Art. 87 Regulation Implementing the Act on Spatial Planning and Construction (ReLATeC) - Exemption from Authorization (Art. 135 Sec. 3 RPBG) - In General
Art. 87 RPBR - Exemption from Authorization (Art. 135 Sec. 3 RPBG) - In General · In General
1. No Building Permit is Required for
a) Maintenance, repair, and renovation work on the roof and facade that do not significantly alter the appearance of the structure;
b) Minor ancillary installations such as satellite dishes, uncovered garden terraces, private garden fireplaces, private children's playgrounds, and seasonal swimming pools that are dismantled at the end of the season;
b1) Charging stations for electric vehicles in connection with a single-family home according to Articles 55 and 56;
c) Garden and outdoor space designs or installations such as stairs, fountains, sculptures;
c1) Summit crosses with a maximum height of 2 meters;
d) ...
e) Greenhouses and tunnels for vegetable and garden cultivation with a seasonal character that are dismantled at the end of the season;
e1) Structures and installations temporarily erected for a period of no more than three months for tourism or recreational purposes;
e2) Within the building zone
1. Wood sheds, garden houses, containers for rainwater collection, and private greenhouses with a maximum floor area of 6 m² and a maximum total height of 2.50 m, provided they are erected at a distance from the neighboring property that is at least half of their height;
2. Green pergolas of 12 m² and a maximum total height of 2.50 m, provided they are erected at a distance from the neighboring property that is at least half of their height;
3. Woven and lattice fences;
f) Caravans and mobile homes in zones designated for this purpose by local planning.
g) Solar installations on buildings in work zones, which are subject to the notification procedure according to paragraph 3.
2. The Simplified Procedure applies, however, if the buildings and installations listed in letters b-e2 are located in the following areas
a) At a distance of less than 20 meters or any other lawful distance from a waterfront area (lake and watercourses), forest, a nature reserve, or a protected natural object;
b) At a lesser distance from a public road than that applicable under the Mobility Act of November 5, 2021;
c) In the water area;
d) In an area that is the subject of a protection measure;
e) Within an archaeological perimeter;
f) In a wildlife corridor;
g) Near a protected building.
3. Solar installations exempt from permits under federal law and those on buildings in work zones must be notified to the municipality thirty days before construction begins. The plans and documents that must be attached to the notification are specified in the Directorate's guidelines (Art. 89 para. 2).
4. Changes of use according to the Federal Legislation on Second Homes (Art. 7 ZWV) must be reported in writing to the senior official within 30 days of moving in. The senior official notifies the land registry office of the change of use ex officio, so that it can amend the annotation.