Legislator Case Law & Legislation
931.15 LCAR CH-VD

Art. 8 Act on Quarries (LCar)

Chapter III, Section I
Open official source Full Act (36 Articles) Machine-readable Markdown (.md)

Art. 8 LCar

1. The implementing regulation [G] of the law sets the content of the extraction plans, which shall include the following elements

a. the delimitation of the perimeter of the extraction zone and the areas suitable for extraction;

b. land use (housing, roads, etc.);

c. geological data attesting to the presence of materials, their quality, and approximate quantity;

d. data relating to surface or groundwater and soil quality;

e. the land to be exploited as a priority and the planned exploitation stages;

f. the maximum anticipated depth and the exploitation methods;

g. the general circulation plan, the road sections for which participation from the owner and operator is envisaged. This participation is set at the cost of the works necessitated by increased use. It is due for improvement, maintenance, or repair works;

h. the method of material processing and the location of the necessary installations;

i. the particular precautions to be observed;

j. the exploitation program and its probable duration;

k. the foreseeable environmental impact and the necessary protection measures;

l. the future land use, suspended until the end of exploitation, and the restoration in accordance with this use;

m. the final state of the land and the restoration works.

← Art. 7 LCar Act on Quarries (LCar) Art. 9 LCar →

Need to analyze how this provision applies to your matter?

Cross-reference this statute against case law, commentaries, and related legislative provisions inside Legislator AI.

Open in Legislator →

Court Decisions Applying This Provision (4)

AC.2011.0281 · vd (art. 8 let. j LCar)
Quarry Safety Works Authorization and Forest Clearance on Inventoried Land
The duration of the extraction program for the security and remediation work is fixed based on this provision.
AC.2004.0256 · vd (art. 8 let. f LCar)
Appeal Against Gravel Pit Extraction Approval Due to Flawed Hydrogeological Study and Contravention of Classification Decree
Cited in the reasoning (point 7.c) as the legal provision requiring the extraction plan to mention the maximum depth, which was not reliably determined, leading to the annulment.
AC.2001.0135 · vd (art. 8 let. f LCar)
Gravel Pit Extension Over Groundwater Protection and Noise Concerns
Cited as the provision requiring the extraction plan to indicate the maximum depth, which was not respected by the insufficiently detailed operating base map.
AC.1995.0134 · vd (Art. 8 LCar)
Municipality v. Department on Zoning Plan Adequacy for Gravel Extraction
The main ground for upholding the prior decision was that the communal plan did not contain the elements required by this article for a gravel pit zone.