Implementing Regulation of the Act of 5 September 1944 on the Use of Public Domain Lakes and Watercourses and of the Act of 12 May 1948 Regulating the Occupation and Exploitation of Groundwater within the Cantonal Public Domain (RLLC) - Reservation of Legal Provisions (GMBHV)
Table of Provisions (84)
Statutory Text (84 Articles)
1. This regulation is applicable subject to federal laws and their implementing ordinances, particularly concerning the use of hydraulic forces, fishing, navigation, water police, electrical installations, hygiene, as well as cantonal laws and regulations regarding the use of lakes and watercourses, groundwater, footpaths, constructions, electrical and industrial installations, fishing, water police, protection of waters against pollution, navigation.
1. In these Regulations
- "user" generally refers to the mill owner, the holder of a perpetual, fixed-term, or revocable concession, as well as anyone practicing irrigation;
- "applicant", the person requesting a concession;
- "concessionaire", the holder of a concession of any nature whatsoever;
- "Department", the Department of Security and Environment;
- LUFH: the Federal Act on the Use of Hydraulic Power [A];
- LVU: the Vaud Act on the Use of Lakes and Watercourses [E];
- LVES: the Vaud Act on Groundwater [F].
1. Any permanent structure established on public property under a concession remains accessible to the public.
2. As an exception, the concession may stipulate a prohibition of access or specific use, which must be displayed, at the concessionaire's diligence, at the municipality's notice board and on the structure it must protect. Anyone who violates this prohibition is subject to a fine of up to 30 francs, a penalty that may be doubled in case of a repeat offense. Prosecution occurs only upon the concessionaire's complaint and is governed by the law on contraventions [I].
3. For properties that are part of the public domain and included in the concession's perimeter, paragraphs 1 and 2 of this article apply by analogy.
1. Access to any light structure within the meaning of Article 677 of the Swiss Civil Code [J] established on public domain by virtue of an authorization or a concession is prohibited to the public unless the owner of such structure allows it under his sole responsibility.
2. The prohibition of access is displayed, at the diligence of the owner of the structure, on the municipal board and on the structure it is intended to protect. Any person who contravenes this prohibition is liable to a fine of a maximum of 30 francs, which may be doubled in the case of a repeat offense. Prosecution only occurs upon the complaint of the owner. It is governed by the Law on Misdemeanors [I].
3. The lands that are part of the public domain and included in the perimeter of the authorization or concession remain accessible to the public. Exceptionally, the authorization or concession may stipulate a prohibition of access or specific usage; in such cases, Article 3a, paragraph 2 of this regulation is applicable by analogy.
1. The beauty of sites must be preserved. It must be maintained intact if a major public interest requires it (LUFH, art. 22) [A].
1. The user is required to establish at their own expense all necessary installations for the protection of fisheries (fish ladders, grids, sanctuaries, etc.) and, if necessary, to modify or complete them (See LUFH, art. 23) [A].
1. If these installations prove to be impractical or too costly, the user may be exempted from establishing them by providing an annual quota of young trout or another service determined by the fisheries department.
1. The user must continuously allow the necessary amount of water to flow out from the intake to maintain the existence of fish in the section of the watercourse being used, as well as to supply the fish ladders.
1. In watercourses where trout live, no dredging may be carried out during the period set by the annual decree on fishing activities.
1. Any drainage of a watercourse, millrace, pond, etc., must be authorized by the prefect, with a request submitted at least forty-eight hours in advance.
2. In case of emergency (accident), authorization can be granted by the gendarmerie.
3. All measures must be taken, at the user's expense, to collect the fish.
1. Users and residents are required to provide free access to their facilities to cantonal and federal officials responsible for water, fishing, and navigation policing, as well as the hydrometric service (See LUFH, art. 30) [A].
1. For all taxes and fees due pursuant to Articles 13 and 27 of the LVU [E], the State benefits from the legal mortgage provided for in Article 188 of the Act introducing the Swiss Civil Code (LVU, art. 30).
1. The concession tax is due upon the granting of the concession. It remains payable to the State, even if the granted concession is not used.
2. The annual fee must be paid to the collector by May 31. In case of delay, late interest is owed at the rate set by the annual tax law [K].
3. If the tax or the annual fee is not paid after a formal demand, the concession may be revoked.
1. The application must be submitted to the department, accompanied by the preliminary draft of the proposed works.
2. It must indicate
a. the full name, parentage, domicile, and origin of the applicant. If the applicant is a legal entity, its corporate name and registered office, as well as the names, domiciles, and origins of the administrators;
b. the section of the watercourse to be exploited, the fall, the flow rate, the usable power, the mode of exploitation, and the use of the energy.
1. The preliminary draft, submitted in triplicate, comprises
a. a map at 1:25,000 or 1:50,000 showing in vermillion the general layout of the fall;
b. a general plan extracted from the cadastral map, drawn up by an official surveyor, showing the projected works (1:1000, 1:2000 or 1:5000);
c. a general longitudinal profile, at the same scale for lengths;
d. characteristic cross-sections at 1:100 or 1:200;
e. the drawings of the dams, walls, spillways, reservoirs, aqueducts, galleries, and the plant;
f. a descriptive report with the financial plan of the undertaking.
2. All documents, prepared on the basis of the administration's model plans, in A4 format (21 x 29.7 cm), are dated and bear the signatures of the project author and the applicant; each copy is inserted into a separate folder, with a list of documents.
1. The elevation levels of the project are linked to the cantonal or federal topographic leveling (R.P.N. 373.60 m).
1. If no public interest reasons oppose the granting of the concession, the department forwards the application to the competent Federal Department with the explanatory report required by the federal authority.
1. If the federal authority does not oppose the granting of the concession, the application and the accompanying preliminary project are submitted for public inquiry at the prefecture.
2. The department sets the duration of the inquiry, which is between 30 to 60 days.
3. The submission is made public by publication in the "Official Gazette of the Canton of Vaud" and by posting on the public notice boards of the concerned municipalities.
4. The public notice invites interested third parties to submit their reasons for opposition to the prefecture in writing, within the specified deadline.
5. Upon the expiration of the deadline, the inquiry file is returned to the department with the interventions.
6. The department may open the inquiry during the federal authority's examination of the file; the decision of the latter is reserved.
1. If the department deems it necessary to conduct an expert examination, it appoints at least two experts for this purpose to examine the oppositions.
2. The experts send a written report to the department, which is not obliged to communicate it to the parties concerned.
1. The costs of investigation, expertise, and other expenses shall be borne by the applicant.
2. The applicant is required to secure the payment of these costs by a prior deposit, the amount of which is determined by the department.
3. If the required deposit is not made within the specified time limit, the application will not be considered.
1. The concession is granted by the department that decides on objections not within the jurisdiction of the courts.
1. The concession deed must state
a. the name, domicile, and nationality of the concessionaire; if it is a legal entity, the corporate name and registered office;
b. the name of the watercourse or lake;
c. the applicable legal provisions;
d. the reservation of third-party rights;
e. the duration of the concession;
f. the obligations of the concessionaire, such as concession taxes and royalties, supply of water or energy, etc.;
g. the deadlines for commencing work and commissioning the plant;
h. the technical description of the hydraulic installations, the scope of the granted right, i.e., the theoretical head, the usable flow rate, as well as the method of using the power;
i. the provisions relating to the protection of sites, fishing, navigation, and hydrometry.
j. Concessions exceeding 50 HP also contain provisions on
k. the right of reversion and the right of repurchase by the State and, where applicable, the assignment of these rights by the State;
l. the State's participation in profits and the controls it entails;
m. the State's participation in the administration of the enterprise;
n. the justification of the construction capital, the establishment of construction and operating accounts, and their depreciation rates; the determination of the original value of the installations;
o. ...
p. ...
q. the concessionaire's participation in the costs of correction and maintenance of the watercourse;
r. ...
s. the obligation to maintain in good condition the installations subject to the right of reversion and the right of repurchase.
1. The concession is deemed accepted if the concessionaire does not present any observations within thirty days of receiving the concession deed.
1. Before the commencement of the work, the final project is subjected to a public inquiry for thirty days at the municipal registry of the concerned municipality.
2. If the inquiry concerns the territory of multiple municipalities, it takes place at the prefecture.
3. The department rules on the objections, subject to the rights of third parties.
1. Plans for dams must be accompanied by static calculations and geological reports.
1. The works must be commenced on the date set by the granting authority and completed within the time frame specified by the concession act, under penalty of revocation of the concession.
2. Upon a justified request, these time frames may be extended by the department.
1. The concessionaire is solely responsible, fully exonerating the State, for any damage that the works may cause to the public domain or to the property of third parties.
1. The works are carried out under the supervision of the department, which orders all measures it deems necessary for public safety.
2. They must be executed in accordance with industry standards, the concession agreement, and the plans attached thereto.
3. In the event of defective execution or non-compliance with the plans and conditions, the department orders the appropriate measures and, if necessary, executes them at the concessionaire's expense.
1. If changes made to the project are of a nature that may interest third parties or necessitate a modification of the concession, these changes shall be subject to a public inquiry of at least ten days in the manner provided for in Article 23 above.
1. The concessionaire may be required to establish, maintain, and service the facilities necessary for measuring the levels and flow rates of the water in the canals and downstream of the dam. (See LUFH, art. 29) [A].
2. The department prescribes the facilities to be set up in each case.
3. The observations are recorded in specially designated notebooks and are provided to the department free of charge.
1. To allow for the inspection of hydraulic installations, each fall is equipped, at the expense of the concessionaire, with metal markers connected to the cantonal or federal leveling system.
2. The department may exempt factories located near an existing marker or too distant to be connected without excessive costs from this obligation.
3. The concessionaire is responsible for the maintenance of the markers and bears the costs of replacing and leveling those that are destroyed or damaged.
4. The department issues detailed regulations concerning the provision, installation, and leveling of the markers.
1. The concessionaire must comply with federal and cantonal regulations on water policing and carry out, at their own expense, the measures imposed for this purpose.
2. No materials (excavated material, debris, etc.) may be deposited in the beds of lakes and watercourses or in their immediate vicinity without the department's authorization.
1. Water cannot be used in a manner or for a purpose other than those provided for in the concession without the authorization of the department.
1. Unless otherwise provided by the concession, it is prohibited to obstruct the free flow of water. For this purpose, spillways must be arranged on the canals or near the engines, so that the stoppage of the plant does not prejudice other users.
2. If it can be done without excessive maneuvers, the concessionaire must allow the waters to flow into the watercourse during extended stoppages of the plant (weekends, holidays, etc.).
3. The concessionaire must inform the police in advance of any operations involving the bottom gates, purge, or other sluices likely to cause significant disruption to the flow of the watercourse.
1. Independently of the perimeter contributions that may be imposed on it under the Water Police Law, the concessionaire may be required to contribute through a special contribution to the works of correction and maintenance of the section of the watercourse granted.
2. This special contribution shall not exceed 25% of the cost of the works, after deduction of federal and cantonal subsidies.
1. The plant may only be put into service after inspection of the works by the department (See LVU, Art. 12) [E].
1. The diversion channel must be equipped, at its origin, with a bridge ensuring free passage along the watercourse.
2. The paths constructed by the concessionaire are available for public use as long as the operation of the concession allows it.
1. After dismantling and removing all the construction site installations, the areas affected by the work must be leveled, seeded, or reforested.
1. Upon the completion of the works, the concessionaire shall submit to the department, in two copies, the dossier containing the finalized and permanently affixed execution plans.
2. The descriptions provided in the concession document are supplemented or modified as necessary.
1. The concession holder may be required to demarcate the land on which its facilities are located.
2. The riparian area submerged by the backflow of water at the maximum retention level of the dam, increased by a safety margin set by the department, is ceded free of charge to the State, free of any encumbrances, to be incorporated into the public domain.
3. A copy of the demarcation plans, certified as accurate by an official surveyor, is provided free of charge to the department.
1. If the construction of the concessionaire's works requires the establishment of superficies rights over property belonging to public domain or state holdings, the perimetric contributions resulting from the Water Police Law [L], which affect the plots encumbered by the superficies rights, shall be borne by the concessionaire.
1. It is prohibited to introduce sewage or other wastewater into millraces without prior authorization from the department.
2. In the event of the decommissioning of a millrace, the measures necessary to ensure the flow of pipelines discharging into it are the responsibility of their owners.
1. The concessionaire is required to constantly maintain all the works established for the utilization of the concession in perfect condition.
2. In case of negligence, Article 27, paragraph 3, is applicable by analogy. Additionally, the concession may be withdrawn.
1. The concessionaire may not, without prior authorization from the department, modify the works executed to use the concession, including hydraulic engines.
2. The request for authorization must be accompanied by the documents required by the department.
3. Article 28 applies by analogy.
1. The concession cannot be transferred without the approval of the department.
2. Approval cannot be refused if the acquirer meets all the requirements of the concession and if the transfer is not contrary to the public interest.
3. However, as a general rule, the concession for a plant that is not yet under construction cannot be transferred.
1. Subject to Article 43 LUFH [A], the transfer may be subject to new concession conditions.
1. When the factory changes ownership by way of inheritance, the heirs must request the transfer of the concession to their names by presenting the certificate of heirs along with the concession document.
2. The request for the transfer of the concession of a factory acquired for valuable consideration is submitted by the purchaser, accompanied by the concession document and an official document justifying their ownership rights (a notarized deed, a declaration from a notary or the land registry conservator, or a declaration from the competent office in the event of a forced sale).
1. Holders of distinct and permanent rights transferred ex officio (perpetual rights) are required to inform the department of any change in the ownership of the right and to provide the necessary document for updating the concessions register.
1. Any concession granted for at least thirty years may be registered in the land registry as a distinct and permanent right.
2. The registration is carried out at the request and expense of the concessionaire, upon presentation of the concession deed and the plans acknowledged as an annex and integral part thereof.
1. The registrar of the land register cannot carry out the transfer of a registered concession as a distinct and permanent right without ensuring the approval of the department.
1. If the concession agreement stipulates the reversion of the installations to the granting authority upon the expiration of the concession, the department shall request the land registry conservator to note the right of reversion on the respective land registry sheets (in the cadastre, in municipalities where the federal sheet is not in force) of the corresponding properties.
1. The annual fee is due upon the commissioning of the plant. In the event of partial commissioning before the completion of the works, the fee is charged proportionally to the actual power used.
1. For establishments that only make temporary use of force, such as beaters, oil mills, the annual fee is reduced proportionally to the time used, but by a maximum of 75%; the minimum fee is Fr. 20.- (see LVU, art. 14) [E].
1. The department may reduce the annual fee when the operation of the concession is suspended for more than one quarter due to major circumstances such as the breach of a dam, a canal, or a factory fire.
2. It is due in full upon the expiration of the deadline set for the completion of the reconstruction of the destroyed facilities.
1. Subject to five years' advance notice, the State may at any time, after a period equal to or greater than one-third of the concession's duration, but at least twenty years, repurchase the concessionaire's undertaking, against payment
a. for installations subject to the right of reversion under Article 67 lit. a) LUFH [A], of the balance of the construction account established in accordance with Article 60 hereinafter;
b. for other installations (LUFH, Article 67 lit. b)), of fair compensation determined by experts and, failing agreement, by arbitration in accordance with the Code of Civil Procedure [M]. In no case may this compensation be less than the total amount of the construction account, after deduction of agreed depreciation and the balance of the renewal fund.
1. Upon the expiration of the concession, and if it is not renewed, the State shall take possession of the enterprise
a. gratuitously for installations subject to the right of reversion under Article 67 a) LUFH [A];
b. against payment, for other installations, of compensation determined in accordance with Article 55, letter b above.
1. The State has the option to assign its right of reversion to a third party without the concessionaire being able to object.
1. In the event of redemption or upon the expiration of the concession, the concessionaire must return all the works and installations taken over by the State in good maintenance condition. Failing this, the State may withhold the cost of repairs from the compensation due to the concessionaire.
4. During the last ten years of the concession, as well as from the notification of the decision to repurchase, the concessionaire can no longer incorporate new values into the construction account without the authorization of the State. The department, in agreement with the concessionaire, determines the special amortization of these new installations. Without authorization, these values are considered as fully amortized at the time of possession by the State.
1. The State may require participation in the management of the concessionaire company by appointing directors in accordance with Articles 762 and 926 of the Code of Obligations [N].
1. The State may also require participation in the share capital of the concessionaire company.
2. It may transfer this right to the Vaud Electricity Company or to other entities under its control.
1. The concessionaire shall annually pay a share of the profit to the State once the dividend exceeds 4%.
2. This share shall be equal to 50% of the balance of the profit and loss account, after deduction of normal depreciation, as established in accordance with Article 60 above, the legal payments to the reserve fund, payments to special funds authorized by the department, and a preliminary dividend of 4%.
1. The concessionaire submits annually to the department, in two copies, the operating account, the profit and loss accounts, the balance sheet, the auditors' report, and the management report.
2. Additionally, they submit supporting documents related to depreciation, legal, statutory, and hidden reserves, as well as the allocation of profits.
1. The concessionaire must submit to any audit of the accounts and facilities by the supervisory commission or by a fiduciary designated for this purpose.
1. The concessionaire has the option to be exempted from the payment of the profit participation and the controls stipulated in Articles 63, 64, second paragraph, and 65 above by making a payment proportional to the kilowatt-hours produced by the waters of Vaud.
2. The department determines the amount and the conditions; it can modify them at any time.
1. The concessionaire may not enter into any energy sales contract with a duration exceeding twenty years or whose duration surpasses the expiration of its concession.
1. The holder of a perpetual right may not increase the gross fall height nor the flow capacity of the diversion canal as they are specified in the documents established during the prior recognition of this right by the State.
2. The holder may make any modifications to their installations intended to make the best use of the recognized fall and flow, subject to the approval of the plans by the department.
3. Any increase in the recognized fall or flow must be subject to a concession.
**1. Any person wishing to register a water right in the land register must provide at least three copies of the plans and profiles of their installations, prepared according to the model plans of the administration.**
**2. If these documents do not differ significantly from those produced during the recognition of the right, the elevations and distances resulting from the new plans are accepted for registration in the land register.**
**3. The recognitive act of the water right is prepared free of charge by the department. The costs of the plans, stamp, and registration are borne by the user.**
1. The application for concession is submitted to the department, accompanied by the project plan for the proposed works.
2. It includes the name, first name, affiliation, and domicile of the applicant; if it is a legal entity, the company name and registered office. It also specifies the lake or watercourse, as well as the purpose of the application.
1. The project, submitted in three copies, generally includes the location plan extracted from the cadastral map, drawn up by an official surveyor, as well as the sections necessary for understanding the project.
2. The department may require the provision of additional documents and the connection of the project to the general leveling.
3. …
4. If it involves water catchments, the application is submitted through the prefecture, accompanied by the documents mentioned in the "instructions on the procedure to follow to obtain the right to divert a source" [O].
5. If it involves hydrothermal pumps, the application must be accompanied by the documents required by the Federal Council circular of October 18, 1949.
1. If there is no general interest reason to refuse the request, the department submits it to an investigation lasting ten to thirty days at the municipal registry of the concerned municipality. Articles 17 and 19 above apply by analogy.
2. The department may waive the investigation for requests of minor importance.
1. The department adjudicates objections that do not fall under the jurisdiction of the courts.
1. Authorization is granted in the form of a concession whose duration does not exceed fifty years in the case of municipal installations and thirty years for private installations.
2. Except for the pond permit and the material extraction permit, the department's authorization is granted at will; it is revocable at any time.
3. Articles 21 and 22 apply by analogy.
1. The application for a vivier permit is submitted to the department or the agents designated by it.
2. The permit is annual; its cost is five francs, including the stamp.
3. Unauthorized viviers are confiscated by the gendarmerie and their contents are discharged into the watercourse.
1. Anyone who believes they are entitled to a right of extraction, within the meaning of Article 8 of the Law of May 12, 1948, on groundwater [F], is required to provide proof of this right before January 1, 1957, and to submit the supporting documents and necessary plans to the department for the establishment of the acknowledgment deed.
1. Articles 24 to 28, 31 to 33, 35, 37 to 40, 42, 43, the first paragraph of 44, and 46 apply mutatis mutandis to the concessions granted pursuant to Articles 79 to 87.
1. Concessions related to constructions or installations whose erection is no longer authorized cannot be transferred.
1. The concession is automatically terminated upon the expiration of its term or by the written renunciation of the concessionaire.
2. The concessionaire is not released from its obligations until the site has been inspected by the department. Article 19 LVU [E] applies by analogy.
1. The grantor authority may declare the concessionaire forfeited of their rights
a. when they fail to observe the deadlines imposed by the administration;
b. when they interrupt the use of the concession for two years and do not resume it within the period fixed by the department;
c. when, despite warnings from the authority, they contravene essential duties.
1. The holder of a concession pays the State, in addition to a concession fee of CHF 60, an annual fee of at least CHF 40.
2. The holder of a departmental authorization pays the State an annual fee of at least CHF 40.
3. The annual fees are determined according to a tariff set by the Council of State [P].
1. Beneficiaries of permits for pumping from public waters may be required to form a group for the purpose of equitably distributing the available water.
2. In the absence of an agreement, the schedule for pumping and the flow rate granted to each party are definitively set by the watercourse supervisor.
1. No hindrance may be placed on the public's movement on pathways created under concessions or pursuant to the law on the footpath [G].
2. It is prohibited to place signs in the concession areas or in their vicinity that might mislead the public regarding their rights.
3. Any abuse may result in the forfeiture of the concession.
1. Any person who violates this regulation shall be punished in accordance with Article 28 of the Law of September 5, 1944, regarding the use of lakes and watercourses falling under public domain [E], as amended by the Law of November 27, 1951.
1. This regulation repeals the regulation of April 26, 1901, for the use of lakes and watercourses pertaining to public domain.
2. The Department of Public Works [H] is responsible for the execution of this regulation, which takes effect immediately.