Art. 40 Spatial Planning Ordinance for the Canton of Graubünden (KRVO) - Construction Projects Not Requiring a Building Permit
Art. 40 KRVO - Construction Projects Not Requiring a Building Permit · Construction Projects Not Requiring a Building Permit
1. Provided that the provisions of substantive law are observed, the following construction projects do not require a building permit
1. Repair and maintenance work on structures and facilities that can be used as intended, provided they only serve to maintain value and the structure and facility do not undergo any alteration or change of use;
2. Minor changes inside buildings and facilities, except for changes in usable area or the number of rooms, except outside zoning areas;
3. Changes of use without significant impact on the usage regulations, except outside zoning areas;
4. Re-roofing with the same or similar roofing material;
5. Buildings with a volume of up to 5 m³ (small constructions) and bicycle shelters with a floor area of up to 4.0 m²;
6. Structures and facilities not erected for more than six months per year, such as
a) Catering and sales venues;
b) Service stations for sports and leisure equipment;
c) Stalls, huts, booths, tents for festivals, demonstrations, exhibitions, and other occasions;
d) Playgrounds for children;
e) Small ski lifts, ski conveyors, natural ice rinks;
f) Facilities for racetracks and trendy sports;
g) Road advertisements;
h) Unlit advertisements on tourist facilities with an area up to 5 m²;
7. Igloos, teepee tents, and the like for overnight stays in ski areas during the winter season or on farms from May to October, provided no permanent sanitary facilities are installed;
8. Garden design facilities such as footpaths, garden squares, blinds, stairs, fireplaces, biotopes, plant troughs, art objects, flagpoles, except outside zoning areas;
9. Advertising facilities such as company signs, display cases, illuminated advertisements, and information boards with an area up to 1.5 m²;
10. Satellite reception systems for radio and television with an area up to 1.5 m²;
11. Signs and boards such as traffic signals, street signs, hiking trail markers, surveying marks;
12. Unlit signs such as crosses up to 3.0 m in height, art objects;
13. Technical equipment like street lighting systems, switch boxes, hydrants, measuring devices, posts, poles, benches;
14. Safety devices such as
a) Snow retention nets along traffic routes;
b) Safety fences, nets, barriers, padding, and similar for sports and leisure facilities;
c) Safety railings;
15. Access facilities, as far as they have been profiled and defined within the framework of planning with the accuracy of a building application;
16. * Non-reflective solar systems on facades according to the state of the art with an absorber area of up to a maximum of 6.0 m² per facade within zoning areas and up to a maximum of 2.0 m² outside zoning areas;
17. * Terrain alterations up to 1.0 m in height or depth and a changed cubature of 100 m³;
18. Enclosures up to 1.0 m in height and retaining and support walls up to 1.0 m in height, except outside zoning areas;
19. Movable pasture fences during grazing time;
20. Foundation-free shelters and similar up to 25 m² ground area for livestock, foundation-free plastic tunnels, and milking stands, as well as similar facilities for agriculture and horticulture such as small devices for the sale of products;
21. Material depots that are set up only once a year for a maximum of four months;
22. * Construction site installations, provided they do not cause significant emissions, except for worker accommodations and mobile concrete plants.
2. The exemption from the building permit requirement does not apply to construction projects planned in hazard zones that serve the residence of humans and animals, as well as generally for construction projects that could endanger bodies of water, water protection zones, and moor biotopes.
3. The exemption from the building permit requirement does not exempt from compliance with substantive law provisions and obtaining other approvals. If there are indications that a construction project without a permit might violate substantive law provisions, the municipal building authority initiates the building permit procedure ex officio, at the request of the specialist department, or on the advice of third parties.
4. Structures and facilities pursuant to paragraph 1 numbers 6, 7, 19, 21, and 22 are to be removed after the permissible duration, and those pursuant to number 14 after use. The claimed land must be restored to its original condition. The removed construction or facility parts must be disposed of or stored in a permissible location.