Water Rights Act of the Canton of Grisons (BWRG) - Scope of Application (BWRG)
Table of Provisions (70)
Statutory Text (70 Articles)
1. This law regulates the use of the public waters of the Canton of Graubünden for the production of electrical energy as well as the electricity supply to the municipalities and the canton.
1. This Act aims to
a) the rational use of local hydropower for the benefit of the municipalities, regions, and the canton;
b) the optimization and enhancement of the performance of existing hydropower plants;
c) an economically sensible and environmentally acceptable further expansion of water resources;
d) a secure, sufficient, and largely independent supply of the canton with the most affordable energy possible;
e) the coordination of the interests of the municipalities, regions, and the canton, which should be directed towards a common goal where possible; and
f) the regulation of responsibilities within the canton, while preserving the autonomy of the municipalities.
1. Terms and function designations in this law refer to both genders, unless the context of the law indicates otherwise.
1. Waters (rivers, lakes, streams) not demonstrably in private ownership are designated for public use.
2. They are the property of the municipalities within whose territory they are located and are subject to the provisions of this law concerning their use for the establishment of waterworks.
1. The canton provides advisory support to the municipalities upon their request in matters concerning the use of hydropower.
2. As a rule, this advisory service from the canton is provided free of charge.
1. In this Act, the following terms mean
a) Hydropower utilization: The use of natural hydropower and that which is generated by pumping water to a higher elevation. This utilization is for the purpose of energy generation;
b) Pumping station: A facility capable of using pumps to repeatedly use water from public bodies of water for the production of electrical energy, or to enable utilization beyond natural hydropower for the same purpose. Simple feeder pumps are not considered pumping stations;
c) Feeder pump: A pump facility that supplies water from public bodies of water to a power plant, without enabling its repeated use for the production of electrical energy;
d) Water charge: The fee owed annually by the concessionaire to the municipalities for the use of water;
e) Waterworks tax: The fee owed annually by the concessionaire to the canton;
f) Gross performance: The average mechanical gross performance of water calculated based on the usable gradient and the usable water volume.
g) * ...
1. The municipalities can utilize the hydropower of their waters themselves or grant the right of use to third parties by means of a concession.
1. For the use of a public water body that is located within the territory of multiple municipalities, a concession must be obtained from each of these municipalities. These concessions must be coordinated with each other.
1. For the construction of a pumping station, the concession of those municipalities is required in whose territory the wetted parts of the facilities are to be located.
1. The granting and modification of a concession are the responsibility of the municipal assembly or the ballot vote.
2. Decisions concerning modifications of a concession of a subordinate nature, as well as the transfer of a concession, may be delegated by the municipalities to the municipal council.
3. Decisions regarding the initiation of negotiations with a view to concession renewals in accordance with Article 48, paragraph 3, fall under the responsibility of the municipal council.
1. Concessions granted by the municipalities, as well as any amendments or transfers thereof, require government approval to be valid. Article 2bis of the cantonal constitution remains reserved. The project approval (Art. 58) is granted by the government.
2. Similarly, a municipal project to utilize the hydropower of its own waters requires government approval.
3. ...
1. If municipalities involved in contiguous concessions do not reach an agreement within a reasonable period, whether due to one or more municipalities acting dismissively without valid reasons, making excessive demands, or issuing conflicting awards, the government is responsible for the granting, amendment, and transfer of concessions, granting extensions for construction deadlines, as well as for the reversion regulations. It acts on behalf of the municipalities in this regard.
2. The government negotiates beforehand with the municipalities and appropriately considers the advantages and disadvantages of the intended use for them. It also takes into account overarching public interests.
1. The assessment of the waterworks and pumping station taxes of the canton is carried out by the president of the waterworks tax commission.
2. The commission is elected by the government. The term of office is four years.
3. Details are regulated by the government.
1. The exercise of the right of reversion is decided by the municipal assembly or the ballot vote in the municipalities.
2. The exercise of the right of reversion regarding the part of the reverting facilities belonging to the canton is decided by the government.
3. It reports periodically on the reversion.
1. The inspection of the hydropower installations is conducted by the competent department.
1. The supervision of the use of public waters falls under the responsibility of the government.
1. The municipalities have the right to
a) integrate facilities serving the supply of drinking water, firefighting water, and irrigation with a hydropower plant at their own expense during the construction of the plant;
b) use water from the allocated quantity, without compensation to the concessionaire, to meet the outlined needs for ensuring the supply of drinking water and, in extraordinary situations, water, particularly for firefighting and irrigation purposes. The withdrawal of water should not significantly impair the use of hydropower, otherwise, compensation is required.
1. The concession is granted to a natural or legal person, partnership, or public corporation.
2. The concessionaire must have their residence or registered office in one of the granting municipalities.
3. If one or more granting municipalities and the canton participate in a power plant company, they each have an independent right to a seat on its management board. Multiple municipalities participating in a power plant company must agree on a joint representation.
1. The government may require that the equity capital of the concessionaire amounts to 20 percent of the investment costs.
1. Among multiple applicants for the use of the water power of the same body of water, the municipality shall give preference, in the granting and transfer of a concession, to the applicant who best ensures the public interest and the most efficient use.
1. The canton and the granting municipalities are entitled to participate in power plant companies.
2. The municipalities shall be given the opportunity to participate in the company upon the granting, modification, and transfer of concessions, and the canton upon their approval, even without the obligation to procure energy by assuming the annual costs.
1. Each concession shall specify
a) the identity and registered office of the concessionaire;
b) the scope of the granted usage rights;
c) the residual water amount to be maintained;
d) the duration of the concession;
e) the representation of the public entity in the administration of the concessionaire;
f) the principal installations;
g) the economic obligations imposed on the concessionaire;
h) the insurance obligations of the concessionaire;
i) the deadlines for commencing construction or renovation work as well as for the commissioning of the power plant;
k) the reversion;
l) the buy-back, if such is agreed upon by the parties.
2. Details are regulated by the ordinance. This also includes a catalog of optional concession terms.
1. The initial concession has a duration of 60 years from the commencement of operation of the facility.
2. If essential parts of an existing installation are reused as part of a concession renewal, the concession duration is 40 years.
3. In justified cases, the government may approve different concession durations.
1. The concessionaire is required to prepare an inventory for the concession municipalities and the canton of the assets subject to reversion as per Article 42 paragraphs 1 and 2. The inventory must be continuously updated in the event of actual or legal changes to these assets.
2. Any sale of assets subject to reversion during the ongoing concession period requires the approval of the concession municipalities and the canton.
3. Should the concessionaire sell assets subject to reversion without the approval of the concession municipalities and the canton, he shall compensate them for any damages incurred.
1. New or modified hydropower plants must be inspected within one year after they commence operation.
1. The owners of power plant facilities are liable under federal law.
2. The owners must obtain liability insurance for their liability from an insurer authorized to conduct business in Switzerland.
3. This proof of insurance must be provided for new facilities prior to the commencement of construction.
4. The specifics are regulated by the government.
1. All intended modifications to existing waterworks facilities must be reported to the granting municipalities and the government before they are carried out.
1. The owners of power plant facilities must maintain them in a good and operational condition at all times. All facilities must ensure the rational use of water resources within the scope of the concession.
2. The government, in agreement with the concession municipalities and after consulting the concessionaire, is authorized at any time to
a) order an inspection of the facilities as referred to in paragraph 1;
b) order the measures necessary for establishing and maintaining the condition prescribed in paragraph 1 and, if necessary, carry out replacements at the expense of the concessionaire.
1. If the concessionaire renews facilities subject to reclamation and demonstrates that the investments cannot be amortized by the expiration of the concession, municipalities and the canton may participate in the investments upon request.
2. The financial participation is based on an interest and repayment plan agreed upon with the concessionaire.
3. Municipalities and the canton can jointly order the renewal of the facilities.
4. If renewals as defined in paragraph 1 are ordered, the municipalities and the canton must participate in the investments. Paragraph 2 applies mutatis mutandis.
1. Municipalities are entitled to levy a one-time concession fee upon the granting, amendment, and transfer of concessions.
2. This fee amounts to 30 to 80 percent of the annual water fee owed to the concession municipalities in the event of full utilization of the granted water power. It is to be determined at discretion when no water fees are owed.
3. For concessions concerning pumping stations, municipalities are to be paid a concession fee of three to six francs per kilowatt of installed pumping capacity. The government may adjust these rates in accordance with changing circumstances.
4. If multiple municipalities are entitled to grant concessions for pumping stations, one-tenth of the one-time concession fee goes to those municipalities on whose territory the pumping pipelines are located, proportionate to their length share. The remaining nine-tenths are split equally between the groups of municipalities on whose territory the two basins are situated. The distribution within these groups of municipalities is based on the territorial municipality's share of the surface area of each basin, measured at the height of the dam's target level.
5. For the approval of the granting, amendment, and transfer of concessions, the canton is entitled to levy a state fee, calculated according to the principles in paragraphs 2 and 3. No state fee is imposed if a municipality utilizes its own waters.
6. If a concession duration other than that specified in Article 24, paragraphs 1 and 2 is determined, the concession and state fees are to be assessed according to the differing term.
7. For the extension of construction deadlines, both municipalities and the canton can independently levy a fee. This fee amounts to up to 20 percent of the annual water fee owed under federal law, and it is to be paid for each year of the extended construction deadline.
1. The municipalities and the canton are entitled to charge the concessionaire for the costs arising specifically from the processing of applications and the performance of supervisory functions.
2. The administrative fees amount to up to 50,000 francs. In justified cases, this amount may be reasonably increased. The government can adjust this rate to reflect changed circumstances.
1. Owners of power plant facilities that utilize water resources in the Canton of Graubünden are required to pay an annual water fee to the granting municipalities and a waterworks tax to the canton.
2. The water fee and waterworks tax are calculated according to federal regulations. The determination of the taxable gross output may also be based on the generated electrical energy. In this case, however, the usable water quantities and the gradient that are not utilized despite the concession must be added.
3. The water fee set by the municipalities must not exceed half of the federal maximum water fee.
4. The canton levies a waterworks tax equal to half of the federal maximum water fee.
5. The portion of the water fee to be delivered to the Confederation for ensuring compensation payments for losses in water power utilization is borne equally by the municipalities entitled to receive the water fee and the canton.
1. Owners of pumping stations are required to pay an annual pumping station tax to the concession municipalities and the canton.
2. This amounts to 0.075 cents per kWh of pump energy used for both municipalities and the canton, but at least 1 franc/kW for plants with 50 megawatts (MW) and above of installed pump capacity and 0.25 francs/kW for smaller plants. No tax is levied on pumping stations with an installed pump capacity of less than 1 MW.
3. In the first three years of operation, the government may reduce the minimum rate of 1 franc/kW pursuant to paragraph 2 by up to half for the canton.
4. The allocation of the pumping station tax among the municipalities is carried out in accordance with the principles applicable to the distribution of the one-time concession fee.
5. The government may adjust the pumping station tax to changing circumstances.
1. If the operation of a power plant is significantly impaired as a result of renewal works, the canton may temporarily and appropriately reduce both the waterworks tax and its share of the pumping station tax upon a justified request.
1. Power plant enterprises that seek approval for concessions and additional concessions, or the transfer or modification thereof, must provide the canton, without prejudice to the rights of municipalities to free and preferential energy, with one percent of the capacity and energy production of the facilities concerned by the approval decision, in exchange for payment of a corresponding share of the annual costs, for use within the canton. The energy supplied by the concessionaire within the canton is not to be considered when determining the extent of the entitlement.
2. The power plant enterprise may freely dispose of capacity and work not drawn by the canton.
1. The provisions of the cantonal tax law shall apply mutatis mutandis to the assessment, appeal, and penalty proceedings concerning the waterworks and pumping station tax.
2. The details are regulated by the government.
1. The concession terminates automatically upon the expiration of the agreed concession period.
1. The concession may be declared forfeited by the government in agreement with the concession municipalities if the concessionaire
a) fails to meet the deadlines imposed by the concession, particularly those for the financial statement, insurance certificate, as well as the construction and commissioning of the facility;
b) neglects the maintenance work prescribed by law and contract;
c) does not operate an existing facility for two years;
d) grossly violates important obligations despite a warning.
2. The concession municipalities can grant reasonable extensions of time with government approval.
3. The fate of the installations is governed by the reversion provisions of this law.
1. The concessionaire may terminate the concession by means of an express renunciation.
2. The fate of the facilities is determined according to the reversion provisions of this law.
1. The concession municipalities may agree on a right of repurchase with the concessionaire.
2. The repurchase agreement must include the following minimum content
a) Date of repurchase;
b) Repurchase compensation or detailed criteria for its determination;
c) Notice period for the declaration concerning the exercise of the repurchase, which must be at least five years;
d) In the case of involvement of several municipalities: required quorum for the exercise of the right of repurchase.
3. The shares of several municipalities are determined according to their shares in the granted hydropower. The share of the canton corresponds to half ownership in common.
1. If the concession ends due to the expiration of its duration, forfeiture, or renunciation, the facilities constructed on public or private land for damming, capturing, supplying, discharging, or circulating the water, including the turbines and pumps along with the buildings in which they are housed, and the appurtenances as well as the properties and rights on third-party land serving the operation of the works shall revert gratuitously and free of encumbrances, each half to the canton and the granting municipalities.
2. Upon reversion, the granting municipalities and the canton are entitled to take over the facilities intended for generating and transmitting electrical energy, including the service houses and administrative buildings, against appropriate compensation. The concessionaire may demand the takeover of these facilities if they are advantageously usable for the further use of hydropower.
3. Works primarily operated for local supply are exclusively subject to the reversion provisions determined by the municipalities.
4. Municipalities and the canton have the authority to waive the exercise of the right of reversion.
5. If the concessionaire's facilities are not reused in whole or in part after the waiver of the right of reversion, the concessionaire is obliged to conduct the necessary safety and restoration work at their own expense.
1. The shares of several municipalities in the reversion are determined according to their shares in the granted hydropower. The municipalities among themselves or in relation to the canton become co-owners of the reversion objects. For pumping stations, unless otherwise specified in the concession, the distribution key according to Article 31, paragraph 4 applies.
2. If municipalities wish to waive their share in the facilities upon reversion, the remaining concession municipalities are entitled to take over these municipalities' shares for compensation. Only if the remaining municipalities waive their rights does the canton have the same right.
1. The determination of compensation for the reversion of facilities for the generation and transmission of electrical energy is the responsibility of the municipalities, the canton, and the concessionaire. It shall be carried out according to the generally recognized principles of business valuation applicable at the time.
2. Upon the request of the canton and municipalities, the concessionaire is obligated at any time to provide all documents and information, such as annual depreciation, reversion reserve, and renewal accounts, that are necessary for the calculation of the compensation.
3. The tax records of the concessionaires shall be open for inspection by the competent department and the municipalities.
1. If a concession is renewed with a waiver of the reversionary rights, the concessionaire is obligated to compensate the party entitled to reversion for the waiver of the claim to the installations that revert gratuitously. This regulation also applies to public entities with a claim to concession renewal. The determination of the compensation is the responsibility of the municipalities, the canton, and the concessionaire.
2. Article 44 applies mutatis mutandis.
1. The assessments regarding the reversion, repurchase, and any potential renewal of the concession are jointly undertaken by the municipalities and the canton. They agree on the coordination lead.
2. The costs of these assessments are generally borne by the canton.
1. If the modalities for the use of hydropower concerning the expiration of a concession have not yet been established, the government, after consulting the municipalities, shall, ex officio or upon a corresponding request, take provisional measures that allow the continued operation and maintain an actual or legal situation or safeguard endangered interests.
1. A concession renewal may occur at the time of expiration or before the expiration of an existing concession.
2. The concession municipalities and the canton have the right to be informed by the current concessionaire, eight years before the concession expires, whether they are interested in a renewal of the concession.
3. If the current concessionaire submits an application for concession at least ten years before the concession expires, the concession municipalities must decide within two years whether they are willing to enter into a renewal application. If they do not adhere to this timeframe, the duration of the existing concession is extended by the duration of the delay.
1. Anyone who intends to undertake preparatory work, staking, water measurements, and other investigations in connection with the creation of a concession project requires the approval of the competent authority.
2. The responsible department must be notified before the commencement of the preparatory work.
3. The landowners are obliged to tolerate the execution of these preparatory works. Any resulting damages and disturbances must be fully compensated. If necessary, this will be determined according to the procedures outlined in the cantonal expropriation law.
1. Applications for the granting, amendment, or transfer of a water rights concession must be submitted to the affected municipalities. The applicant must simultaneously inform the government about the submission of the application.
2. The municipalities and the canton strive for close cooperation.
1. The concession procedure is governed by the regulations of the affected municipalities.
2. Reserved is the compulsory grant according to Article 12, for which only the concession approval procedure must be carried out.
1. The application for the approval of the granting, amendment, or transfer of a concession shall be submitted to the competent department for the attention of the government.
2. Details are governed by the implementing provisions.
1. The application for approval and any applications for additional permits necessary for the realization of the project are to be made publicly available at the competent department and the affected municipalities for 30 days, along with the relevant documents and any environmental impact report.
2. The announcement must be published by the competent department in the cantonal official gazette and by the affected municipalities following local practice.
3. The publication must include a notice that objections to the project can be submitted in writing to the government during the public display period. Objections should be addressed to the competent department for the attention of the government.
4. If the project underlying the concession approval application already includes the development required for construction projects, the competent department orders the profiling during the public display period.
1. Entitled to Object Are
a) Anyone affected by the concession project who has a legitimate interest in its implementation, prevention, or modification;
b) The affected municipalities;
c) Environmental protection organizations, which have been granted the right to lodge complaints under federal law, provided and to the extent that they have the opportunity to file an administrative appeal to the Federal Court against the final cantonal decision on the matter.
1. The granting, modification, or transfer of a concession requires the approval of the government based on an examination of the legal requirements and a consideration of all relevant public interests.
2. Simultaneously, the government renders a decision regarding any potential objections.
3. Objections of a private legal nature are referred to civil court proceedings.
4. In the event of approval, the government issues all necessary permits for the realization of the project, insofar as this is possible based on the stage of project development. This especially applies to construction and exemption permits under planning law.
1. The concession approval decision, the environmental impact report, and the assessment by the cantonal environmental protection agency will be made publicly available for a period of 30 days at the responsible department. Legal confidentiality obligations and the right to access the files by those entitled to appeal are reserved.
2. The publication must be announced in the Cantonal Official Gazette, with a reference to any additional permits that may have been granted.
3. The concession approval decision can be appealed to the Superior Court within 30 days. The right to appeal is also available to the municipalities.
1. The provisions of Articles 52 and 53 paragraphs 1 to 3 shall apply mutatis mutandis to the submission, public disclosure, and publication of the project approval request, as well as regarding the right to object. The right to object is governed by Article 54.
1. During the project approval process, the government decides on all additional outstanding permits required for the implementation of the project, particularly including the construction and exceptional permits according to planning law.
2. If all additional permits could already be granted with the concession approval decision, the project approval procedure is omitted.
1. Article 56 applies mutatis mutandis to the public disclosure of the project approval decision and the appeal procedure.
1. The right of expropriation may be invoked for the construction and modification of hydropower plants.
2. The right of expropriation is granted by the government together with the concession approval decision.
3. The procedure and the obligation to compensate are governed by the Federal Law on Expropriation.
1. Violations of this Act, its implementing provisions, and the orders and decisions based thereon shall be punished by the department responsible for hydropower utilization with a fine of up to 100,000 Swiss Francs.
2. Negligent violations, attempts, and aiding and abetting are punishable.
3. In minor cases, punishment may be waived.
4. The procedure is governed by the provisions of the Administrative Procedure Act.
5. The rights of the government to declare the concession forfeited and the right to substitute performance remain reserved.
1. If offenses are committed for the benefit of a legal entity, the legal entity shall be fined.
2. The punishment of the acting executives or representatives is reserved.
1. The government may remove facilities that have been constructed in violation of the law, its enforcement provisions, and any orders and decisions based thereon, at the expense of the responsible party, and may also restore the original condition.
1. The Grand Council shall enact the implementing provisions required for this law. These shall enter into force simultaneously with the law.
1. The Law Concerning the Use of Public Waters of the Canton of Graubünden for the Establishment of Waterworks dated March 18, 1906, is hereby repealed.
1. With the entry into force of this law, all concession-requiring projects on which the concession authorities have not yet decided shall be assessed according to the new provisions.
1. This law applies to existing concessions, provided that it does not infringe upon vested rights.
1. For concessions granted prior to the partial revision of May 9, 1954, the reversion provisions of those concessions remain applicable. If such concessions provide for a right of reversion, the canton participates in the reversion; however, only in proportion to half of the remaining, unexpired period relative to the total duration of the concession. Article 43, paragraph 2 is applicable to such concessions.
2. For concessions granted after the partial revision of May 9, 1954, the reversion provisions pursuant to this law apply.
1. The proof of insurance pursuant to Article 27, Paragraph 2, must be provided for existing structures and structures under construction within two years after the law comes into effect.
1. The inventory of the reversion burdened infrastructure components pursuant to Article 25, paragraph 1, must be submitted to the competent department within two years after the law enters into force for existing concessions.
**1. This Act shall be enacted by the government upon approval by the people.**