Art. 24 Ordinance on Buildings (OC) - Connection to District Heating
Building Permit - General Provisions - Requirement for Building Permit
Art. 24 BauV - Connection to District Heating · Connection to District Heating
**1. The connection to a district heating system, supplied with at least 75 percent renewable energy or waste heat, is not subject to building permit requirements. It must be reported to the competent authority before construction begins.**
**2. The plans and other documents that need to be attached to the notification, as well as the number of copies required, are specified in guidelines prepared by the department. The documentation must include relevant and necessary information to verify compliance with the conditions of the special legislation.**
**3. Outside of designated building zones, the provisions of federal law are reserved.**
Court Decisions Applying This Provision (4)
A1 21 198 · vs (art. 24 al. 3 et 4 OC)
Building Permit Refusal Upheld Due to Co-Owner Signature Absence and Unapproved Enlargement
Cited by the municipality when requesting the completion of the file regarding prior authorizations.
A1 12 206 · vs (Art. 24 lit. d und e BauV)
Billboard Permit Appeal Dismissed on Aesthetic and Safety Grounds
This provision was cited as a basis for denying the building permit due to aesthetic concerns (as mentioned in the introductory summary).
A1 08 76 · vs (Art. 24 al. 1 let. d OC)
Town Center Development Permit Annulment over Building Distance Violations and Historic Character Concerns
Cited regarding the requirement for a satisfactory aesthetic aspect of constructions, though the appeal regarding this point was rejected.
A1 08 76 · vs (Art. 24 al. 1 let. e OC)
Town Center Development Permit Annulment over Building Distance Violations and Historic Character Concerns
Cited regarding the requirement that constructions must not impair the quality of the built site, though the appeal regarding this point was rejected.