Art. 11 Decree Concerning the Building Permit (BCP)
Art. 11 Decree Concerning the Building Permit (BCP)
The application shall include, notably
a) the name, address, and signature of the landowner, the project owner (or their authorized representative, if applicable), as well as the project designer;
b) the designation of the plot to be built on and the zone to which it belongs;
c) the purpose for which the project is intended;
d) the main dimensions of the constructions and installations, the type of construction, indication of the most important materials, and the type and color of the facades and roof;
e) for material extraction and deposit sites, their surface area, the height of embankments, the depth of excavations, and the type of materials to be extracted or deposited;
f) for commercial, office, artisanal, and industrial constructions, the probable number of people to be employed there;
g) for fattening and breeding facilities, the type and scale of animal holdings;
h) the situation and layout of vehicle parking spaces, how these spaces are legally secured, and, to the necessary extent, the outdoor setups and recreational spaces;
i) the property's access to the public road and how it is legally secured in case the land of a third party is involved;
j) the project's gross land use index as well as the minimum and maximum indices set by building regulations; the calculation must be presented in a verifiable manner;
k) the justification for any request for exemptions.