705.100
BAUVOC
CH-VS
Art. 48 Ordinance on Buildings (OC) - Posting of the Building Permit Certificate
Building Permit - Building Permit Procedure - Validity of the Building Permit
Art. 48 BauV - Posting of the Building Permit Certificate · Posting of the Building Permit Certificate
1. The holder of a construction permit must display a certificate of the construction permit at the entrance of the construction site in a clearly visible location from the start and throughout the duration of the construction work, provided the competent authority has required this.
2. This certificate contains the dossier number, the name of the holder of the construction permit, the parcel number or the locality, the subject matter of the permit, the date of issuance, and the period of validity. Its content is identical to the first page of the construction permit.