Building Act (LC) - Purpose and Scope (BAUG)

88 Articles / Provisions · Switzerland · Canton of Valais
Open official source Machine-readable Markdown (.md)

Table of Provisions (88)

Art. 1 BauG Art. T1-1 BauG - General Transitional Provisions Art. T1-2 BauG - Appeal and Supervision Art. T1-3 BauG - Digital Platform Art. T1-4 BauG Art. 2 BauG - Responsibilities Art. 3 Construction Act Art. 4 BauG Art. 5 BauG - b) Composition Art. 6 BauG Art. 7 BauG - d) Operation Art. 8 BauG - Digital Platform Art. 9 BauG Art. 10 BauG Art. 11 BauG Art. 12 BauG Art. 13 Building Act Art. 14 BauG - Vested Rights Guarantee Art. 15 BauG Art. 16 BauG - Boundary Distance and Building Distance Art. 17 Building Act Art. 18 BauG - Building Lines Art. 19 BauG - Reservations of Special Legislation Art. 20 Construction Act Art. 21 BauG - Excavation Depth Art. 22 Construction Law (BauG) Art. 23 BauG - Cumulative Height with Excavation Art. 24 BauG - Determination of Heights Art. 25 BauG - Definition and Establishment Art. 26 BauG Art. 27 BauG - Utilization Numbers Art. 28 Building Code Art. 29 BauG Art. 30 Construction Act Art. 31 BauG - Closed Construction Method Art. 32 BauG Art. 33 BauG - Directory Art. 34 BauG Art. 35 BauG - Choice of Materials and Colors Art. 36 BauG Art. 37 BauG - Architecture, Safety, and Hygiene Art. 38 BauG - Playgrounds and Outdoor Areas Art. 39 BauG - Parking Spaces Art. 40 BauG - Environment and Emissions Art. 41 BauG - Energy Technical Building Regulations Art. 42 BauG - Reservations of Special Legislation Art. 43 Construction Law Art. 44 BauG - Exception from the Approval Requirement under the Present Law Art. 45 Construction Act Art. 46 BauG Art. 47 BauG Art. 48 BauG - Notification Procedure Art. 49 BauG - Building Application Art. 50 BauG - Consultation of Cantonal Authorities by Municipalities Art. 51 BauG Art. 52 BauG Art. 53 BauG - Publication Art. 54 BauG Art. 55 BauG Art. 56 Construction Law Act Art. 57 BauG Art. 58 Construction Act - Form Art. 59 BauG - Legal Retention Art. 60 BauG - Conciliation Hearing Art. 61 BauG - Construction Decision Art. 62 BauG - Duration of Validity Art. 63 BauG Art. 64 BauG - Appeal - Suspensive Effect Art. 65 Construction Law Act Art. 66 BauG - Competencies Art. 67 BauG Art. 68 BauG Art. 69 BauG Art. 70 BauG - Disturbance of Public Order Art. 71 Construction Law Art. 72 BauG - Substitute Performance Art. 73 BauG Art. 74 BauG - Criminal Offenses and Penalties Art. 75 BauG - Limitation Period Art. 76 BauG - Miscellaneous Provisions Art. 77 BauG Art. 78 BauG - Preliminary Investigation Art. 79 Construction Act Art. 80 BauG - Costs Art. 81 BauG - Costs and Party Compensation Art. 82 BauG - Costs for Building Permits Art. 83 Construction Law Act Art. 84 BauG - Enforcement

Statutory Text (88 Articles)

General Provisions

1. This Act uniformly regulates the construction, modification, demolition, reconstruction, and maintenance of buildings and facilities. It ensures, in particular, that these meet the requirements of public health, public safety, and environmental protection, and that they guarantee a high quality of the developed area and its surroundings.

2. It ensures, while respecting private property, compliance with the objectives and principles of federal and cantonal spatial planning law.

Transitional Provisions

1. This law shall be applicable from its date of entry into force. All decisions made after its entry into force shall be based thereon. The provisions of this chapter are reserved.

2. The Land Use Regulations (LUR) must be adapted by December 31, 2030. If the legislative body of a municipality has approved the revision, the State Council may, by a decision published in the official gazette, extend this deadline for the affected municipality until the finality of a homologation decision.

3. As long as the LUR have not been adapted in accordance with paragraph 2

a) The exploitation rate under the old law shall be replaced by the Floor Area Ratio (FAR). Appendix 1 to the Building Ordinance provides the corresponding FAR values for the previous exploitation rates. The introduction of the FAR shall in no way lead to a reduction in construction potential;

b) Urban district or detailed utilization plans approved before the revision of the LUR must use the new utilization rates, without being able to rely on the old law, even if it is more advantageous; however, the regulation of these special plans may provide for the utilization surcharges that the municipalities can incorporate into their LUR in accordance with the Building Ordinance, even if this has not yet occurred;

c) The total height and the facade height shall be calculated according to the old law;

d) The provisions concerning the floors are directly applicable, even if the regulations of the LUR are stricter, until the LUR are adjusted in the sense of paragraph 2.

Transitional Provisions

1. Appeal proceedings are governed by the law that is in effect at the time the first-instance authority makes its decision.

2. The law applicable to the supervisory procedure is determined by the point in time when the procedure is initiated.

Transitional Provisions

1. The schedule for the initialization of the platform is determined by the State Council. The State Council establishes for each municipality and the SKBK individually that the platform is operational.

2. Within 6 months following the determination by the State Council that the platform is operational in a municipality or at the SKBK, dossiers submitted in paper form will be digitized free of charge by the competent authority and recorded on the platform.

3. The procedures mentioned in Article 8 of this Act will be implemented and made publicly accessible on the platform by December 31, 2026. The implementation of a procedure on the platform and its public accessibility will be announced by the department in the official gazette.

Transitional Provisions

1. Also recognized as a plan author in the sense of Article 51 is a holder of a Federal VET Diploma (EFZ) in the field of Draftsman specializing in Architecture or Civil Engineering, who, as an authorized signatory or agent of a company whose registered purpose demonstrates that it operates in the technical area of the submitted construction project, has been individually or collectively registered in the commercial register for 10 years prior to the commencement of this law.

2. In the event of the termination of signing authority or agency, a new signing authority or agency can be considered. The total duration of the signing authority or agency must amount to at least 10 years before the commencement of this law in the technical area of the submitted construction project.

3. The applicant submits extracts from the commercial register and all other documents demonstrating that the conditions of this article are met to the competent authority.

General Provisions

1. The municipal council is responsible for construction projects within the building zones, particularly in

a) Residential zones;

b) Core zones;

c) Commercial zones;

d) Industrial zones;

e) Zones for public buildings and facilities;

f) Zones for sports and recreation activities within the perimeter of the building zones or directly connected to them, provided they do not exceed a total area of 3 hectares.

2. The Cantonal Building Commission (hereinafter: CBC) is responsible for construction projects outside the building zones, particularly in

a) Agricultural zones;

b) Protection zones;

c) Small settlements outside the building zone such as hamlet and preservation zones;

d) Areas with traditional scattered building patterns;

e) Zones with buildings protected as landscape-defining, such as alpine pasture zones;

f) Other zones for sports and recreation activities;

g) Zones for extraction and landfills;

h) Forest areas.

3. The CBC is responsible for construction projects that lie within the perimeter of a cantonal usage plan.

4. The CBC is responsible for construction projects where the municipality is in a conflict of interest, particularly because it is the owner of the land or is involved in the construction project through another property right. If the municipality's involvement is minor, the CBC may transfer its jurisdiction to the municipality. In this case, the municipality shall notify the CBC of its final construction decision. The regulation specifies the cases in which the jurisdiction lies with the municipal authority by default.

5. The decision to transfer jurisdiction is part of the publicly accessible file. It cannot be the subject of a separate appeal.

6. If a particular construction project falls under the jurisdiction of both the municipality and the CBC, specifically when it is located in two different zones, the CBC can decide, subject to the consent of the municipality and the applicant, to process the construction application as a whole. This decision must be made before the public announcement.

General Provisions

1. The department within the meaning of this law is the department responsible for construction matters.

2. The office within the meaning of this law is the office responsible for legal matters of the department.

3. The office provides the public with general information about the applicable building regulations.

4. The office answers general questions from the competent building authorities at the municipal, cantonal, and federal levels.

5. If a construction project is of public interest, the office can offer special support to the applicants.

6. The office sets up the secretariat of the Cantonal Building Commission (hereinafter: CBK), whose tasks are regulated in the Building Ordinance (BauV).

7. The office sets up an information desk for building authorities (hereinafter: IBBA), whose tasks are regulated in the BauV.

General Provisions

1. The KBK is an interdisciplinary and independent authority. It is administratively affiliated with the department.

General Provisions

1. The KBK consists of five members, including at least one architect, one lawyer, and one engineer

a) The lawyers must possess a licentiate in law or a Master of Laws degree from a Swiss university;

b) The architects must hold an architectural diploma or doctorate conferred by a Swiss university or a foreign diploma recognized as equivalent by the State Secretariat for Education, Research and Innovation (SERI);

c) The engineers must possess an engineering diploma or doctorate awarded by a Swiss university or a foreign diploma recognized as equivalent by the State Secretariat for Education, Research and Innovation (SERI).

2. The members must demonstrate proficiency in one of the two official languages and very good proficiency in the other.

3. One member of the KBK must be elected from the residents of the current districts of Goms, Brig, Visp, Raron, and Leuk; one from the residents of the districts of Siders, Sitten, Ering, and Gundis; and one from the residents of the districts of Martinach, Entremont, Saint-Maurice, and Monthey. The remaining two members are to be elected from residents of any district in the canton.

General Provisions

1. The members are appointed by the State Council for a term of office.

2. The term of office of the members may be extended no more than twice.

3. The State Council determines the remuneration of the members.

General Provisions

1. The KBK convenes with five members.

2. The KBK is only quorate when at least three members are present.

3. The members appoint a president from among themselves for the duration of the term.

4. If the president is not present at a meeting, the members present will determine who shall preside over the meeting at its commencement.

5. The head of the SKBK participates in the KBK meetings. He has an advisory vote. He may be represented by another employee of the SKBK.

6. The KBK approves or rejects the draft decision submitted by the SKBK by a majority of the members present. In the event of a tie vote, the president has the casting vote.

7. For matters of minor importance, such as extending the validity of a building or occupancy permit, the president, or, in his absence and upon delegation, one of the members, can make the decision alone. The KBK adopts internal regulations governing the application of this provision.

8. The KBK may delegate the authority to conduct a conciliation hearing, to carry out an on-site inspection, or to conduct a coordination meeting with the applicant to one of its members.

9. In the event of a conflict of interest, the members of the KBK recuse themselves in accordance with the provisions of the Administrative Procedure and Administrative Justice Act (VVRG).

General Provisions

1. The canton provides a cantonal digital platform, eConstruction (hereinafter: Platform), which allows for the initiation and management of all procedural actions (namely requests for preliminary decisions, building applications, notifications, warnings, demands, notifications) as stipulated in the present law and its ordinance, with the exception of supervisory and complaint procedures.

2. For the files within their jurisdiction, a municipality may waive the use of the Platform, as can a participant to whom the use of the Platform is offered by the competent authority. Municipalities must publish their decision to waive the use of the Platform in the official gazette. Otherwise, they must provide participants with the opportunity to use the Platform.

3. The authority responsible according to Article 2 of the present law determines the access rights for administrative authorities that need to express opinions on the files submitted on the Platform.

4. Throughout the entire procedure, the parties must have access to the complete file; exceptions provided for in the law are reserved.

5. Except for exceptions according to the present law or its ordinance, the validation of documents submitted on the Platform is considered equivalent to a handwritten signature. The Platform ensures that the content of each communication and document is not altered (authenticity) and that the recording of digital data can be attributed to a specific time (timestamp).

6. A verified digital identity is required to perform the validation.

7. The State Council shall issue regulations for access to and the use of the cantonal digital platform eConstruction (hereinafter: ReC).

8. The systems used by administrative authorities for the validation of documents on the Platform must meet the technical and security requirements set out in the ReC.

9. The provisions for data protection remain expressly reserved.

General Provisions

1. If the use of the platform is offered by the competent authority, the party involved in each individual building law procedure has the option to choose whether it should be initiated and conducted in a digital format or in a paper format. Once the choice has been made, the procedure and all communications associated with it, up to the archiving of the dossier, shall be conducted in the chosen format. In exceptional cases, the authority may, upon a well-reasoned application, agree to a change of format.

2. The party who has chosen the digital format must at all times be prepared to receive notifications on the platform. A notification may contain a link that the party must access. The competent authority is in no way responsible for the consequences of irregular or delayed consultations of the platform and the communications and links announced therein. The same applies if the platform and the communications and links announced therein are not consulted.

3. By choosing the digital format, the party undertakes to consult the platform in such a way that they can both take note of the notifications entered there by the competent authority and fetch any links contained in these notifications in a timely manner.

4. Dossiers handled in paper format will be digitized and archived by the competent authority.

General Provisions

**1. All digital communications by an authority are conducted by depositing a message to the party on the platform. The retrieval of this message by the party is considered the delivery time of the message and the links contained therein. If the message is not retrieved, it is considered delivered and retrieved, along with the links contained within, no later than 7 days after being deposited on the platform.**

**2. Every digital communication by an authority and each retrieval of a message receives a timestamp, which allows for determining the exact time of deposition of a message to the party and the time of retrieval of a message on the platform.**

**3. Every digital communication by a party receives a timestamp, which allows for determining the exact time of the communication.**

**4. The timestamp can particularly be used to verify whether the deadlines set for the party have been met.**

**5. If the required qualified electronic signature is missing, the authority shall set a deadline for the party to rectify this deficiency. If the missing signature is provided within the set deadline, the deficiency is considered rectified. Otherwise, the document for which the qualified electronic signature is required, as well as any possible enclosures, are deemed inadmissible.**

General Provisions

1. The competent authority delivers its decisions via the platform, provided that the party involved has expressly consented to this form of communication. Express consent is given by the party placing a check mark at the location indicated on the platform.

2. The decisions are provided with a qualified electronic signature in accordance with federal legislation on electronic signatures.

3. The further modalities of the delivery are regulated in the ordinance.

Building Regulations - General Provisions

1. Municipalities are obligated to issue all implementing regulations required for coherent urban planning within their municipal construction and zoning regulation (hereinafter: CZR). The nature and content of these regulations are determined according to the specific characteristics of each zone and must, in any case, comply with superior law, particularly concerning the terms and measurement methods.

2. Municipalities may only enact divergent provisions if the building legislation expressly provides for this.

3. Municipalities may issue stricter substantive building police regulations, provided they adhere to definitions exclusively governed by superior law.

Building Regulations - General Provisions

1. The Intercantonal Agreement on the Harmonization of Construction Terms (hereinafter: IVHB) shall apply when cantonal or municipal law enacts provisions using the definitions of the IVHB. Cantonal legislation and municipal regulations may introduce terms, provided they are not included in the IVHB or the applicable cantonal construction legislation.

2. Public law provisions arising from special legislation are reserved.

3. In the absence of provisions in cantonal legislation and municipal regulations, the competent authority may refer to the rules established by professional organizations in technical standards.

4. Private law provisions are reserved, particularly the cantonal introductory law to the Swiss Civil Code (EGZGB).

Building Regulations - General Provisions

1. Existing buildings and structures that were constructed in accordance with the old law and that contradict current plans or regulations may be maintained, renovated, extended, rebuilt, or repurposed.

2. In the context of interest balancing, appropriate consideration must be given to the protection of the architectural heritage and to public or private interests.

3. The protection of vested rights outside the construction zone is governed by federal law.

4. Municipalities may stipulate in their Building and Zoning Regulations (BZR) that enlargements, reconstruction, and changes of use are only possible on the basis of a special use plan.

5. Permits under road legislation for construction projects near a cantonal road, as well as additional provisions from special laws, remain reserved.

Building Regulations - General Provisions

1. Exceptions to the usage regulations of the building zone as well as to other building regulations can be granted by the competent authority if extraordinary circumstances or important reasons exist and neither public interests nor prevailing private interests of a neighbor are impaired.

2. Exceptions for easily removable small or movable structures can be granted on a provisional basis if the applicant can demonstrate a sufficient interest and if no public or prevailing private interests of a neighbor are impaired.

3. For construction projects of a traditional or experimental character, whether from an architectural or structural engineering point of view, the competent authorities may grant exceptions to the provisions set forth in this law, its executive orders, and the BZR, taking into account the rights of third parties as well as landscape and local appearance protection.

4. Exceptions may be granted for a specific duration or with the reservation of revocation at any time. Upon expiration of the period or upon revocation of the exception, the approved structure or facility must be removed by the respective owner within a reasonable period; they have no claim to compensation.

5. Exception permits can be subject to conditions and obligations. In particular, the following conditions are permissible

a) In the event of expropriation, no compensation will be provided for value-increasing expenditures related to works carried out based on an exception permit;

b) Structures and facilities approved for a specific purpose may not be repurposed, subdivided, or converted into condominium ownership;

c) A security for the fulfillment of obligations related to the building permit must be provided.

6. The time limitation, the waiver of compensation (removal and value-added reversal), the prohibition of repurposing, subdivision, and conversion, as well as the obligation to provide security, must be noted in the land register prior to the commencement of construction.

7. Exceptions outside the building zone are governed by federal law. The land use planning protection of structures and facilities outside the building zone can be determined on a case-by-case basis by the KBK.

1. Building Regulations - Land Use Regulations - Setbacks

1. The boundary setback is the distance between the projected facade line and the parcel boundary. The building setback is the distance between the projected facade lines of two buildings.

2. Protruding building elements are not considered in the setback calculation. Exceptions are subject to specific regulations regarding projections in road legislation and fire safety regulations.

3. Underground structures are not subject to the setback rules and can be built up to the property boundaries. For certain structures, municipalities can provide exceptions in their BZR.

4. Setbacks in relation to roads are determined by road legislation and municipal regulations.

5. If municipalities establish a minimum setback based on facade height, the definition of facade height is as per IVHB. Municipalities can issue provisions on the inclusion of dormers and other similar structures for calculating facade height.

1. Building Regulations - Land Use Regulations - Setbacks

1. Municipalities shall generally establish boundary and building setbacks for each zoning type within their land use plan. They shall also generally establish a reduced boundary setback for annexes and small structures.

2. Municipalities may waive the requirement to establish boundary and building setbacks for each zoning type within their zoning use plan, provided other regulations ensure coherent local planning.

3. Municipalities may, under special conditions, allow deviations from the building setbacks specified in their Land Use Zoning Plan (LUZP) through a special use plan.

4. The waiver for setting setbacks for a zoning type and the exceptions granted due to a special use plan do not apply to parcels adjoining the perimeter.

5. Boundary setbacks may be altered while maintaining the building setback through the establishment of an easement by the property owner. This easement shall also be recorded in favor of the municipality in the land register.

1. Building Regulations - Land Use Regulations - Setbacks

1. Building lines delimit construction and serve in particular to secure existing and planned facilities and areas, as well as architectural design.

2. Building lines are established particularly along traffic facilities, pipelines, as well as natural and cultural objects and agricultural zones. The procedures and the establishment of building lines are determined by special legislation and municipal regulations.

3. Design building lines determine the location and outlines of buildings or establish the course of the facade alignment. Rear building lines and interior building lines determine the permissible horizontal building depth and the size of inner courtyards. Design building lines can be established within the framework of a planning procedure.

4. Building lines take precedence over general distance regulations, even in cases where the general distance is more restrictive.

1. Building Regulations - Land Use Regulations - Setbacks

1. Reserved are the prescribed distances and open spaces to be adhered to as set forth in other legislations, particularly concerning fire protection, forestry, or water protection laws. These take precedence over less restrictive building lines.

1. Building Regulations - Regulations on Land Use - Heights

1. The total height is the greatest vertical difference between the highest point of the roof structure and the point directly below it on the significant terrain.

2. The significant terrain is considered to be the naturally grown ground. If this cannot be determined due to previous excavations and embankments, the natural terrain of the surrounding area should be used as a reference. For spatial planning or development-related reasons, the significant terrain can be determined differently in a planning or building permit process.

3. Municipalities may establish a side height for buildings. The definition of side height is identical to the term of facade height according to IVHB, whereby the facade height is the greatest vertical difference between the intersection line of the facade plane and the upper edge of the roof structure.

4. For buildings that are staggered in height or position, the total height is determined separately for each building part.

5. Roof structures are not included in the calculation of the total height.

1. Building Regulations - Regulations on Land Use - Heights

1. Excavation Depth corresponds to the difference in elevation between the naturally growing ground and the lowest point of the shaped ground, extending over the total height. The Building Regulations (BauV) may provide that, for specific cases, the excavation depth is not measured over the total height.

1. Building Regulations - Regulations on Land Use - Heights

1. The total height with excavation corresponds to the sum of the total height of the building and the excavation height.

1. Building Regulations - Regulations on Land Use - Heights

1. The cumulative height with excavation corresponds to the difference between the highest point of the roof structure of the highest tiered building section and the lowest point of the designed ground.

1. Building Regulations - Regulations on Land Use - Heights

1. Municipalities shall determine a maximum value for the total height and excavation height for each type of construction zone, which must be adhered to. Alternatively, they may establish a maximum total height including excavation as a cumulative value.

2. In certain cases specified by the building regulations (BauV), excavations for garage entrances and house access points shall not be counted towards the total height including excavation height.

3. Municipalities may waive the determination of heights in clearance zones and zones for public buildings and facilities.

Building Regulations - Regulations on Land Use - Full Stories

1. Full stories are considered as all stories of buildings, except for basement, attic, and penthouse stories. The number of full stories is determined separately for each part of the building.

2. The municipalities may establish a minimum or maximum number of full stories for each zoning type.

**Building Regulations - Regulations on Land Use - Utilization Numbers**

1. The credited parcel area (aGSF) serves as the basis for calculating the usage ratios and corresponds to the parcel areas or parts of parcels located in the respective construction zone.

2. The area of the accesses on the credited parcel is taken into account.

3. The area of the house accesses is credited. The areas of primary, rough, and fine development are not credited.

**Building Regulations - Regulations on Land Use - Utilization Numbers**

1. **The Floor Area Ratio (FAR)** is the ratio of the sum of all floor areas (FA) to the creditable plot area (CPA). The sum of all FA includes the main and accessory use areas, circulation areas, structural areas, and functional areas. Areas with a clear height of less than 1.80 meters are not included.

2. **The Building Coverage Ratio (BCR)** is the ratio of the creditable building area (CBA) to the creditable plot area (CPA). The CBA is considered as the area within the projected facade line.

3. **The Building Volume Ratio (BVR)** is the ratio of the construction volume above the reference terrain (CVT) to the creditable plot area (CPA). The construction volume above the reference terrain is defined as the volume of the building mass in its external dimensions.

4. **The Green Area Ratio (GAR)** is the ratio of the creditable green space (CGS) to the creditable plot area (CPA). The CGS is considered as natural and/or planted ground areas of a plot, which are unsealed and not used for storage purposes.

**Building Regulations - Regulations on Land Use - Utilization Numbers**

1. Municipalities may introduce one or more utilization ratios and determine the type and maximum value of the utilization ratio for each of their construction zones.

2. With the aim of achieving a denser construction style, municipalities may establish a minimum utilization ratio for new buildings in each of their construction zones. Special provisions of spatial planning remain reserved, provided that they stipulate different limitations for the extent of land use.

**Building Regulations - Regulations on Land Use - Utilization Numbers**

1. The involved landowners may agree through a servitude agreement that unused development rights can be transferred to another building plot.

2. The transfer of usage rights between properties is permissible, provided they are within a construction zone of the same use. The transfer may also occur if the properties are separated by zones of a different type. The transfer must not lead to a misappropriation or use that is contrary to the zoning designation of the concerned zone.

3. The servitude must also be registered in the land registry in favor of the municipality before the commencement of construction.

**Building Regulations - Regulations on Land Use - Utilization Numbers**

1. In the Construction Ordinance (BauV), it is stipulated in which instances a surcharge on the utilization numbers may be granted, particularly for special usage plans, buildings with exceptionally low energy consumption, commercially used ground floors, or hospitality buildings.

2. If a construction project receives a surcharge on the utilization number due to the intended use of the entire or part of the building areas, the building permit decision must include a condition to maintain the intended use, which is to be noted in the land register.

3. Neither municipal regulations nor other cantonal special legislations may establish rules concerning utilization surcharges or the exclusion of areas or volumes. The Construction Ordinance (BauV) can provide cases where municipalities may issue regulations regarding utilization surcharges in municipal regulation.

Building Regulations - Regulations on Land Use - Construction Method

1. The closed construction method is permitted under the following alternative conditions

a) if the building zone regulations provide for it;

b) if the neighboring building is located on the property boundary and the closed construction method is permissible in terms of architecture and hygiene;

c) by establishing a mutual boundary building right, which is also registered in favor of the municipality in the land register.

2. If one of the owners waives the closed construction method after establishing the annexation right, they must adhere to double the legal boundary distance.

Building Regulations - Regulations on Land Use - Monitoring Compliance with Building Regulations and Register

1. The area used as the basis for calculating building distances, boundary setbacks, utilization ratios, and other factors dependent on parcel size may not be reused for subsequent constructions.

2. Municipalities, when reviewing their records, and the licensed surveyor registered in the federal register, who prepares a mutation protocol for a boundary change or parcel division, shall ensure that the material regulations are complied with.

Building Regulations - Regulations on Land Use - Monitoring Compliance with Building Regulations and Register

1. The municipalities maintain a register that includes all building permits issued by the municipal council and the KBK (indicating the topographical coordinates, the parcel number, and the plan number).

Building Regulations - Regulations Concerning Alignment, Appearance, and Landscaping

1. Buildings and structures must be adapted, particularly in terms of size, location, shape, material, and color, to the architectural and landscape environment.

2. Buildings, structures, and exterior installations must be designed and maintained in such a way that they harmoniously blend into the landscape and architectural surroundings.

Building Regulations - Regulations Concerning Alignment, Appearance, and Landscaping

1. Materials and colors of facades and roofs must provide the building with a uniform, harmonious appearance that is adapted to the location.

2. The competent authority may require, as a condition in the building permit, that samples be submitted for approval no later than at the notification of the commencement of construction.

Building Regulations - Regulations Concerning Alignment, Appearance, and Landscaping

1. Changes to the naturally grown soil must be kept to a minimum. The construction project must be adapted to the terrain's form. The modified soil must harmoniously integrate with the neighboring plots.

2. Municipalities may establish maximum heights for fills and excavations for each type of construction zone, based on the naturally grown soil, to ensure adequate integration of the structures into the existing terrain.

3. When constructing retaining walls or similar structures on the boundary or within a plot, as well as when creating slopes in the modified soil, consideration must be given to the characteristics of the naturally grown soil, particularly the terrain's form and its condition.

4. The provisions of the road legislation, particularly regarding walls and fences, hedges and trees, remain reserved.

Building Regulations - Technical Requirements

1. Buildings and structures must conform to the recognized standards of the art of building. They must, in particular, comply with requirements related to fire protection, natural hazard protection, earthquake protection, and health and commercial police regulations.

2. Buildings and structures must not endanger the safety and health of individuals or impair the property of third parties.

3. Builders and their representatives are responsible for compliance with the regulations and recognized standards of the art of building. They are also liable for damages resulting from the violation of these regulations and standards. Cantonal and federal criminal provisions remain reserved.

4. Workers' accommodations, dining areas, construction site facilities, and all activities related to construction operations must meet the recognized requirements and standards concerning hygiene and accident prevention.

5. The competent authority is not liable for damages arising from the fact that builders and their representatives violate the provisions of this law.

Building Regulations - Technical Requirements

1. The BZR may stipulate that the developer can be required by the competent authority to provide sufficient playgrounds for children when constructing multiple residential units. Their purpose can be secured by establishing an easement in favor of the municipality. Alternatively, the municipality may levy a purpose-specific substitute payment if the development is located in the vicinity of a public playground.

2. The BZR may provide for requirements regarding the design of the surrounding environment.

Building Regulations - Technical Requirements

1. Obligations Related to Parking Spaces (mandatory establishment, number, dimensions, location, shared areas, exemptions, and compensatory measures) are regulated by the Road Legislation and the Standards of the Swiss Association of Road and Transportation Experts. Municipalities can issue parking regulations within the framework of the principles established here.

2. If a project is expected to significantly increase the average daily traffic, the obligations concerning parking spaces can be defined in a mobility plan. This plan must comply with the regulation issued by the State Council. The regulation of the State Council specifies the objectives, orientations, and modalities of the mobility plan. The requirements according to road legislation and the cases provided for in the cantonal master plan are reserved.

3. Municipalities that have adopted a parking concept can provide in their BZR (Building and Zoning Regulations) sectors where the number of parking spaces falls below the range specified in the VSS (Swiss Association for Standardization) standard. The minimum content of a parking concept is determined in a regulation by the State Council.

4. Furthermore, municipalities can require that parking spaces, particularly for certain types of buildings and facilities, be constructed underground, with unpaved surfaces, or with green roofs.

Building Regulations - Technical Requirements

1. Buildings and structures must not result in any effects on the neighborhood that contradict the zoning regulations.

2. If such effects on adjacent residential areas are possible during a construction project, this must be considered within the context of balancing interests. In the building permit procedure, the necessary conditions and requirements can be imposed or project modifications demanded.

3. Subject to the provisions of environmental protection legislation.

Building Regulations - Technical Requirements

1. For existing buildings that are being renovated or renewed to meet the requirements of cantonal energy legislation or to obtain a label recognized by the competent cantonal authority

a) The exceedance of a maximum of 20 cm for thermal insulation or solar installations shall not be counted in the calculation of, in particular, building height, building, boundary, waterway, road, or parking distances, nor in building lines;

b) Additional insulation on facades, including external cladding, shall not be counted in the calculation of the utilization index.

2. Paragraph 1 takes precedence over cantonal or municipal regulations regarding building distances, building heights, building lines, and the calculation of utilization indices. Reserved are, in particular, fire protection regulations (building materials) and the special legislation for heritage protection.

Building Regulations - Technical Requirements

1. Technical requirements derived from other legislation, such as technical regulations for natural hazard prevention or for disabled-accessible construction, remain reserved.

Building Permit - General Provisions

1. Subject to building permit requirements are the construction, alteration, expansion, renovation, change of use, and demolition of all artificially created and permanently established facilities that have an impact on spatial planning, environmental protection, or building law enforcement.

2. The building permit requirement for facilities that utilize renewable energies, such as solar panels, heat pumps, or connection to a district heating system, is regulated in the Building Ordinance (BauV), which specifically defines the type of facilities as well as the conditions they must fulfill. For these facilities, the BauV may replace the building permit procedure with a notification procedure. Provisions of federal law remain reserved.

3. For insignificant structures and facilities, minor changes to the naturally evolved terrain, and other structures and facilities defined in the ordinance, a simplified approval procedure is introduced.

Building Permit - General Provisions

1. No building permit pursuant to the present law is required for constructions and facilities that are entirely or partially exempt from cantonal building authority according to federal legislation. Exempt from cantonal authority are, in particular, buildings and facilities for national defense, railway facilities, national roads, navigation, aviation, gas supply pipeline installations, nuclear plants, electrical lines, as well as aerial cableways and funicular railways.

2. No building permit pursuant to the present law is required for constructions and facilities whose approval is the subject of a special cantonal legal procedure, including public roads, structural improvement projects, water engineering projects, ski lifts, hydroelectric power utilization projects, structures for recreational traffic routes, as well as protective constructions against natural hazards.

3. Construction projects that are neither subject to a building permit nor to the notification procedure are determined in the BauV.

4. Changes to the naturally grown soil outside the building zone with an area of up to 2,000 m² and a height of up to 50 cm through the supply of earth material are exempt from the building permit requirement. However, these measures are subject to the notification procedure pursuant to Article 48 of the present law. The applicable conditions and procedures are defined in the BauV.

5. Neither a building permit nor the notification procedure pursuant to the present law is required outside the building zone and only for parcels not classified as crop rotation areas for changes to the naturally grown soil (fills and excavations) with an area of up to 500 m² and/or a height or depth of 100 cm.

Building Permit - General Provisions

1. The VVRG applies, provided that the construction legislation does not contain any special provisions.

Building Permit - Request for Information and Request for Preliminary Decision

1. Based on summary building files, a request for information regarding the buildability of a specific plot of land may be submitted to the competent authority.

2. The request for information does not qualify as a building application. The information provided does not bind the competent authority and cannot be the subject of an appeal.

Building Permit - Request for Information and Request for Preliminary Decision

1. To clarify significant construction and usage issues, a preliminary decision may be requested from the competent building permit authority. All documents necessary for the assessment of the request must be enclosed with the application.

2. The same procedure as for a building application is applicable.

3. The preliminary decision is binding for third parties and the building permit authorities concerning the matters addressed, provided that it is still in force and circumstances have not changed. Its effect only takes place within the framework of the subsequent building permit process.

4. A preliminary decision has the same validity period as a building permit.

Building Permit - Building Permit Procedure - Notification and Building Permit Procedure

**1. If a construction project is subject to the notification procedure, the applicant shall submit the prescribed documents to the competent authority within the notification period. If no notification period is specified, the notification must be submitted at least 30 days prior to the commencement of the work. The notification may be submitted at the option of the notifying party in paper form or in digital format via the platform.**

**2. If the competent authority determines that the conditions for the notification procedure are not met, it shall inform the applicant before the commencement of the work. Upon the applicant's request, it shall issue a decision stating that the project is subject to a construction permit requirement.**

**3. If the competent authority does not contact the applicant before the commencement of construction, this silence shall be deemed equivalent to a decision stating that the conditions for the notification procedure are fulfilled.**

**4. Reserved are the imposed conditions and the obtaining of further permits required under other laws, notably the permit for water extraction or the drilling permit.**

Building Permit - Building Permit Procedure - Notification and Building Permit Procedure

1. The applicant initiates the procedure by submitting a building application to the competent authority.

2. Applications that fall under the jurisdiction of a municipal council in a municipality that has opted out of using the platform must be submitted in paper form to that municipality.

3. The application must contain all the information and documentation necessary for its examination, as well as for the examination of further required permit applications.

4. If exceptions are necessary for the construction project, the justified request for exception must be attached to the building application.

5. The building application must be signed by hand (paper format) or validated (digital format) by the plan author, the property owner, and the applicant or their contractor. In the case of multiple owners, the approval rules are particularly governed by civil law.

6. The building application also applies to other permits required by the construction project.

7. For construction projects of public interest, the initiation of an expropriation procedure under the Expropriation Act (kEntG) replaces the signature of the property owner. The building permit depends on the legal validity of the expropriation decision.

Building Permit - Building Permit Procedure - Notification and Building Permit Procedure

**1.** Building applications that, due to legal provisions, mandatorily require consultation with an affected cantonal authority must be transmitted from the municipality to the ISBB on the platform, provided the dossier contains all documents necessary for consultation with the affected authorities, regardless of the format chosen for the procedure. Afterward, the ISBB consults exclusively with those cantonal authorities that are mandatory to consult.

**2.** The municipality is free to request additional preliminary opinions from cantonal authorities via the ISBB.

**3.** The building dossiers can be transmitted to the ISBB during the public disclosure period.

**4.** The preliminary opinions of the cantonal authorities, which relate to the application of mandatory special statutory provisions, must be justified and include the legal provisions on which they are based.

**5.** In consultation cases, the ISBB must inform the municipal council of the results of the cantonal authorities' positions within 30 days of receiving the complete building dossier. If this period needs to be extended for compelling reasons, the parties must be notified of this extension, including the reasons. The period can only be extended once. Upon expiration of the extended period, the positions of the authorities that have not yet given a preliminary opinion are deemed positive.

Building Permit - Building Permit Procedure - Notification and Building Permit Procedure

1. Except for minor constructions and facilities, the construction plans must have been prepared

a) by a holder of a Bachelor's degree or higher qualification in the technical field relevant to the construction project, issued by a Swiss Federal Institute of Technology, a Swiss university, a Swiss university of applied sciences, or a school classified as equivalent;

b) by a holder of a diploma from a Higher Technical School (HF) in the technical field relevant to the construction project;

c) by a holder of a Swiss federal master craftsman's diploma or a Swiss federal professional certificate, who is active in the technical field relevant to the construction project;

d) by a person registered in the professional register REG A, B, or C in the technical field relevant to the construction project.

2. The term "minor" and the criteria for equivalence are defined in the BauV (Building Ordinance).

Building Permit - Building Permit Procedure - Notification and Building Permit Procedure

1. The processing of a building application may be suspended, even if the construction project appears to comply with the law, if it conflicts with a planned change to the zoning plan or change to the building zone regulation (BZR).

2. A suspension is only permissible if the municipal council has at least made the final decision to undertake such a change.

3. The suspension remains in effect if the public notice of the change is issued within 12 months of the announcement of the suspension. The suspension can last up to a maximum of 24 months.

Building Permit - Building Permit Procedure - Publication and Public Display

1. All construction projects requiring a permit shall be publicly displayed by the competent authority no later than 30 days after receipt of the applicant's complete dossier.

2. The public display is carried out by publication in the Official Gazette.

3. For minor works and project modifications that do not affect the interests of third parties, a public display may be waived. The applicant shall be notified of the waiver of the public display.

Building Permit - Building Permit Procedure - Publication and Public Display

1. The Publication of the Public Notice in the Official Gazette must mandatorily and exclusively include

a) the name and first name or the company name of the applicant and the planner;

b) the exact designation of the construction parcel (number, plan, and place name, if applicable area), the coordinates of the topographic map, the name and first name or the company name of the property owner, as well as the type of construction project;

c) the usage zone and, if applicable, the reference to applicable special building regulations for detailed use or district plans;

d) where applicable, the indication that the construction project requires exceptions under the applicable legislation;

e) the method of accessing the construction application dossier and the possibility of objection, including the deadline for objections;

f) where applicable, the note that an environmental impact report exists and can be accessed in the same manner.

2. The competent authority ensures that only the information mentioned in paragraph 1 is published in the Official Gazette.

Building Permit - Building Permit Procedure - Publication and Public Display

**1. The Building Application, the associated plans, and other documents can be inspected by any person interested in the construction project during the objection period at the competent authority. Building applications under the jurisdiction of the KBK can also be inspected at the municipal administration. Interested persons may obtain a copy of the publicly disclosed documents for a corresponding fee.**

**2. If the digital format is used, inspection by interested persons is carried out using the dossier code published at the public disclosure.**

**3. The accessible information about natural or legal persons is limited to the name and first name or the company, subject to other data required for verifying conditions set out in other laws. The competent authority ensures that only this data can be accessed.**

**4. The handling of publicly disclosed documents, regardless of the means and procedure used, may only be conducted for the purpose of enabling interested persons to verify their right of objection and, if necessary, to lodge an objection.**

Building Permit - Building Permit Procedure - Objection

1. The following are entitled to lodge an objection

a) Persons who are directly affected by the construction project in their own legally protected interests;

b) Any other natural or legal person who is authorized by law to lodge an objection.

Building Permit - Building Permit Procedure - Objection

1. The objection period is 30 days and begins with the publication in the official gazette.

2. With the objection, only the violation of public law provisions can be asserted.

Building Permit - Building Permit Procedure - Objection

1. Objections must particularly be substantiated concerning the right to object.

2. Objections must be submitted in writing, either in digital format or paper format, to the authority designated as competent in the publication.

3. In building permit procedures initiated by the applicant on the platform, the objection must be signed by hand if the objector chooses the paper format, and with a qualified electronic signature if the digital format is chosen. Once the choice is made, the objection and all associated notifications, statements, and other communications concerning the objector, extending to the archiving of the dossier, must occur in the chosen format. In exceptional cases, the authority may approve a change of format upon a substantiated request.

4. An objection to a construction project submitted by the applicant in paper format must necessarily be in paper format.

5. If the digital format is used and the objection is raised in paper format, the competent authority will digitize the objection and record it on the platform. The same applies to all other documents received by the competent authority in paper format.

6. For joint objections, a representative must be appointed. If no representative is designated, the first signatory in paper format is considered the representative; in digital format, the representative is deemed to be the one who first signed the objection with a qualified electronic signature.

Building Permit - Building Permit Procedure - Objection

1. The purpose of legal reservation is to inform the petitioner and the authority about private rights affected by the construction project and any potential claims for compensation.

2. Anyone who is legally competent under civil law is entitled to file a legal reservation within the objection period.

3. The competent authority acknowledges the legal reservation and includes it in its final decision. Those declaring a legal reservation are not party to the proceedings.

Building Permit - Building Permit Procedure - Objection

1. If objections have been filed against the building application, the competent authority may summon the parties to a conciliation hearing. It may also do so in the case of legal reservations.

2. A record may be kept of the outcome of the hearing and the unresolved objections.

1. Building Permit - Building Permit Process - Construction Decision

1. The building decision includes the assessment of the building application, the associated requests for exceptions, and any unresolved objections.

2. The building decision may include conditions and stipulations that can be ordered to be noted in the land register. The same rules apply analogously to the building police procedure.

3. For buildings and facilities specifically constructed for the purpose of a particular activity, and whose removal is justified upon the termination of that activity, particularly for special agricultural, commercial, or industrial buildings and facilities, the competent authority may require in the building permit that the building or facility must be removed after the activity has ended. To ensure the removal of the building or facility, the competent authority may also require the applicant, before granting the permit, to provide the necessary security in the form of a guarantee or a mortgage. The competent authority may also demand this in cases where special circumstances justify it, particularly if the building or facility is erected on another building or facility whose long-term existence is unlikely.

4. Simultaneously with the building decision, the authority responsible for the relevant procedure must issue the affected parties with the further necessary permits in the format used for the building permit procedure, unless provisions of special legislation oppose this. The cantonal special permits form an integral part of the KBK's building decision.

5. The municipalities render their decision within 8 weeks from the end of the public notice period or, if applicable, from receipt of the complete building dossier, which includes in particular the building application dossier submitted by the applicant, the preliminary opinions of the consulted bodies, and special documents.

6. In cases where a concession has been granted by the property owner, the building permit authority must immediately forward a copy of its decision to the concession authority.

1. Building Permit - Building Permit Process - Construction Decision

1. The building permit expires if construction of the project has not commenced within 3 years from the date it becomes legally effective. Construction is considered to have started as soon as significant work has been carried out, particularly when earthworks have been completed or when a significant excavation necessary for the project has been undertaken. In any case, the execution of the construction project is considered to have begun when the foundation consoles or the base slab have been constructed.

2. The period does not commence or is suspended if the building permit cannot be used for legal reasons and the holder of the building permit immediately takes the necessary steps to remove the obstacles preventing execution.

3. The competent building permit authority may extend the validity of a building permit for a maximum of 3 years for important reasons. An extension is excluded if the factual or legal conditions relevant at the time of the construction decision have changed.

1. Building Permit - Building Permit Process - Construction Decision

1. The holder of a building permit or his representative is obligated

a) to affix a certificate of the building permit at the entrance of the construction site at their own expense for the duration of the construction work, if the competent authority requires this in the building permit;

b) to notify the competent authority of the commencement and completion of the construction work. The obligation to notify other authorities, particularly the office responsible for civil protection, remains reserved.

2. These obligations are listed as conditions in the building permit.

Building Permit - Building Permit Procedure - Appeal

1. Decisions may be appealed within 30 days of their issuance by means of a written and substantiated complaint to the Council of State, and decisions of the KBK may be appealed by means of a written and substantiated complaint to the Cantonal Court. Interlocutory decisions can only be appealed if they may cause irreparable harm.

2. The complaint does not have a suspensive effect; however, this may be ordered ex officio or upon request.

3. The request for the granting of suspensive effect must be submitted within a period of 10 days. Construction work must not commence until the final decision on the request concerning suspensive effect has been made. The decision on the suspensive effect must be rendered within a period of 3 months from the receipt of the request.

4. The suspensive effect of a complaint is withdrawn upon application, provided that the developer is bound, in the event of the complaint being upheld, to restore the original condition and to provide security for the estimated costs of this restoration (e.g., bank guarantee) beforehand.

5. The holder of a permit for the complete or partial demolition of a building may only make use of it once it is legally binding.

6. With the exception of decisions regarding suspensive effect and any precautionary measures, construction policing during the appeal process remains the responsibility of the first-instance authority.

7. If the suspensive effect has been ordered at the request of the complainant, the provision of security for procedural costs and potential party compensation is required from the complainant. If the securities are not provided within the deadline set by the competent authority, the ordered suspensive effect becomes void.

Building Permit - Building Permit Procedure - Appeal

1. The appellant is required to compensate for the damage caused by the request for suspensive effect in accordance with civil law provisions if they have acted fraudulently or with gross negligence.

Building Police

1. The Building Police is the responsibility of the competent building permit authority.

2. The bodies of the Building Police take all measures necessary for the application of the present law within the scope of their jurisdiction.

Building Police

1. The responsibilities of the building police authorities include, in particular

a) the order to restore the lawful condition in cases of illegal construction execution or subsequent disregard of construction regulations, conditions, and requirements;

b) the order to eliminate disturbances of public order caused by unfinished, poorly maintained, or otherwise non-compliant buildings and facilities;

c) the granting, refusal, or revocation of residential or usage permits;

d) the drafting of a protocol regarding the committed offenses.

2. To establish the facts, the building police authorities are specifically authorized to

a) conduct hearings;

b) enter properties, inspect construction sites, premises, and other facilities;

c) request all information and necessary documents regarding ongoing works and past records about the object from the questioned individuals, current or previous owners, or third-party authorities;

d) carry out or have carried out surveys, core drillings, or analyses.

3. Municipal employees and the employees of the Canton of Valais, who are appointed for this purpose by the municipal council or the state council respectively, are obliged to inform the KBK of all construction works on objects located outside building zones that are executed without a construction permit, in violation of the granted permit, or in breach of other regulations. The same obligations apply to individuals who are members of the authorized building permit authority. The intervention costs of the municipalities will be charged to the Canton.

Building Police

**1. If construction work is carried out without a building permit, or deviates from an issued building permit, or if regulations are violated during the execution of an approved project, the competent authority orders the complete or partial cessation of construction work and ensures compliance with regulations.**

**2. If circumstances require, particularly in the absence of residential or usage permits, or for safety or environmental protection reasons, the authority may issue a complete or partial prohibition of the occupancy or use of the buildings and facilities.**

**3. Other authorities of the building police, notably building police inspectors who are subordinate to the competent authority, can also order the cessation of work and, in cases of immediate danger to the safety of people, animals, or the environment, prohibit the occupancy or use.**

**4. These orders are immediately enforceable, and an appeal against them does not have a suspensive effect. The competent authority may request their annotation in the land register.**

Building Police

1. If a construction project is carried out without a building permit or deviates from an issued building permit, or if regulations are violated during the execution of an approved project, the competent authority shall set a reasonable deadline for the disruptor (status disruptor and/or conduct disruptor) to submit a statement regarding the executed construction works.

2. If legalization of the structure is not excluded from the outset, the authority shall grant a reasonable period for submitting a building application to legalize the executed works. If no application is submitted within the granted period, the authority shall issue an order to restore the lawful condition.

3. If it is clearly obvious from the outset that legalization of the structure is excluded, the competent authority shall issue an order to restore the lawful condition. This order must include the precise designation of the measures to be taken to achieve the lawful condition, the deadline for implementation, the threat of substitute performance by the authorities in the event of non-compliance, and information on the right to appeal. The competent authority may request its entry in the land register.

4. After a period of 10 years since the illegality became apparent, the restoration of the lawful condition can only be required if compelling public interests demand it. The absolute statute of limitations is 20 years after the completion of the construction works.

5. Outside of the construction zone, the federal legal regulations and conditions for the restoration of the original state apply.

Building Police

1. The landscape, environment, local image, safety, and health of persons, as well as significant assets, must not be adversely affected by unfinished, poorly maintained, damaged, or non-compliant buildings and structures.

2. Buildings placed under protection based on planning legislation must be maintained in such a way that their eligibility for protection is ensured. The regulations concerning the maintenance obligation for buildings placed under protection due to special legislation remain reserved.

3. Anyone who disrupts public order in the aforementioned manner or neglects the maintenance of a protected building is to be prompted by the building police authority to rectify the disturbance within a reasonable period. If the offender is unknown, the request is to be addressed to the owner of the property from which the disturbance originates.

Building Police

1. If buildings and facilities are no longer used or operated and there is a prevailing public interest in their removal for reasons of landscape conservation, spatial planning, environmental protection, health, or safety, the building police authority may require the owner, construction permit holder, or any other person who has or had control over the building or facility to provide a security deposit in an appropriate form (personal securities, real securities, other securities) to cover the costs for the removal of the building or facility and the complete restoration of the original condition as well as to cover the costs of any potential substitute performance.

2. Before the authority orders the provision of security, it sets a reasonable deadline for comments on the nature, extent, and modalities of the security. The amount of security is determined taking into account the nature, effort, and peculiarities of the work to be carried out. The authority and the recipient of the order may agree on the conditions of the security, so that it does not have to be ordered.

3. If the conditions of paragraph 1 are met, the building police authority sets a reasonable deadline for the removal of the building or facility and the restoration of the original condition, under threat of substitute performance.

4. Decisions regarding the security deposits as well as the removal of the building or facility and the restoration of the original condition can also be made even if this is not mentioned in the building permit.

5. The sale or partition of a property for which a measure according to this article has been ordered by an authority must be approved by this authority. The competent authority registers a note in the land register stating that the property is encumbered with a measure according to this article.

Building Police

1. Orders pursuant to the articles of this title, which are immediately enforceable or final, shall be enforced by compulsion by the competent authority if the obligor fails to comply with the orders despite the threat of substitute performance.

2. If there is an immediate and serious danger to persons or significant property values or the risk of serious environmental impairment, the competent authority shall act without further procedure. If the authority undertakes measures requiring approval, such measures shall be subject to a subsequent approval procedure.

3. The costs of the substitute performance shall be borne by the obligor. The executing public authority shall have a statutory lien for claims and interest, taking precedence over any other liens on the property, which shall be valid without requiring an entry in the land registry.

4. The competent authority may request the assistance of the cantonal police when circumstances require, particularly to prevent a threat to public order or to ensure the safety of those involved.

Building Police

1. The construction police authorities shall send their initial correspondence in paper format to the disturber. If the use of the platform is offered, the construction police authorities shall set a deadline for the disturber to indicate whether the procedure should be conducted in paper format or digital format. If the disturber does not respond within the set deadline, the paper format shall be used.

2. Until the disturber has chosen the procedural format, the construction police authorities may carry out their actions in paper format.

3. Once the chosen format for the procedure has been determined, the procedure shall continue in this format until the dossier is archived. In exceptional cases, the authority may agree to a change of format upon a well-founded request.

4. Moreover, the provisions applicable to the building permit procedure from the present law and its regulation shall apply mutatis mutandis to construction police procedures, insofar as this present law and its regulation do not provide otherwise.

Criminal Provisions

1. A fine ranging from 1,000 to 100,000 francs shall be imposed by the competent authority on

a) anyone who, as a responsible party (in particular as an owner, applicant, project manager, principal, architect, engineer, construction manager, or contractor), conducts or orders construction work without possessing a building permit, whose building permit has not yet become legally binding, who fails to notify the competent authority of the commencement and completion of the construction work, who does not comply with the conditions and requirements of the granted building permit, who applies for a building permit based on inaccurate information, who occupies, rents, or uses a building or facility without an occupancy or use permit, who does not comply with building police orders issued against them;

b) anyone who fails to fulfill an obligation imposed on them by this law;

c) anyone who in any other manner violates the provisions of this law or its implementing regulations.

2. In minor cases, the fine may be reduced.

3. In severe cases, particularly when carrying out construction projects despite a legally binding construction ban, violations of regulations out of greed, in cases of recurrence, or in cases of irreparable damage, the fine may be increased up to 500,000 francs. Illegitimate profits shall be confiscated. If the profits are no longer available or can only be confiscated with significant effort, for example, if transferred abroad, the competent authority shall issue a substitute claim. The provisions of the Swiss Penal Code apply accordingly to the confiscation of profits and the substitute claim.

4. A fine of at least 10,000 francs shall be imposed on anyone who continues construction work or continues to use buildings and facilities despite being served with a work suspension or occupancy or usage prohibition.

5. If a restoration order is not complied with within the granted period, the competent authority shall impose a fine. If the competent authority decides, as an exception, to grant an additional deadline, despite non-compliance, the fine shall increase with each further granted deadline.

6. Stricter penal provisions under other legislations remain reserved.

7. If the authority determines that a possible criminal offense, prosecuted by another authority, has been committed, it shall report the case to that authority and transmit the information from its files to them.

Criminal Provisions

1. Prosecution is time-barred 7 years after the commission of the offense. The limitation period does not run during a suspension of the proceedings requested by the person concerned.

2. The penalty is time-barred after 3 years. The limitation period begins as soon as the criminal decision is final and enforceable.

Criminal Provisions

1. Fines up to 5,000 francs are to be assessed based on the severity of the offense and the degree of fault; other grounds for sentencing need not be considered by the competent authority.

2. If an offense is committed during the management of a legal entity, general or limited partnership, sole proprietorship, or an entity without legal personality, or otherwise in the performance of business or official duties for a third party, the authority may sentence that entity to pay the fine and confiscate the illegal profits or oblige it to a substitute claim.

3. The state, represented by the Council of State, and the municipalities may exercise party rights in criminal proceedings. They are authorized to file complaints or appeals concerning the point of guilt, the type of penalty, or the severity of the penalty.

4. If this law does not contain specific provisions, the federal and cantonal criminal legislation shall apply.

**1. Supervision**

1. The State Council exercises, through the competent department, the supreme supervision in public building law.

2. It may delegate the investigation or specific investigative tasks to the service or to an ad hoc working group appointed by it.

3. If a competent building authority allows a situation to persist that poses a danger to the physical integrity or health of individuals or a serious threat to the environment, the service may order the necessary precautionary measures. Its decision is promptly communicated to the supervisory authority for confirmation. The supervisory authority may revoke the service's decision in whole or in part within 30 days.

**1. Supervision**

1. If the supervisory authority becomes aware of a situation that may fall within its jurisdiction, it requests the affected competent authority to provide a statement and sets a deadline for their response before initiating a supervisory procedure.

2. The supervisory authority may suspend the initiation of a supervisory procedure and request updates on the development of the situation. It may recommend measures to the affected competent authority that it deems appropriate. These recommendations are not binding for the affected competent authority.

3. If it becomes apparent that the matter does not fall within the jurisdiction of the supervisory authority, it refrains from initiating a procedure and closes the case. It informs the affected competent authority thereof. In clear cases, it may also refrain from opening a procedure and close the case without first hearing the affected competent authority.

**1. Supervision**

1. If there is suspicion that a competent authority is neglecting its duties in the area of public building law, evading its legal obligations, violating the relevant statutory provisions, or not responding to inquiries from the supervisory authority or only responding incompletely, the supervisory authority shall formally initiate proceedings and inform the relevant competent authority accordingly.

2. Subject to the provisions of this chapter, the procedure pursuant to the Municipal Act (GemG) shall apply accordingly.

**1. Supervision**

1. All costs incurred as a result of the supervisory procedure shall be borne by the supervised authority, provided that misconduct has been determined.

**Costs and Party Compensation**

1. Municipalities, the KBK, and the ISBB impose separate fees for their activities in the building permit procedure. These fees include charges and expenses, including the costs for expert opinions.

2. The costs imposed by the KBK and the ISBB are determined by a resolution of the State Council. The costs imposed by the municipalities are determined by a tariff decided upon by the competent municipal council. The fees can range from a minimum of 100 Swiss Francs to a maximum of 4,000 Swiss Francs per processed dossier and per granted building permit. For complex dossiers, namely those that require a deforestation permit, an expert opinion, or an environmental impact assessment, the amount can be increased to a maximum of 15,000 Swiss Francs.

3. Furthermore, the costs and party compensations are regulated in the VVRG and in the Act concerning the Tariff of Costs and Compensations before Judicial or Administrative Authorities (GTar).

**Costs and Party Compensation**

1. The applicant bears the costs for the issuance or refusal of the building permit.

2. The costs may be imposed on the objector if they have caused costs through clearly unfounded objections or if they are clearly not entitled to object.

**Costs and Party Compensation**

1. The competent authority may at any time require the applicant to provide a reasonable advance on costs, setting a reasonable deadline and indicating that failure to do so will result in the construction application not being processed.

2. If an objection appears to be clearly unfounded or if the objector clearly lacks the legal standing to object, the authority shall inform the objector and require an advance on costs from them.

Final Provision

1. The State Council shall issue the regulations necessary for the implementation of the present law, which are to be submitted to the Grand Council for approval.

2. The Construction Ordinance (BauV) particularly regulates

a) the application of building law provisions in special cases;

b) the building permit procedure, particularly the building application, the documents to be submitted, the preliminary examination, and the notification of decisions;

c) the organization and tasks of the Building Control Commission (KBK), the Institute for Building and Building Management (ISBB), and the Building Classification Committee (SKBK), including the decision-making authority of the president of the KBK in cases of minor importance;

d) the building police;

e) the validity, duration, and extension of the building permit as well as the commencement of construction.