Art. 54 Act on the Utilisation of Water Power (LcFH) - 4. Expiration of the Concession Period with Exercise of the Reversion Right
Art. 54 kWRG · 4. Expiration of the Concession Period with Exercise of the Reversion Right
1. The reversionary right to a hydroelectric power plant constitutes a discretionary right of the entitled public entity (canton or municipality).
2. The entitled public entity is authorized, within the scope of exercising the reversionary right, to take over the following facilities as specified
a) Gratuitously: The facilities erected on public and private land for damming and capturing, diverting, or circulating the water, the pumping installations, the turbines, as well as the electrical equipment and installations necessary for the operation of these facilities, together with the buildings or caverns in which they are located, including the land serving the operation of the hydroelectric power plant;
b) For reasonable compensation: The facilities for generating, transforming, and transmitting electrical energy, the service and administrative buildings, as far as these objects are located within the canton’s territory.
3. For cross-border hydroelectric power plants, the facilities and transmission lines are covered by the reversion as long as they are owned by the grantee and (or) form part of the works from which they originate.
4. As far as the entitled public entity requires the transfer of electrical facilities as per paragraph 2 letter b, the concessionaire is obliged to transfer the entire (movable and immovable) property. The obligation for the entitled public entity to take over the electrical part, according to Article 67 paragraph 2 WRG, remains reserved.