RLE

1 A building permit is an administrative act by which the authority ascertains that no public law impediment stands in the way of the execution of the planned works.

2 The permit does not confer any new right upon its holder; in principle, it does not protect him from the consequences of a new right, unless the law expressly provides otherwise.

RLE

[1] 1 The license is granted by the Municipality, subject to cantonal opinion pursuant to Art. 3 para. 1 and 7 LE in cases provided for by the legislation referred to in Annex 1. The cantonal opinion is issued

a) by the General Services for building applications outside the building zone and for applications that involve a balancing of interests;

b) by the Building Applications Office in other cases.

2 The Building Applications Office (BAO) is responsible for the preparation and must in particular

a) manage the procedure relating to building applications pursuant to cantonal and federal building legislation;

b) eliminate, after evaluation and review of the case by the interested service, possible contradictions that may arise in this context;

c) disregard preliminary opinions lacking a sufficient legal basis;

d) submit the proposal for the cantonal opinion to the General Services.

3 The Municipalities are delegated the competence to apply the norms that the law entrusts to the cantonal authority in the matters indicated in Annex 2.

[1] Art. amended by R 13.12.2023; in force from 1.1.2024 - BU 2023, 381; previous amendment: BU 2007, 70.

RLE

[2] **1 Building permits are not required for:**

a) buildings or installations whose approval is regulated in detail by special federal and cantonal laws, such as the Federal Act on National Roads, the Federal Act on Forests, the Roads Act, the Act on Land Consolidation and Exchange, the Act on Consortia (of 1913);

b) ordinary maintenance works that do not alter the external appearance or the intended use of buildings and installations, such as the replacement of utilities or installations not entailing a change in energy consumption, the replacement of roofs without changing the carpentry and the type of materials;

c) buildings or installations exempted from cantonal jurisdiction by federal law;

d) minor internal alterations to buildings, such as the relocation of walls and doors;

e) ...;

f) ...;

g) the arrangement of vegetable gardens and gardens with usual furnishing equipment;

h) excavations and backfills with earthy material for an appropriate landscaping of the terrain up to a height of 1.00 m and an area of 500 sq m, for a maximum of 200 cubic meters, in the building zone according to the master plan approved by the Council of State; [3]

i) temporary constructions, i.e., constructions intended to meet a contingent need, whose duration is predetermined, such as construction site barracks for storing materials and tools, circus tents and event tents;

k) the parking of caravans for a period not exceeding three months within one year outside the forest area;

l) the deposit of inert materials for a period not exceeding three months, provided that such deposit does not affect protected biotopes or those worthy of protection and is outside the forest area;

m) solar installations sufficiently adapted to roofs or facades located in building zones and agricultural zones (Art. 18a of the Federal Act on Spatial Planning of 22 June 1979); [4]

n) solar installations placed on flat roofs in intensive goods or services production zones (Art. 27 paragraph II of the Regulation on the Spatial Development Act of 20 December 2011 and Art. 18a of the Federal Act on Spatial Planning of 22 June 1979); [5]

o) the replacement of windows and doors installed on residential buildings after January 1, 1991, subject to prior notification to the Municipality; [6]

p) in the building zone, subject to any more restrictive municipal regulations, the rental for tourist purposes not subject to the Hotel and Restaurant Act of March 15, 2023 (LEAR), of residential units or parts thereof, for a total period not exceeding 90 days per calendar year, subject to prior notification to the Municipality. [7]

**2 Exemption from a permit does not in any case waive the requirement for execution in compliance with the law, professional standards, safety regulations, and a sparing use of energy.**

[2] Art. amended by R 13.11.1996; in force since 1.1.1997 - BU 1996, 377.

[3] Subparagraph amended by R 14.6.2017; in force since 20.6.2017 - BU 2017, 174.

[4] Subparagraph amended by R 17.6.2026; in force since 1.7.2026 - BU 2026, 183; previous amendment: BU 2014, 282.

[5] Subparagraph introduced by R 21.5.2014; in force since 23.5.2014 - BU 2014, 282.

[6] Subparagraph introduced by R 14.6.2017; in force since 20.6.2017 - BU 2017, 174.

[7] Subparagraph amended by R 7.6.2023; in force since 15.6.2023 - BU 2023, 244; previous amendment: BU 2022, 297.

RLE

[8] 1 For solar installations not subject to licensing, the notification pursuant to Articles 32a and 32a bis of the Spatial Planning Ordinance of 28 June 2000 must be submitted in writing and in two copies to the Municipal Council at least thirty days before the start of works. [9]

**2 It must be accompanied by the documents necessary to substantiate the intervention and to demonstrate that the installation is sufficiently adapted to the roof and/or the facade, and specifically:**

**a) the name and address of the property owner;**

**b) the map number and sub-parcel number;**

**c) a 1:500 or 1:1000 site plan extract of the building;**

**d) a model of the proposed panel and the total installed power;**

**e) depending on the intervention, a plan of the roof and/or facades indicating the dimensions and position of the installation;**

**f) one or more sections. [10]**

**3 Within ten days of receipt, the Municipal Council shall forward a copy of the documentation to the Section for Air, Water and Soil Protection.**

---

**[8] Art. introduced by R 21.5.2014; in force since 23.5.2014 - BU 2014, 282.**

**[9] Para. amended by R 17.6.2026; in force since 1.7.2026 - BU 2026, 183.**

**[10] Para. amended by R 17.6.2026; in force since 1.7.2026 - BU 2026, 183.**

RLE

A building permit is required for

a) the construction, renovation, even partial transformation (including the mere change of use), and reconstruction of buildings and facilities of any kind;

b) the partial or total demolition of buildings;

c) any other building work or facility such as

- walls, swimming pools, private roads, fixed greenhouses, road access, parking spaces for vehicles and boats, sales yards for automobiles and other movable goods;

- sewage systems and wastewater treatment plants;

- manure or slurry tanks;

- tanks for gas, heating oils, and fuels;

- facilities for the transport of goods and persons, insofar as they are not subject to federal concession;

d) the opening of quarries for the extraction of materials of all kinds, excavations, and backfills;

e) the deposit of waste, materials, and machinery of any nature;

f) campsites;

g) mobile and fixed wireless telecommunication facilities and their modifications within the meaning of the implementing regulation of the Federal Ordinance on Protection against Non-Ionising Radiation (NISR); [11]

h) the replacement of windows and doors and the installation of solar systems in historic centers, landscape protection zones (Article 105 et seq. of the Spatial Planning Act of June 21, 2011), within the Cantonal Land Use Plan for Protected Landscapes with Buildings and Facilities (PUC-PEIP), in settlements listed in the Federal Inventory of Swiss Sites to Protect of National Importance (ISOS), and within the protection perimeters of cultural heritage sites of cantonal interest (Article 22 para. 2 of the Cultural Heritage Protection Act of May 13, 1997). [12]

[11] Letter introduced by R 26.6.2001; in force since 3.7.2001 - BU 2001, 175.

[12] Letter modified by R 19.11.2025; in force since 21.11.2025 - BU 2025, 305; previous modifications: BU 2014, 282; BU 2017, 174.

RLE

1 Insofar as they are not explicitly subject to the notification procedure (Art. 6), all interventions referred to in Art. 4 are subject to the ordinary procedure.

2 It is not permitted to subdivide works in such a way as to circumvent the ordinary procedure.

3 Any intervention on buildings or facilities located outside the building zone must be submitted to the ordinary procedure. [13]

[13] Para. introduced by R 13.11.1996; in force since 1.1.1997 - BU 1996, 377.

RLE

1 The following are subject to the notification procedure in the building zone according to the PR approved by the Council of State

1. renovation and transformation works, without substantial modification of the external appearance or the destination and general appearance of the buildings or facilities;

2. the replacement of roofs with modifications to the carpentry or the type of roofing materials;

3. accessory constructions, elementary constructions, and pergolas;

4. fences and retaining walls;

5. the partial or total demolition of buildings;

6. the construction of walls, private swimming pools, private roads, accesses to public roads of local authorities or private roads open to the public, vehicle parking spaces for single-family and two-family residential buildings, provided that all these works do not generate substantially new repercussions on the permissible use of the land, on urbanization works, or on the environment;

7. the connection of residential buildings to drainage systems;

8. the deposit of materials and machinery;

9. excavations and backfills with earthy material up to a height of 1.50 m and an area of 1000 sqm;

10. the opening of doors, windows, or display windows, as well as the creation of balconies without substantial modification of the appearance;

11. the painting of buildings and facilities. [14]

2 The Municipality may not authorize, without the approval of the author of the restriction, works of any kind concerning projects involving the application of the laws referred to in Annex 1.

[14] Para. amended by R 13.11.1996; in force since 1.1.1997 - BU 1996, 377.

RLE

Projects for the construction and reconstruction of buildings for habitation, work, commerce, and the storage of goods and materials must be prepared and signed by an architect or an engineer, depending on the nature of the work, or by a person authorized under prior law; and, insofar as they are not of secondary importance, projects for canalizations and annexed installations, roads, bridges, flood defenses, landslides, rockfalls, and similar works.

RLE

1 The building application, prepared on the official form, must be submitted to the Municipality.

2 The application and projects must be signed by the person requesting the license, the owner of the property, and the designer.

RLE

The application must contain

a) the name and address of the person applying for the license, of the property owner, of the designer, and of the quality assurance manager (Art. 12 Fire Protection Act of 14 December 2022 – LPA); [15]

b) the type of building or facilities and the quality of the materials used;

c) the precise intended use of the building or facilities;

d) the coordinates according to the national map, the parcel number, the locality and description of the property, an excerpt from the national map at a scale of 1:25,000, with an indication of the location;

e) requests for derogations, with specification of the reasons;

f) the indication of the forest boundary within a radius of 30 linear meters;

g) the occupation of public land;

h) the cost estimate according to SIA standards;

i) depending on the nature of the work

– the detailed calculation of the occupancy and exploitation indices;

– the calculation of thermal insulation;

– the volume of buildings or facilities;

– the method of water supply and wastewater disposal;

– in artisanal or industrial buildings or facilities, the number of persons presumably employed therein;

– the documents required by special laws, in particular the environmental impact assessment according to the relevant federal ordinance, declarations concerning atmospheric emissions, any substances used, and energy saving measures. [16]

l) the certificate of conformity of the project with fire protection regulations where prescribed (Art. 3 LPA); [17]

m) the probable date of commencement of works and their duration; [18]

n) the information pursuant to Art. 16 of the Ordinance on the Prevention and Disposal of Waste of 4 December 2015 (OPSR) concerning the type, quality, and quantity of construction waste produced, as well as its disposal, if

– it is expected that more than 200 cubic meters of construction waste will be produced or that the construction waste produced will contain substances harmful to the environment or health;

– the intervention involves the demolition or transformation of buildings or facilities constructed before 1 January 1991; in this case, the information must be provided through an expert report prepared by a recognized specialist;

– interventions on a contaminated site within the meaning of the Ordinance on Contaminated Sites of 26 August 1998 (OSiti) are planned; [19]

o) for projects outside the building zone, a 1:100 plan indicating the modifications made to the impermeable surface of the soil pursuant to Art. 25a paras. 2 and 3 of the Ordinance on Spatial Planning of 28 June 2000 (OPT), including any restorations. [20]

[15] Subpara. amended by R 20.3.2024; in force since 22.3.2024 - BU 2024, 82; previous amendment: BU 2015, 208.

[16] Subpara. amended by R 14.6.2017; in force since 20.6.2017 - BU 2017, 174; previous amendments: BU 2006, 128; BU 2013, 391.

[17] Subpara. amended by R 20.3.2024; in force since 22.3.2024 - BU 2024, 82; previous amendment: BU 2012, 97.

[18] Subpara. introduced by R 7.3.2012; in force since 1.4.2012 - BU 2012, 97.

[19] Subpara. amended by R 14.6.2017; in force since 20.6.2017 - BU 2017, 174; previous amendment: BU 2016, 334.

[20] Subpara. introduced by R 17.6.2026; in force since 1.7.2026 - BU 2026, 183.

RLE

1. The application must be accompanied by a site plan issued by the surveying engineer.

2. The plan may be replaced by a survey carried out by a surveyor or the designer, when an updated map does not exist.

3. The plan must specify

a) the coordinates according to the national map, the orientation, the local name, the map numbers; [21]

b) the location of the proposed works, their dimensions, the distances from boundaries and from existing or projected buildings, road accesses and, where necessary, areas reserved for children's play and for parking spaces.

[21] Letter amended by R 13.11.1996; in force since 1.1.1997 - BU 1996, 377.

RLE

1 The projects must provide all information necessary to make clearly understandable the nature and extent of the works subject to the application.

2 Variant or alternative solutions may be provided.

3 The authority may, if necessary, request information or additional details; in particular cases, the preparation of special studies may also be requested, such as geological, soil mechanics, hydrographic or traffic, and acoustic expert opinions and similar, or expert opinions on the use or disposal of substances, products, or materials potentially dangerous or harmful to health. [22]

4 Any objections regarding the necessity of preparing special studies or expert opinions pursuant to paragraph 3 shall be decided by the Department, without particular formalities. [23]

[22] Para. amended by R 28.3.2006; in force from 31.3.2006 - BU 2006, 128.

[23] Para. introduced by R 22.8.2006; in force from 25.8.2006 - BU 2006, 308.

RLE

1 The projects must include the following plans

a) the floor plan of each floor, with the main dimensions and the intended use of each room;

b) one or more sections for each building body, from which the height of the building and that of the individual floors, the level of the natural ground, and that of the adjacent public roads can be deduced; the sections must also clearly show any projections onto the public area;

b 1) for buildings; [24]

c) the indication of the volume of excavated material and/or demolitions, of material brought back to the site, and the destination of any surplus material;

d) the indication of the volume of excavated material and/or demolitions, of material brought back to the site, and the destination of any surplus material in the cases listed in art. 9 letter n); [25]

e) the external arrangements plan, including in particular details of access to public roads, parking spaces, and recreation areas;

f) the civil protection shelters plan drawn up according to the directives of special legislation.

2 As a rule, projects are prepared at a scale of 1:100; for large-scale projects, a scale of 1:200 may be used; in the case of transformation or renovation, demolitions shall be indicated in yellow and new constructions in red.

[24] Letter introduced by R 7.11.2012; effective from 9.11.2012 - BU 2012, 520.

[25] Letter modified by R 14.6.2017; effective from 20.6.2017 - BU 2017, 174.

RLE

[26] 1 For applications concerning buildings worthy of preservation (categories 1a, 1c, 1d), already transformed buildings worthy of preservation (category 3) and reconstructions of reconstructible ruined buildings (category 1b) according to the municipal inventory of buildings outside the building zone (IEFZE) within the Cantonal Land Use Plan for Protected Buildings and Facilities (PUC-PEIP), depending on the nature of the intervention, projects must include

a) survey plans and project plans

– floor plans of each floor, with main measurements and the intended use of each room (scale 1:50),

– sections of each part of the building, from which the overall work elevations and those of individual floors, as well as the surrounding natural ground, can be deduced (scale 1:50),

– all facades of the building and those of any adjoining buildings (scale 1:50),

– the exterior layout (scale 1:100).

Graphic representations must indicate demolitions in yellow, new interventions and new components in red, and elements that will be removed and subsequently replaced in their original position in purple;

b) a complete photographic survey of the building (4 elevations and interior of each room) and its landscape (reference landscape unit, Art. 14 NAPUC-PEIP) documenting its condition at the time of submission of the building application;

c) a technical report precisely describing all planned interventions, construction details and materials used, as well as the presence of particular details and valuable original elements to be preserved, and a description of the reference landscape unit;

d) an indication of the volume of surplus excavated material and demolitions, and their destination;

e) the management methods for the reference landscape unit at the time of submission of the building application;

f) a proposal from the applicant for the management of the building's reference landscape unit.

2 In the case of minor interventions, the Department may exempt the applicant from submitting individual documents required by the preceding paragraph.

[26] Art. introduced by R 7.11.2012; in force from 9.11.2012 - BU 2012, 520.

RLE

1 Canalization projects must include

a) the site plan (as a rule, at a scale of 1:500);

b) the plans and longitudinal profile of the canalizations, with water treatment structures, collection and inspection manholes, wastewater disposal structures, surface dispersion areas, as well as the point of connection to the public sewer system;

c) the construction details of special structures for the treatment, evacuation, and disposal of wastewater;

d) the technical report;

e) the eventual wastewater disposal plan;

f) the eventual geological expert opinion to ascertain the suitability of the soil for water disposal.

2 Construction details are prepared at a scale of 1:20 or 1:50.

RLE

1 Projects for the installation of tanks, fuel storage facilities, fuel oils or other liquids harmful to water must indicate

a) the exact location of the storage facilities, tanks and adjacent constructions;

b) the water protection sector (S, A, B, C) in which the storage facility or tank is located;

c) the nature of the liquids contained in the storage facility or tank;

d) the characteristics of the facilities and tanks (capacity, type);

e) fire prevention and control measures;

f) a technical report indicating

- water pollution protection measures;

- containment basins, trays, safety and alarm systems, type of lining, corrosion protection measures, etc.;

- static calculations for the protection work of facilities with a volume exceeding 50 cubic meters;

- details of overflow prevention works during filling (transfer areas).

2 The technical details shall be prepared at a scale of 1:20 or 1:50.

RLE

The project must include

a) an excerpt from the national map on a scale of 1:25,000;

b) an excerpt from the cadastral map, the site plan, and the sections of excavations or backfills;

c) a report indicating the purpose, the volume of material movements, the duration, a description of the equipment used, and information on the situation of spring or groundwater;

d) the rehabilitation plan for the area.

RLE

1. The application, in five copies, must be accompanied by the site plan and the projects, also in five copies.

2. For applications subject to the notification procedure, 3 copies of the site plans and projects are sufficient. [27]

3. The documents, dated and numbered, folded to A4 format, must be submitted in separate files. [28]

[27] Para. amended by R 13.11.1996; in force since 1.1.1997 - BU 1996, 377.

[28] Para. introduced by R 13.11.1996; in force since 1.1.1997 - BU 1996, 377.

RLE

1 The notice of publication of the building permit application must contain

a) the name of the person applying for the permit and of the owner of the land;

b) the type of work;

c) the exact intended use of the buildings or installations;

d) the local name, the map number, and the description of the land;

e) any requests for derogations;

f) the period of publication and the hours during which the documents may be inspected;

g) the deadline for objections.

2 A copy of the notice shall be served on the applicant and the adjoining landowners; for buildings or installations located outside building zones, notice shall also be given in the Official Gazette. [29]

3 Publication may not occur until the changes to the site resulting from the work have been adequately indicated on the ground with stakes and templates.

4 For works subject to the notification procedure, publication in the Official Gazette is not required; the Municipality may also dispense with publication in the municipal registers and notice to neighbors if the involvement of particular public or private interests is excluded.

[29] Para. amended by R 13.11.1996; in force since 1.1.1997 - BU 1996, 377.

RLE

1 Concurrently with the publication, four copies of the application and its annexes are transmitted to the Construction Permit Office (hereinafter CPO) by registered letter or registered parcel. [30]

1 bis The application data may be transmitted to the Department in electronic form using the GIPE application (computerized management of building procedures). For the thirty-day period referred to in Art. 7 para. 1 of the Building Act, the date of receipt of the documents transmitted by post shall nonetheless prevail. [31]

2 Within five days at the latest from the expiry of the publication period, the mayor or other person entrusted by the Municipal Council shall inform the CPO, by registered letter, whether or not objections have been received; a copy of any objections received, with any observations, shall be enclosed. [32]

3 The provisions of this article do not apply to the notification procedure.

[30] Para. amended by R 27.2.2007; in force since 1.1.2007 - BU 2007, 70.

[31] Para. introduced by R 14.6.2017; in force since 20.6.2017 - BU 2017, 174.

[32] Para. amended by R 27.2.2007; in force since 1.1.2007 - BU 2007, 70.

RLE

1 The deadlines established by Art. 7 of the LE do not begin to run until the acts have been completed in conformity with the requests of the UDC (documents, supplementary studies, etc.). [33]

2 The Municipality and the applicant are informed of the suspension of the deadlines by formal decision.

[33] Para. modified by R 27.2.2007; in force since 1.1.2007 - BU 2007, 70.

RLE

The Council of State publishes in the Official Gazette the list of known cantonal organizations that are entitled to file objections.

RLE

1 The license may not be renewed before its term of validity has expired. [34]

2 The application for renewal must be accompanied solely by the expired license.

3 The procedure followed for the grant of the license (ordinary or notification) is applicable, excluding Art. 17 for cases where no amendment to the applicable law has been approved in the interim. [35]

[34] Paragraph amended by R of 13.11.1996; in force since 1.1.1997 - BU 1996, 377.

[35] Paragraph amended by R of 13.11.1996; in force since 1.1.1997 - BU 1996, 377.

RLE

1 In the event of civil disputes arising, the authority shall refer the interested party to the civil judge; as a rule, such disputes do not suspend the administrative procedure.

2 The validity period of the license shall be suspended during the course of civil proceedings only insofar as the proceedings concern disputes regarding ownership rights and neighbourly relations that prevent the utilization of the license.

RLE

[36] 1 Works may not commence before the building permit has become legally enforceable, unless otherwise provided by the authority.

2 At least seven days before the commencement of the works, a written notification must be submitted to the Municipality, informing it of the name of the construction company executing the works, the methods of execution, the machinery employed, and the measures planned for the protection of peace from noise, as well as the methods of use or disposal of potentially hazardous or harmful substances, materials, or products.

3 The construction company executing the works is obliged to ensure that a sign, with dimensions not less than 1 meter in width and 0.5 meters in height, is installed and maintained on the construction site throughout the entire period of execution of the works, placed in a clearly visible location within five days of the commencement of the works. Both the sign and its support system must be made of materials of adequate strength and decent appearance. The sign must bear, printed in indelible colors, the company name of the construction company executing the works, as well as the data relating to the work management.

4 Works are considered commenced when

a) the necessary demolition works are underway; or

b) the installations necessary for the execution of the work have been placed on the construction site; or

c) it is established that substantial expenses were incurred to ensure the protection of the construction site and nearby works; or

d) the foundations of the building or plant have been laid.

5 After a period of two years has elapsed without the works having commenced, the permit can no longer be used before obtaining a renewal (Art. 14 LE).

[36] Art. amended by R 30.3.2010; in force since 2.4.2010 - BU 2010, 133; previous amendment: BU 2006, 128.

RLE

1 The permit may be revoked, after prior warning, if the works are not continued in the usual manner and within the usual deadlines; in such a case, the authority shall require the restoration of a situation compliant with the law, ordering the remediation of the property if necessary. [37]

2 The Municipality shall inform the Department of violations of the law on the exercise of the profession of building contractor.

[37] Para. amended by R 13.11.1996; in force since 1.1.1997 - BU 1996, 377.

RLE

Urgent works, determined by exceptional events such as floods and fires, intended to prevent serious damage or safeguard the safety and physical integrity of persons or property, may be commenced prior to the submission of the building permit application, provided immediate notice is given to the Municipality.

RLE

1. The application for a preliminary license according to Art. 15 LE must be accompanied by a site plan and, as a rule, by preliminary designs or illustrative sketches.

2. The application and accompanying documents must be submitted in five copies.

3. The ordinary procedure is applicable unless the applicant has expressly waived it.

RLE

[38] 1 For the construction, expansion, or change of use of buildings or facilities with significant territorial impact, the applicant may request the UDC to convene the Advisory Commission. [39]

2 The UDC, by consulting the competent cantonal and municipal services and assigning them a deadline for response, provides an opinion, binding for 6 months, on the building possibilities of the properties indicated by the applicant. [40]

3 Third-party rights remain reserved in any case.

[38] Article amended by R 4.3.1998; in force since 10.3.1998 - BU 1998, 65; introduced by R 13.11.1996 - BU 1996, 377.

[39] Paragraph amended by R 27.2.2007; in force since 1.1.2007 - BU 2007, 70.

[40] Paragraph amended by R 27.2.2007; in force since 1.1.2007 - BU 2007, 70.

RLE

1. The building permit may be transferred to third parties by means of a notice to the Municipality, signed by the new and previous holder.

2. After the commencement of works, the Municipality may object to the transfer if important public interests are threatened.

RLE

The Municipalities are required to retain the documents related to building permits for a period of ten years.

RLE

For the granting of a building permit, no taxes and fees other than those established by Art. 19 LE may be levied; the levying of taxes provided for by special laws is reserved.

RLE

1 Buildings, installations, and all other works must be designed and executed according to the rules of art, taking into account the technical prescriptions issued by the authorities, and subsidiarily by recognized professional associations such as the Swiss Society of Engineers and Architects (SIA), the Swiss Association for Water Protection (VSA/ASTEA), the Swiss Association of Sheet Metal Workers and Installers (APSLI), and the Swiss Road and Transport Association (VSS).

2 The height, volume, insolation, lighting, aeration, thermal and sound insulation of premises intended for dwelling and work must comply with hygiene requirements, taking into account local conditions.

3 Furthermore, special provisions must be observed, in particular those of environmental and water protection legislation, health legislation, labor law, fire protection, accident prevention, and energy saving. [41]

[41] Art. amended by R 20.3.2024; in force since 22.3.2024 - BU 2024, 82.

RLE

In addition to the safety measures for workers prescribed by special legislation, adequate measures must also be adopted for the safeguarding of the safety of third parties.

RLE

... [42]

[42] Article repealed by R 13.11.1996; in force from 1.1.1997 - BU 1996, 377.

RLE

Static calculations for projects referred to in Art. 7 of these regulations must be prepared by an engineer in accordance with Art. 4 LE.

RLE

… [43]

[43] Art. repealed by R 27.3.2013; effective from 2.4.2013 - BU 2013, 147; previous amendment: BU 2007, 70.

RLE

1 Until the introduction of master plans, the minimum height of habitable rooms is 2.30 m; mezzanines may have a lower height. For attics, the average height is determinative. [44]

2 For mountain constructions, such as huts and chalets, the height may be less than 2.30 m.

3 Derogations may be granted in the case of renovation or transformation of existing buildings.

Lifts [45]

[44] Para. amended by Reg. 13.11.1996; in force since 1.1.1997 - BO 1996, 377.

[45] Marginal note amended by Reg. 17.9.2013; in force since 1.1.2014 - BO 2013, 391.

RLE

[46] 1 The installation of new lifts and safety components, as well as modifications or renewals that significantly affect their safety, must comply with the provisions of the Lift Safety Ordinance of 23 June 1999.

2 In particular, new lifts and safety components may only be installed if they have been placed on the market in accordance with Articles 4 to 10 of the Ordinance.

3 Modifications or renewals that significantly affect the safety of lifts or safety components must be implemented in such a way as to ensure the elimination of at least the following significant hazards listed in standard SIA 370.080

a) drive system with poor levelling or stopping accuracy (no. 3 of the list of significant hazards);

b) inadequate glass in doors (no. 27);

c) car surface too large in relation to the load capacity (no. 38);

d) car without doors (no. 40);

e) no or inadequate emergency lighting in the car (no. 46);

f) no or inadequate buffers (no. 56);

g) no or inadequate alarm device (no. 71).

4 Compliance with these requirements must be certified by an installer who fulfils the obligations set out in point 2 of Annexes 8, 9 or 10 of the Ordinance, or by an entity accredited by the Swiss Accreditation Service (SAS) or another recognised accreditation service.

5 In any case, the operation of lifts is subject to an inspection and periodic checks carried out by an installer or an entity in accordance with the preceding paragraph. The costs shall be borne by the owner.

[46] Art. amended by R 21.5.2014; in force since 23.5.2014 - BU 2014, 282; previous amendments: BU 2006, 28; BU 2013, 391.

RLE

1 The following specific provisions for the protection of peace from noise are applicable to construction site works

a) machines used in construction must, as a rule, be electrically operated; in the vicinity of hospitals, nurseries, schools, scientific institutions, churches, and cemeteries, other machines may only be used when the use of electricity is not reasonably exigible;

b) noisy works, such as woodworking or metalworking, must normally be carried out in sheds or enclosed premises;

c) the use of pile drivers and the driving of iron sheet piles are permitted only when other systems are not possible or their cost is disproportionate.

2 The Municipality is obliged to prescribe adequate measures to minimize unavoidable noise, such as the use of absorbent coatings or other devices and the limitation of works to specific periods and times; it may also prohibit the use of machines that, due to their age or poor state of maintenance, cause unnecessary noise.

3 The provisions of environmental protection legislation are reserved.

RLE

Buildings, installations, and every other work, including the annexed land, must be maintained in such a way as not to offend decorum and not to endanger persons and property.

RLE

… [47]

[47] Art. repealed by R 27.3.2013; in force from 2.4.2013 - OG 2013, 147; previous amendment: OG 2011, 648.

RLE

1 In addition to what is exemplified in Art. 38 para. 1 of the Building Act (LE), civil protection shelters, private swimming pools, and subterranean archives and storage rooms that are not accessible to the public and are not used for work are not included in the gross floor area.

2 Balconies not included in the calculation of the setback from the boundary are not computed in the occupancy index.

3 For the calculation of the gross floor area, buildable area, and built area, the thickness of the perimeter walls with thermal insulation of new buildings is considered to be a maximum of 35 centimetres. [48]

4 The bonus on the gross floor area under Art. 40a para. 3 of the law is granted only for the construction of new buildings that achieve at least energy efficiency class A for the building envelope and energy efficiency class B overall according to the Cantonal Energy Certificate for Buildings (CECB), or that obtain at least a Minergie-P, Minergie-A, or Minergie-ECO certificate. For the renovation of existing buildings, achieving energy efficiency class B for the building envelope and energy efficiency class B overall according to the CECB, or obtaining a Minergie certificate, is required. In any case, the CECB New Building - provisional, the CECB Plus, or the provisional Minergie certificate must be submitted with the building permit application. [49]

[48] Para. introduced by Law of 14.12.2010; in force since 1.1.2011 - Official Gazette (BU) 2010, 535.

[49] Para. modified by Regulation of 17.6.2026; in force since 1.7.2026 - Official Gazette (BU) 2026, 183; previous modifications: BU 2010, 53; BU 2023, 389.

RLE

[50] Municipalities exercise control over building volumes through an official register established according to the provisions of Art. 38b) of the Building Act.

[50] Art. introduced by R 13.11.1996; in force since 1.1.1997 - BU 1996, 377.

RLE

1 The distance is measured at the point where the building or installation most closely approaches the boundary, from the extremity of the protruding elements, excluding gutters and balconies that have a protrusion of up to 1.10 m and do not occupy more than one-third of the length of the facade.

2 If the boundaries are irregular, an average distance may be taken.

3 Balconies enclosed on the sides are considered as protruding elements, regardless of their width.

RLE

1 Unless otherwise provided by building regulations or the master plan, the distances from the boundary do not apply to buildings and installations that protrude from the ground less than 1.50 m.

2 Unless otherwise provided, the distances from roads and waterways must, however, be observed even for underground works.

RLE

Attic apartments are included in the computation of the height of buildings.

RLE

Semi-basement floors, projecting more than 1.50 m from the finished ground level on at least one façade, and attics are computed as a floor when their surface area exceeds two-thirds of the surface area of a full floor.

RLE

-44i … [52]

[52] Art. repealed by R 6.12.2023; in force from 1.1.2024 - OJ 2024, 357; previous amendments: OJ 1996, 377; OJ 2002, 355; OJ 2007, 70; OJ 2012, 97; OJ 2015, 208; OJ 2017, 174.

RLE

[54] 1 Municipalities are competent for the application of the Federal Act on Second Homes of 20 March 2015 (LASec) within the framework of the building permit procedure, subject to paragraph 2.

2 The Section for Spatial Development certifies the fulfilment of the conditions under Article 9 LASec (new homes in protected buildings); it may issue guidelines regarding the modalities of application of the LASec.

3 The Office of Statistics is the cantonal reference service for the management of the Register of Buildings and Dwellings (REA) and is competent for contacts with the Confederation in accordance with Article 5 paragraph 4 LASec.

4 The Council of State exercises supervision over the application of the LASec (Art. 15 LASec). In building procedures, it is exercised according to the provisions of Article 52.

5 The Land Registry Office notifies the Municipality of entries in accordance with Article 16 paragraph 2 LASec with the buyer's data in conformity with Article 970 paragraph 2 of the Swiss Civil Code.

[54] Art. introduced by R 6.7.2016; in force since 8.7.2016 - BU 2016, 334.

RLE

[55] 1 Pursuant to Art. 9 LASec, all buildings protected as cantonal or local cultural assets under the Law on the Protection of Cultural Assets of 13 May 1997 are protected.

2 For the purposes of typical buildings under Art. 9 para. 1 LASec and Art. 6 para. 1 of the Ordinance on Secondary Homes of 4 December 2015 (OASec), typical buildings are understood to be traditional constructions deserving preservation in their identity because, due to their construction typology, architectural features, materials, and position within the settlement fabric, they contribute essentially to determining and qualifying the character of the site in which they are located.

3 The typicality and the relationship of the building to the site shall be verified within the building permit procedure. For this purpose, the applicant is required to provide documentation (report, plans, photographs) describing

a) the characteristics and value of the settlement in which the building is located;

b) the building itself, its construction typology, architectural features, and its state of preservation;

c) the relationships between the building, open spaces, and other constructions in its vicinity.

[55] Art. introduced by R 6.7.2016; in force from 8.7.2016 - BU 2016, 334.

RLE

1 The Municipality orders the suspension of works and uses that are unauthorized or carried out in contravention of the building permit; the order may also be issued by the Department if the Municipality fails to intervene with the necessary promptness, especially when provisions falling within cantonal competence are violated. [56]

**2 The order must not exceed what is necessary to preserve the factual situation to the extent that it is disputed (the contested works must be precisely listed); and, if the violations do not appear manifestly serious, the order must be preceded or immediately followed by a hearing with the interested parties.**

**3 Works in contravention of the building permit must be allowed to continue if merely the notification of a non-publicly advertised amendment was omitted.**

**4 The suspension order must indicate the measures to be adopted for the restoration of a state compliant with the law, assigning, where necessary, the owner a deadline for depositing an application for an amendment.**

**5 The decision to suspend the works is immediately enforceable.**

**6 The suspension of use is ordered immediately and executed within the terms of Art. 43b para. 1 lit. a OPT. [57]**

**[56] Para. amended by R 17.6.2026; in force from 1.7.2026 - BU 2026, 183.**

**[57] Para. introduced by R 17.6.2026; in force from 1.7.2026 - BU 2026, 183.**

RLE

Formal violations of the law are cured by subsequent license, reserving the contravention procedure.

RLE

1 Before ordering the demolition or rectification of buildings or installations outside building zones, the Municipality must seek the opinion of the Department; this opinion concerns the right of cantonal competence.

1bis In the presence of a material violation that cannot be retrospectively authorized, the Municipality shall transmit to the Department, within 60 days of ascertainment, a proposal for an order to restore legality. Upon receipt of the binding cantonal opinion, the Municipality shall issue the order to restore legality within 30 days. [58]

1ter In the presence of a retrospective building application, the proposal for an order to restore legality must be submitted within 60 days of receiving the cantonal objection. The remainder of para. 1bis applies. [59]

1quater The proposed decision referred to in the preceding paragraphs must indicate the methods of restoration and the term for execution, which in no case may exceed that prescribed by Art. 43c para. 1 OPT. [60]

2 Demolition does not preclude contravention proceedings.

[58] Para. introduced by R 17.6.2026; in force since 1.7.2026 - BU 2026, 183.

[59] Para. introduced by R 17.6.2026; in force since 1.7.2026 - BU 2026, 183.

[60] Para. introduced by R 17.6.2026; in force since 1.7.2026 - BU 2026, 183.

RLE

The Municipality may request the intervention of the cantonal police when, in certain cases, it does not possess sufficient forces to carry out its functions (Art. 108 LOC).

RLE

1 Public law restrictions on property cannot be abolished or modified by agreement of the parties, not even with the consent of the authority, except in cases expressly provided for by law, plans, or regulations.

2 Public law restrictions exist even without inscription in the land register.

RLE

[61] Anyone who, while digging on their own land or on the land of others, discovers archaeological objects, relics, or other ancient structures, must suspend the excavation, ensure that no one tampers with the findings, and immediately notify the Municipality and the Office for Cultural Heritage.

[61] Art. amended by R 27.2.2007; in force since 1.1.2007 - BU 2007, 70.

RLE

[62] All decisions concerning the granting of building permits, whether in the form of the ordinary procedure (Art. 4 et seq. Building Law), work suspension (Art. 42 para. 1 Building Law), demolition (Art. 43 Building Law) and monetary penalties (Art. 44 Building Law) must also be notified to the UDC.

[62] Art. amended by R 27.2.2007; in force since 1.1.2007 - BU 2007, 70; previous amendment: BU 1996, 377.

RLE

[63] In the context of procedures concerning buildings or facilities located outside building zones, the UDC stamps the plans of the building permit application that have been subject to an examination resulting in a favorable preliminary opinion.

[63] Art. introduced by R 14.6.2017; in force since 20.6.2017 - BU 2017, 174.

RLE

The Department supervises the observance of the law in the Municipalities, reporting thereon to the State Council in cases where *ex officio* intervention is warranted as provided for in Art. 48 para. 2 LE.

Departmental services to the Municipalities and within the framework of federal plan approval procedures [64]

[64] Marginal note modified by R 17.6.2026; in force since 1.7.2026 - BU 2026, 183.

RLE

[65] 1 Services provided by the Department or its divisions to Municipalities in accordance with Art. 3 para. 2 of the Act shall be remunerated according to the salary grade of the officials involved and in accordance with the following fee schedule: [66]

Salary Grade

Hourly Rate

(francs)

1 - 3

fr. 60.--

4 - 5

fr. 75.--

6 - 7

fr. 85.--

8 - 9

fr. 100.--

10 - 11

fr. 115.--

12 - 13

fr. 130.--

14 - 15

fr. 145.--

16 - 17

fr. 165.--

18 - 20

fr. 185.--

1bis For services provided by the Department or its divisions within the scope of federal plan approval procedures in accordance with Art. 19a of the Act, the fee shall be set at 105 francs/hour. [67]

2 Municipalities and requesting entities within the meaning of the preceding paragraphs shall also be liable to reimburse the Department for any expenses related to expert opinions, travel, and other costs. [68]

3 The fees and expenses referred to in this article shall be charged directly to the State-Municipality account.

[65] Art. introduced by R 17.9.2013; in force since 1.1.2014 - BU 2013, 391.

[66] Para. amended by R 17.6.2026; in force since 1.7.2026 - BU 2026, 183.

[67] Para. introduced by R 17.6.2026; in force since 1.7.2026 - BU 2026, 183.

[68] Para. amended by R 17.6.2026; in force since 1.7.2026 - BU 2026, 183.

RLE

[69] 1 For the examination of notifications under Art. 6 para. 2, the cantonal fee amounts to CHF 50.-- for each preliminary notice.

2 It is levied by the Municipality and subsequently credited to the Canton in the State-Municipality account by the cantonal service that issued the preliminary notice.

[69] Art. introduced by R 17.9.2013; in force since 1.1.2014 - BU 2013, 391.

RLE

[70] The SDC represents the Canton in all matters concerning the management of building permit procedures according to cantonal and federal building law, including related disputes.

[70] Art. introduced by R 13.12.2023; in force since 1.1.2024 - BU 2023, 381.

RLE

1 The Implementing Regulation of the Building Law of 22 January 1974 is repealed.

2 This Regulation shall be published in the Official Bulletin of Laws and Executive Acts and shall enter into force on 1 January 1993.

Published in OB 1993, 10.

Appendix 1 [71]

[71] Appendix amended by R 19.11.2025; in force since 21.11.2025 – OB 2025, 305; previous amendments: OB 1996, 384; OB 2001, 175; OB 2024, 82.