replaces
the setback requirement
Av Setback requirement
Buildable area
Building area
Building line
P-P Parcel boundary
1. 1. 25-127
23
700.2
General Building Ordinance (ABV)
Figure 7.2–7.4 Setbacks and Setback Areas (§ 260 PBG)
Minor and major boundary setback
A
G
780
Boundary setback
Building setback
Building line replaces
the setback requirement
mG minimum required building setback
minimum required boundary setback
Building line
Façade line
P-P Parcel boundary
minor boundary setback
major boundary setback
minimum required boundary setback
Façade line
Major boundary setback and
Additional length surcharge
minor boundary setback
with additional length surcharge
major boundary setback
minimum required boundary setback
Façade line
24
General Building Ordinance (ABV)
Figure 7.5 Terms (§ 260 PBG / §§ 21–26 ABV)
G = Basic setback
ALS = Additional length surcharge
AHS = Additional height surcharge
g = required boundary setback
BL = Basic length according to building code
AL = Additional length
AH = Additional height
F = Façade height
700.2
permissible façade height for
the standard development
1. 1. 25-127
25
700.2
General Building Ordinance (ABV)
Figure 7.6 Boundary Setback for Stepped Façades (§§ 21–26 ABV)
ALS1
G
G
Governing building length
BL
BL
AL1
BL
AL2
BL
AL1
> 2 G
ALS1
G
G
G
ALS2
AL1
ALS1
G
26
General Building Ordinance (ABV)
700.2
Figure 7.7 Boundary Setback of a Complex Building Volume
(§§ 21–26 ABV)
Assumptions
G = 6 m on all sides
BL = 15 m
ALS = 1/3 AL, max. ALS = 7 m
1. 1. 25-127
27
700.2
General Building Ordinance (ABV)
Figure 7.8 Boundary Setback of a Rounded Building Volume
(§§ 21–26 ABV)
ALS1 G
G
ALS3
AL3
AL2
BL
AL1
ALS2
ALS3
G
Figure 7.9 Boundary Setback
due to additional height
over 12 m
(§ 270 para. 2 PBG)
Figure 7.10 Boundary Setback
due to exceeding
the permissible façade
height (§ 260 PBG)
Boundary
15.00
H
12.00
3.50
6.50
45°
9.60
8.10
3.50
5.00
Boundary
Boundary setback due to additional height =
3.50 m + 3.00 m = 6.50 m
W2
F = 8.10 m
9.60 m 8.10 m = 1.50 m
G = 3.50 m + 1.50 m = 5.00 m
28
General Building Ordinance (ABV)
700.2
Figure 7.11 Boundary, Building, Forest, and Watercourse Setbacks
(§§ 260 et seq. PBG / §§ 21–26 ABV)
Boundary, Building, Forest, and Watercourse Setbacks
Building line
Overlaps
not permissible
Watercourse setback line
according to zoning plan (§ 67 PBG)
Watercourse
Forest setback
Forest setback line
according to zoning plan
forestry law
forest boundary
1. 1. 25-127
29
700.2
General Building Ordinance (ABV)
Figure 7.12 Façade Length (§ 260 PBG / § 27 ABV)
>1.30
≤1.30
≤1.30
Governing
façade length
Governing
façade length
30
General Building Ordinance (ABV)
Figure 7.13 Façade Height with Influence of Boundary and Building Line
Setback (§§ 270 and 278 et seq. PBG)17
Profile line of a W5 (max. façade height = 18.00 m)
Building line setback | Building line influence area according to § 280 para. 3
e.g., 9.00
max. 15.00
Building line setback + 1/9 (§ 280 para. 3)
9.0+1.0-10.0
BL.
DG** - Attic/Loft (or Top Floor)
**VG** - Upper Floor (or Standard Floor)
**150m²** - 150m²
**DG** - Attic/Loft (or Top Floor)
**max. 150m²** - max. 150m²
**VG** - Upper Floor (or Standard Floor)
**150m²** - 150m²
**VG** - Upper Floor (or Standard Floor)
**300m²** - 300m²
**UG** - Basement/Cellar (or Lower Ground Floor)
**UG** - Basement/Cellar (or Lower Ground Floor)
**max. 150m² Keller** - max. 150m² cellar/basement
**zulässig 300m² anrechen- bare Wohnfläche (DG und UG nicht anrechenbar)** - permissible 300m² of computable/chargeable living space (attic/loft and basement not computable/chargeable)
**zulässig 300m² anrechen- bare Wohnfläche auf 1 VG (je max. 150m² im DG und UG nicht anrechenbar)** - permissible 300m² of computable/chargeable living space on 1 upper floor (each max. 150m² in the attic/loft and basement not computable/chargeable)
**The Open Space Ratio**
**Calculation of the Open Space Ratio (OSR)**
The Building Volume Index
Calculation of the Building Volume Index (BVI)
Boundary distance due to increased height =
3.50m + 3.00m = 6.50m
W2
2 x 3.30m + 1.50m = 8.10m
9.60m 8.10m 1.50m
G 3.50m + 1.50m = 5.00m
The Distances
Boundary, Building, Forest, and Watercourse Distances
§§ 260ff PBG (Planning and Building Act)
§§ 21-26 ABV (Ordinance on Building Distances)
forestry law
Forest boundary
Forest distance
Forest distance line
according to zone plan
Watercourse
MLZ 2
G
MLZ 3
MLZ 3
ML2
G
GL
G
ML 2
GL
MLZ1
G
GL
ML1
G
GL
G
MLZ 1
MLZ 4
G
ML 4 G
Building line
MLZ 4
G
MLZ 4
ML 5
GL
G
MLZ 4
X
Overlaps
not permissible
MLZ 8
ML 6
MLZ 7
G
MLZ 6
MLZ 5
ML 1
GL
ML 2
ML 3
G
ML 4
GL
GML3
MLZ 2
§67 PBG
(min. 5.00 m
-Watercourse distance line
according to zone plan
(§ 67 PBG)
The facade length
18.00
18.00
18.00
Reference
Terrain
y
y
Central Zone with 5 Storeys (max. facade height = 21.50 m)
Building Line Influence Area
max. 15.00
max. 21.50
BL. 18.00
5
BL. 15.00
4
3
BL. 9.00
2
1
12.00
3.50
Boundary
X
X
Boundary
12.00
3.50
700.2
1. 1. 25-127
31
32
700.2
General Building Ordinance (GBO)
Figure 8.1 Computable Lot Area (§ 259 Building and Planning Act (BPA))
Lot Area
Building Zone
Lot Area within the Building Zone
Lot Area outside the Building Zone
Computable Lot Area
Development Area
Building Area
Setback Areas
House Driveway
Green Areas*
Computable
Open Spaces*
Areas
Primary Development
Gross Development
Fine Development
Partially Computable
Not Computable
* Open spaces and green areas, insofar as they are part of the building zones and are assigned a corresponding
development ratio.
General Building Ordinance (GBO)
Figure 8.2 Floor Area Ratio (§ 255 BPA)
Para. 2: Attic and Basement Storeys
Example: Residential Zone R2: 2 Full Storeys
1 Attic Storey
1 Basement Storey
FAR 30%
1000 m² (computable lot area)
Attic Storey
Full Storey
150 m²
Full Storey
150 m²
Basement Storey
Attic Storey
max. 150 m²
Full Storey
300 m²
Basement Storey
max. 150 m²
Cellar
Permissible 300 m² computable
living area
(Attic Storey and Basement Storey not computable)
Permissible 300 m² computable
living area on 1 Full Storey
(max. 150 m² each in Attic Storey and Basement Storey
not computable)
1. 1. 25-127
700.2
33
700.2
General Building Ordinance (GBO)
Figure 8.3 Building Volume Ratio (§ 258 BPA)
Reference Terrain
Open Building Parts
Figure 8.4 Computable Building Area (§ 256 BPA)
34
Building
Protruding
Building Part
Attached Structure
Insignificant
Recessed
Building Part
Canopy
Small Structure
Building
Canopy
Projected Facade Line
Computable Building Area
a Permissible dimension for protruding building parts
General Building Ordinance (GBO)
Figure 9.1 Roof Structures (§ 292 BPA)
For Pitched Roofs
max. 1/2 L
L
For Flat Roofs
max. 1/2 L
L
1. 1. 25-127
35
700.2
700.2
Appendix 2
Ordinance
General Building Ordinance (GBO)
on the More Detailed Description of the Terms
and Contents of Building Law Institutions
as well as on Measurement and Calculation Methods
(General Building Ordinance)¹
(of June 22, 1977; as of February 28, 2017)
The Government Council decrees
§ 278 Abs
18.00
18.00
18.00
18.00
18.00
Existing Terrain
Profile line of a W5 (max. building height 5 x 3.3 + 1.5 = 18.00 m)
Building line influence area
max. 15.00
max. 21.50
BL. 18.00
BL. 15.00
BL 9.00
BL.
4.00 4.00
2
3
4
5
Central zone with 5 stories (max. building height 5x4.0+1.5=21.50m)
Method of measuring ridge height
max. possible roof shape
Building height
Terrain line
possible roof shapes
Method of measuring knee wall height
0.4m
max. 0.9m (or 1.3m) clear height (finished construction)
A
A'
B
B'
Building height
§275 para. 2 PBG
Ridge height
Permitted Building Height
**45°**
**H1**
**Permitted Building Height**
**H2**
**H1 not permitted, exceeds**
**permitted building height**
**H2 permitted**
**H2**
**45°**
**45°**
**Roof structures**
For Pitched Roofs
max. 1/3 L
L
**For Flat Roofs**
max. 1/3 L
L
**Ridge Boundary Line**