Regulation Implementing the Act on Spatial Planning and Construction (ReLATeC) - General Provisions (RPBR)
Table of Provisions (139)
Statutory Text (139 Articles)
1. If a planning or construction project requires decisions from several authorities, the authority responsible for the main decision ensures process coordination.
2. The authority responsible for coordination
a) issues the necessary procedural directives;
b) ensures that all information required to verify the legality of the project is obtained;
c) ensures that there is substantive alignment of the various decisions so they do not contradict each other.
3. Before decisions are made on objections, appeals, plans, regulations, or building permit applications, the Directorate for Spatial Development, Infrastructure, Mobility, and Environment (the Directorate), the Chief Administrative Officer, and the municipality weigh the affected interests. Any differing viewpoints from the consulted offices and bodies must be considered in the reasoning for the main decision.
4. The other decisions made during the procedure are announced simultaneously with the main decision.
1. The Construction and Spatial Planning Office (CSPO) ensures coordination in the areas of spatial planning and construction. It monitors compliance with the deadlines set for the consulted offices and bodies based on these regulations.
2. Within the framework of the cantonal land use plans, local plans, detailed construction plans, as well as in the ordinary building permit process, the CSPO drafts a reasoned opinion for the decision-making authority. It consolidates the reports prepared by the consulted offices and bodies into a comprehensive report and comments on the project's admissibility; in doing so, it takes into account the legal framework, the interests involved, and all concrete circumstances of the case.
3. The offices ensure coordination in the application of the legal provisions within their area of responsibility. In particular
a) they ensure that the federal authorities are consulted in a timely manner, to the extent required by federal law;
b) they comment on the admissibility of the project, notably by verifying its compliance with the legal provisions of their area of responsibility, and, if necessary, by setting clear conditions in their statement, allowing the decision-making authority to perform a balancing of interests.
1. The planning authorities shall compile all documents related to the same project into a joint public display and/or consultation.
2. The duration of the public display for a building permit application is 30 days if, simultaneously with the application, a plan, a regulation, a deforestation request, or an exceptional permit from a nature and landscape conservation provision must be made public, or an environmental impact report must be submitted for consultation.
**1. If a planning project extends over the territory of multiple municipalities, they shall ensure a substantive coordination and a simultaneous issuance of the orders.**
2. The municipalities shall request the involvement of the senior official if they are unable to ensure substantive coordination of their orders.
3. The senior official shall attempt to facilitate an agreement between the municipalities. If unsuccessful, the official shall set a deadline for the municipalities to issue their orders. Upon expiration of the deadline, the official shall submit the records, along with the official’s report and the municipal orders, to the department.
1. Submission of regional plans and local plans is permitted for individuals who are registered in the A or B planner register of the REG (Foundation of the Swiss Register of Professionals in the fields of Engineering, Architecture, and the Environment).
2. Submission of detailed development plans is permitted for individuals who are registered in the A or B planner, architect, and engineer registers of the REG.
1. The Construction Project, the Building Application, and the Compliance Certification must be prepared by the following qualified individuals
a) For buildings, individuals registered in the Architects' Register A or B of the REG are authorized.
b) For civil engineering works, including structures of an industrial nature where the role of the civil engineer predominates, individuals registered in the Engineers' Register A or B of the REG or in the Federal Surveyors' Register are authorized.
1. For works of a special nature that cannot predominantly be classified as vertical or horizontal structures, such as agricultural, industrial, sports, and energy facilities, the qualification pursuant to Article 6 may also be granted to specialists or companies that are specialized in this field.
2. Construction projects subject to simplified procedures may be drafted by persons who are not qualified under Article 6, provided that the dossier is professionally prepared and complies with the applicable regulations.
3. The persons authorized pursuant to paragraphs 1 and 2 shall provide the office with the necessary information concerning their activities, such as production programs, work descriptions, brochures, types of plans, etc.
**1. The principles particularly concern:**
a) the settlement areas;
b) the economic development;
c) tourism and the corresponding infrastructure;
d) buildings and facilities of public interest;
e) immovable cultural property;
f) mobility;
g) agriculture and buildings outside of the construction zone;
h) the management of natural resources;
i) the forested area;
j) nature and the landscape;
k) natural hazards;
l) the environment.
1. The Directorate prepares the cantonal master plan for the attention of the Council of State.
2. It ensures the establishment of appropriate structures to guarantee the adequate participation of all interested parties in the development of the plan.
1. After the State Council has been informed of the draft of the cantonal structure plan, it decides on the public consultation.
2. The draft of the cantonal structure plan is made available for public consultation for two months at the office, district offices, and in the municipalities. The announcement is published in the official gazette.
3. The Directorate simultaneously submits the draft to the federal government and neighboring cantons for preliminary examination.
4. The Directorate organizes public information events in the case of significant amendments to the cantonal structure plan.
1. During the consultation period, any interested person may submit written comments or reasoned proposals to the Directorate, the Prefecture, or the Municipality.
2. The Prefectures and Municipalities collect the comments and proposals submitted to them and forward them to the Directorate.
3. The Prefectures and Municipalities shall submit their opinions to the Directorate within one month after the end of the consultation.
1. In the event of a significant disagreement between a municipality and the directorate, the directorate will, based on a preliminary draft of the consultation report, submit its opinion to the municipality and grant it the opportunity to be heard by the Council of State.
1. After the conclusion of the consultation procedure, the Directorate prepares the consultation report, in which it also responds to the comments and suggestions. This report is appended to the dossier for the attention of the State Council.
2. The Directorate prepares the final draft of the cantonal master plan. In the event of significant changes to the plan, the Directorate submits it to the municipalities; they make their statements to the State Council.
1. The cantonal master plan shall be adjusted to the necessary extent if new circumstances require it.
2. In the event of a comprehensive amendment to the plan, the procedure provided for the preparation of the cantonal master plan shall apply.
3. Minor amendments, particularly updates and formal adjustments to new legislation, shall be adopted by the Council of State without public consultation. They shall not be submitted to the Federal Council for approval but will be communicated to it after adoption.
1. Amendment of the Structure Plan intending the creation or amendment of a project sheet concerning a project with significant impact on space and environment (Art. 8 para. 2 of the Federal Act of 22 June 1979 on Spatial Planning), is subject to a public consultation period of one month. The notification will be published in the Official Gazette. The draft amendment is submitted to the BRPA and to the affected district offices and municipalities.
2. During the consultation period, the municipalities affected by the project and the concerned regional bodies, adjacent municipalities, and interested parties may submit written comments and reasoned suggestions to the Directorate. Articles 12 and 13 apply mutatis mutandis.
3. The new project sheets according to paragraph 1 are the subject of a report presented to the Grand Council for information.
4. If the drafting of a new project sheet concerning a project according to paragraph 1 requires a change in the objectives or principles according to the cantonal structure plan, this follows the ordinary procedure according to Articles 10-14.
1. The cantonal land use plan is prepared by the BRPA for the attention of the Directorate. The BRPA ensures cooperation with the relevant authorities.
2. During the public inspection period, the dossier is made available at the Directorate as well as with the affected municipalities and administrative offices.
3. After the publication of the approval decision, the dossier is deposited with the BRPA and can be inspected there.
4. Additionally, Articles 30-33 and 36 paragraphs 1 and 2 apply mutatis mutandis.
1. The affected municipalities must adapt their local plans to the cantonal land use plan.
2. The Directorate reviews the cantonal land use plan at least every 15 years. In this context, it prepares a report for the attention of the Council of State.
1. The regions may develop regional principles for specific areas affecting spatial planning.
1. The work program serves to determine the scope of the tasks of the regional structure plan. It analyzes the current state of the regional area, identifies the aspects to be examined, and outlines the methodology for developing the basics (stages, costs, public information and participation).
2. The work program is prepared no later than before the start of the creation of the regional structure plan.
3. The program is submitted to the BRPA, which consults the relevant administrative offices. The BRPA forwards the received opinions to the regional body responsible for drafting the regional structure plan according to the statutes, with indications of any necessary additions that need to be made.
1. Articles 9 et seq. apply mutatis mutandis. With the exception of transmitting the dossier to the neighboring cantons, the tasks that are carried out by the Directorate according to these Articles are assumed by the regional body, which is responsible according to the statutes for the development of the regional master plan. The regional body also conducts the consultation procedure.
2. The Directorate publishes the State Council's approval decision on the regional master plan in the Official Gazette.
1. The necessary cadastral base maps for the development of local and detailed building plans are created and updated based on the geodata from official surveying.
1. The explanatory report demonstrates the legality of the planning measures and their conformity with the objectives and principles of spatial planning, and establishes their impact in the area of development. It must allow for the verification of whether the overarching planning instruments and the requirements of the federal and cantonal special legislation, as well as the comments of the population, have been appropriately considered.
1. The overview provides information about the developed zones and the state of infrastructure development in the undeveloped zones. It takes into account the development program.
2. The overview indicates which parts of the building zone are immediately buildable, considering the planning and infrastructure development undertaken, and which parts will be buildable in five years or at a later date.
3. The overview must be updated at least every five years.
1. The transportation network includes motorized private transport, public transport, non-motorized transport (at least bicycle and pedestrian traffic), as well as vehicle and bicycle parking spaces.
1. The Parking Space Concept determines the measures for the qualitative and quantitative management of parking spaces. The Parking Space Concept is developed taking into account
a) the planning objectives;
b) the permissible impacts on the environment;
c) the protection of immovable cultural assets;
d) the allowable traffic load on the road network;
e) the provision of public transport and non-motorized traffic;
f) the potential for multiple uses of parking spaces.
2. The Parking Space Concept is part of the Municipal Master Plan. It must be included in the Municipal Master Plan if the municipality
a) is located within an agglomeration, or
a)bis is included in the action plan according to the Federal Act on Environmental Protection, or
b) has at least 5,000 inhabitants, or
c) is a tourist location of cantonal significance.
1. If a municipality makes a revocation decision pursuant to Article 47 paragraph 2 RPBG, it publishes this in the Official Gazette and grants the affected individuals a period of 30 days to submit a statement. After this period, it forwards the adjusted plans, an additional explanatory report, and any statements received to the Directorate.
2. The Directorate approves the restoration of the original use of the land if it complies with legal requirements and overarching plans, and is appropriate. It publishes its decision in the Official Gazette within ten days from the date of approval.
1. The provisions of the municipal regulations specifically determine
a) the character and the purpose of each zone;
b) the objectives that are to be achieved with detailed development plans declared mandatory under the zoning use plan;
c) the possibilities, the restrictions and building prohibitions, as well as other limitations of property rights;
d) the land use density;
e) the construction method and the dimensions of the buildings;
f) the distances;
g) other provisions regarding the location and volume of the buildings;
h) regulations concerning the architectural character;
i) the dimensioning and management of parking spaces.
2. The requirements of special legislation are reserved.
3. No minimum area for plots can be defined in the regulations.
1. The municipal regulation, based on the standards of the Swiss Association of Road and Traffic Experts (VSS), sets out the number of parking spaces that must be created, taking into account the type and use of the buildings. If the municipality deviates from these standards, it must justify its choice in the explanatory report according to Article 21.
2. The municipalities affected according to Article 24 determine, based on the parking concept, the minimum and maximum number of parking spaces as well as their use and management.
1. Deviations according to Article 65, paragraph 2 of the RPBG also apply within the perimeter of the framework detailed development plan, including in sub-perimeters that are not subject to a detailed development plan. The framework detailed development plan specifies the permissible deviations in these sectors to ensure the consistency of the planned constructions with the overall urban development concept.
1. A detailed development plan must be prepared for
a) Projects that generate more than 2000 motor vehicle trips daily (with heavy traffic being counted twice);
b) Shopping centers with a sales area of 3000 m² or more;
c) Sports centers of regional interest;
d) Ports subject to environmental impact assessment;
e) Camping and caravan sites with an area of 5000 m² or more.
2. Furthermore, the Directorate or the municipality may require the preparation of a detailed development plan if, during the construction procedure, conflicts arising from the application of special legislation in consideration of local conditions cannot be resolved by the municipal building regulations. The relevant authorities shall be consulted in advance. Article 66 paragraphs 2 and 3 RPBG remain reserved.
1. The Directorate issues guidelines that establish what must be included, at a minimum, in the dossier for local plans, for detailed development plans, and for their modifications.
2. If a dossier for a local planning or detailed development plan does not meet the requirements set out in the guidelines, the BRPA returns it to the municipality so that the necessary corrections and additions can be made.
1. During the preliminary and final examination, the BRPA requests opinions from the relevant authorities and bodies. These entities provide their statements within one month of receiving the dossier, provided the plans and their regulations are complete, comply fully with the laws and regulations, and present no particular difficulties. If necessary, the BRPA may set deadlines for the consulted authorities and bodies.
2. As part of the final examination, the BRPA also obtains the necessary approvals from the competent authorities in accordance with special legislation.
1. The sector benefiting from the exchange within the construction zone must
a) lie in continuation of the existing lawful construction zone;
b) be located in a sector that has a development quality with public transportation of at least Level D, and
c) have a floor area ratio (Art. 130 para. 1 RPBG and Sec. 8.2 Annex IVHB) set in the municipal building regulations at a minimum of 1.0, or possess regulatory provisions that allow for an equivalent density.
1. At the conclusion of the consultation, the municipal council or a delegation of the municipal council shall hear the intervening parties.
2. After hearing the intervening parties, the municipal council shall take a position on the outcome of the consultation. This statement shall be added to the dossier for the attention of the directorate.
1. If the conditions under Article 83 paragraph 3 of the law are met, the municipal council grants the appellants a period of 15 days to designate one or more representative persons.
2. After the conclusion of the public display, the appellants are summoned to a conciliation hearing before a delegation of the municipal council. The result of the negotiation is recorded in a protocol, which is delivered to all appellants. The appellants may comment on its content within ten days.
3. The municipal council is not obliged to conduct a conciliation hearing if
a) objections justified by public interests are raised in large numbers and can thus be equated to a popular complaint; or
b) the objection is obviously inadmissible (late submission, lack of legitimacy, etc.); or
c) the appellant acts in an abusive manner.
1. The right to object and file complaints is also granted to associations pursuant to Articles 60 et seq. of the Swiss Civil Code under the following conditions
a) the association has existed for at least 20 years at the time it asserts its rights, and
b) it has a statutory purpose of advocating for appropriate spatial planning and economical land use and/or for the implementation of high-quality development projects.
2. The association is authorized to object and file complaints only in those legal areas that have been part of its purpose according to its statutes for at least 20 years.
3. The State Council shall establish the list of such associations by way of a resolution.
1. In the case of Article 86, Paragraph 2 RPBG, the Directorate publishes the elements that it does not intend to approve or reintegrate into its decision in the Official Gazette and communicates this to the affected municipality. It grants the municipality and the affected individuals a period of 30 days to submit any statements they may have.
2. During this period, the dossier, including the reports from the consulted authorities and bodies and the overall assessment, will be deposited with the BRPA and can be inspected there.
1. The municipal council adopts the plans and their regulations within a period of no more than six months from the conclusion of the public display.
2. Provided the dossiers do not present any particularities (negative opinion, complaint, exercise of the right to be heard according to Article 34), the Directorate approves the plans and their regulations within two months from the time when the BRPA has all the responses from the consulted authorities and bodies, as well as any additional studies that may have been requested.
Art. 73 Publication and Deposit
1. The approval decision for the municipal planning plan, the development program, the zoning plan and its regulations, as well as the framework detailed development plan, shall be published by the Directorate in the Official Gazette within 30 days from the date of approval.
2. The planning dossier and the accompanying regulations shall be deposited with the municipal administration and with the BRPA and can be inspected there.
3. The publication shall indicate that an appeal can be filed with this authority against the points of the approval decision by the Directorate, which are directly appealable to the cantonal court.
1. Owners who agree to undertake a parcel rearrangement submit the preliminary project to the BRPA, which obtains the opinions of the competent authorities and the municipality. The project is then submitted to the Directorate for approval.
2. The municipal council submits the preliminary project for rearrangement to the chief officer. The chief officer forwards it to the BRPA, which, after consulting with the competent authorities, provides its opinion.
1. The municipal council convenes the interested property owners to an informational meeting and provides them with information regarding the perimeter of the land redistribution, as well as the objective, type, estimated costs, duration, and principles of cost distribution.
2. The dossier of the preliminary project will be made available for public inspection at the municipal administration and the district office for a period of 30 days, with the provisional perimeter included.
3. Following the informational and consultation procedure, the property owners of the plots within the provisional perimeter will be summoned by the municipal council to a meeting via registered letter and announcement in the official gazette.
1. In the assembly, a member of the municipal council, or the senior officer if the reallocation concerns several municipalities, shall preside.
2. Voting by correspondence is permitted.
3. The provision of Article 107, paragraph 3, sentence 3 of the Regional Planning and Building Act (RPBG) does not apply to owners who could not be reached through the invitation.
4. Co-ownership and joint ownership are considered as individual ownership.
5. Once the reallocation is decided, all measures that could alter the value or purpose of the properties or impede the execution of the works are prohibited without the consent of the Directorate.
1. The administrative bodies of the cooperative are the General Assembly, the Board, and the Auditors.
2. The General Assembly is composed of all owners of the plots to be reallocated or the persons representing them.
3. It makes decisions by a majority of the members present.
4. It elects the President, the board members, the Secretary, the Treasurer, and the Auditors. It appoints the Appraisal Commission and the specialists. The specialists are responsible for drafting the projects and overseeing their execution.
5. The statutes regulate the areas of activity of the various cooperative bodies, namely the duties, organization, and mode of representation, the powers of the General Assembly and the Board, as well as the method of financing the administrative and execution costs.
6. The municipal council is represented on the Board by a delegate with an advisory vote.
1. The Valuation Commission consists of three members and one or more substitute members, who have no conflict of interest with the ownership.
2. The appointment of the Valuation Commission requires confirmation by the municipality and the directorate.
3. The primary task of the Valuation Commission is to determine the final perimeter, assess the value of the properties, and allocate the new parcels in agreement with the board and the experts. Additionally, it distributes the costs of the reallocation that fall to the ownership.
4. The Valuation Commission may terminate or modify easements and ground charges to the extent necessary for reallocation or development. It may also establish new easements or ground charges. The retained easements and ground charges will be adjusted and transferred to the new ownership status.
5. The Commission examines objections resulting from public postings according to Article 109 RPBG and hears the objectors before making a decision.
6. If the cooperative realizes the developments, the bylaws may assign the Commission with the distribution of these costs among the participants.
1. The general assembly designates a licensed geometrist engineer or a licensed geometrist engineer and, if necessary, an engineer and a planner as experts.
2. The experts have only an advisory voice in the appraisal commission.
3. Ownership and individuals with connections to the ownership cannot be designated as experts.
1. The board of directors manages the company with the cooperation of the specialists and the appraisal commission; the powers of the general assembly remain reserved and the municipality has supervision.
2. The management exercises overall supervision over the company.
1. The approval of the statutes by the State Council grants the cooperative legal personality and binding character to the enterprise for all owners and all other holders of real rights concerning properties within the perimeter.
2. The cooperative is endowed with the right of expropriation for the realization of public utility works.
3. The municipality requires, ex officio, the annotation of the enterprise in the land register for all properties located within the perimeter.
1. The expropriation of land for public facilities and structures that do not primarily serve the interests of the owners of the redistributed land entitles the owners to compensation according to the provisions of expropriation. An exception remains in cases where the public entity is the owner of the land within the redistribution perimeter.
2. The land reserved for development facilities shall be allocated to the ownership if it is not immediately acquired by the public entity.
1. The areas allocated to several owners are also proportionately credited to them.
2. If certain parcels are too small for an appropriate planned use, their owners are compensated according to the provisions on expropriation, and the land is allocated to the other owners, unless allocation as a collective or joint ownership, with or without condominium ownership, is desired or possible.
3. The affected parties are given the opportunity in due time to express their preferences regarding the reallocation, without being able to demand allocation in the same location.
4. If there is a significant value difference between the contributed and allocated land, an appraisal is conducted, followed by an allocation based on this appraisal.
1. If the reallocation does not allow for real compensation, the excess or shortfall allocations shall be compensated in cash.
2. If the public entity receives more land for its public buildings and facilities than it could be allocated based on its contribution, it must compensate this surplus according to the provisions on expropriation.
1. The statutes or regulations of the land readjustment may mandate the transfer of advance payments, the amount of which is determined by the general assembly or, in the case of an ordered land readjustment, by the municipal council.
2. Article 108, paragraph 3 of the RPBG also applies to owners of land located outside the perimeter who benefit from the land readjustment or development carried out by the cooperative.
3. The board of the cooperative may request the registration of a legal mortgage right as per Article 108, paragraph 3 of the RPBG.
1. The board may decide on the early, complete, or partial assignment of possession based on the opinion of the assessment commission.
2. The assignment of possession may only occur if the public deposit procedures pursuant to Article 109 RPBG have been completed.
1. The approval is communicated to the affected parties by the board.
2. The approved transitional land register is submitted to the land registry office along with the application to record the new status.
3. In accordance with Article 802 of the Civil Code, the land registrar transfers the liens encumbering the old properties to the new parcels.
1. The organization of the mandated reallocation is determined by the regulations approved by the State Council.
2. The municipal council appoints the appraisal commission and the experts in accordance with Articles 41 and 42.
3. These appointments are submitted to the Directorate for approval.
**1. The Cantonal Added Value Fund primarily serves to cover the financing of all compensation owed for material expropriation according to Article 113c para. 2 let. a RPBG, up to the available amounts.**
**2. Objects pursuant to Article 113c para. 2 let. b-d RPBG can only be financially supported once the amounts accumulated in the fund exceed 20 million Swiss francs.**
**3. From this point onward, the new amounts allocated to the fund shall be distributed as follows:**
**a) 60% for the financing of compensation owed for material expropriation;**
**b) 20% for the financing of regional master plans or their revision, agglomeration programs, and studies according to Article 113c para. 2 let. b RPBG;**
**c) 10% for the financing of infrastructures pursuant to Article 113c para. 2 let. c RPBG;**
**d) 10% for the financing of additional spatial planning measures according to Article 113c para. 2 let. d RPBG.**
1. The Fund is financed by
a) the levies collected in accordance with Article 113a, paragraphs 1 and 2 of the RPBG;
b) the reimbursements and repayments of the allocated financial support in accordance with Article 51h;
c) the income from the Fund's assets.
1. The operating expenses pursuant to Article 113c paragraph 2 RPBG particularly include
a) personnel costs;
b) information technology costs;
c) mandates for the appraisal of the market value, which is to be determined for the calculation of the contribution pursuant to Article 113d paragraph 1b RPBG.
1. The annotation shall be deleted upon request of the Cantonal Tax Administration (CTA), with the consent of the Directorate, in the following cases
a) after full payment of the value added levy;
b) when the processing of the dossier leads to the conclusion that no levy is owed.
1. The Directorate makes all decisions in accordance with the provisions of this section.
2. The administrative management of the Fund is the responsibility of the BRPA. Specifically
a) it ensures the supervision of the Fund so that it is regularly replenished, particularly by verifying the contribution payments;
b) it maintains its own accounting for the Fund;
c) it does not make any expenditure that is not covered by the resources of the Fund;
d) it annually estimates the expenditures that can be used in the future for funding the compensations in accordance with Article 113c paragraph 2 letter a RPBG;
e) it examines the funding requests submitted according to Article 51f paragraph 1 and submits proposals to the Directorate for the use of available amounts, taking into account the established order of priorities and the expenditures already made;
f) it verifies that the amounts paid out from the Fund are used as allocated;
g) it continuously monitors the financial commitments made and submits an annual report to the Directorate and the Financial Administration regarding these financial commitments.
3. The KSTV ensures the payment of owed amounts into the Land Improvement Fund, the Cantonal Added Value Fund, and to the municipalities.
4. The Fund is included in the state's balance sheet.
5. The BRPA submits an annual report on the management of the Fund to the Directorate, which is then integrated into a situation report for the Council of State.
6. The Financial Inspection periodically reviews the Fund.
1. Expenses imposed on municipalities within the framework of procedures for material expropriation can only be financed by the cantonal value-added fund if the amounts to be paid are based on a legally binding decision of the expropriation commission. The application of Article 113c para. 2 lett. a RPBG is reserved.
2. The municipality submits the financing request in writing to the BRPA as soon as it becomes aware of the request for compensation due to material expropriation.
3. If the condition under paragraph 1 is met and provided the resources of the fund allow, the Directorate approves the request and disburses the amount to the municipality. Requests are financed in the order of the date of the finality of the decisions under paragraph 1.
4. Amounts for requests that cannot be financed due to insufficient funding of the fund will be paid as soon as the available amounts permit. No interest shall be paid.
5. The right to payment of the amount to be provided by the fund to the municipality becomes statute-barred ten years after the decision under paragraph 1 has become final.
1. Through the cantonal added value fund, the following can be financed
a) Projects pursuant to Article 113c para. 2 letter b RPBG, up to 30% of the costs incurred, but no more than 300,000 Swiss francs for agglomeration programs, 150,000 Swiss francs for regional zoning plans or their revisions, and 50,000 Swiss francs for other regional and municipal studies;
b) Infrastructures pursuant to Article 113c para. 2 letter c RPBG, up to 10% of the costs incurred, but no more than 100,000 Swiss francs;
c) Further measures pursuant to Article 113c para. 2 letter d RPBG, up to 10% of the costs incurred, but no more than 100,000 Swiss francs.
2. Framework development plans according to Article 63a RPBG are considered municipal studies that can be financed by the fund.
3. If an object pursuant to paragraph 1 is subsidized according to special legislation, the total amount of financial aid and compensation granted by the public sector for this object must not exceed 80% of the subsidizable expenses according to the state's standards.
1. Applications for the financing of objects pursuant to Article 51e must be submitted to the BRPA by the municipality or the regional body, along with an offer and all additional required documents, before the end of the first quarter each year. Applications submitted after this deadline will be processed in the following year.
2. The BRPA informs the relevant regional body or municipality if an object cannot be financed by the fund during the year the application was submitted due to the legal priority order and expenditures already incurred. The regional body or municipality shall then inform the BRPA whether the application will be withdrawn or processed in the following year.
3. If the financing application meets the requirement set out in paragraph 1, the BRPA forwards it to the Directorate so that a decision can be made on the amount payable within the available share pursuant to Article 51a paragraphs 2 and 3.
4. The Directorate decides on the application and communicates its decision to the regional body or municipality. The decision sets out the modalities for monitoring the works and any conditions that must be observed.
1. The amounts determined by the administration shall be paid out as soon as the final statement of account is submitted.
1. If the amount for compensation or financing of spatial planning measures pursuant to Article 51e is not used as intended or if the associated conditions are not met, the Directorate may demand the repayment of the amount based on an analogous application of Articles 37 and 38 of the Subsidy Law of November 17, 1999.
2. Article 41 of the Subsidy Law of November 17, 1999, applies mutatis mutandis to applications for financing of spatial planning measures pursuant to Article 51e.
1. The municipal regulation contains at least the following elements
a) the assessment;
b) the use of the levy.
1. The land registry offices inform the Directorate and the KSTV about changes to parcels that result in the transfer of the note regarding subjection to the value-added levy.
2. The BRPA reports to the KSTV cases that fall under Articles 113e paragraph 1 letter a and 113ebis paragraph 2 letters a and b of the RPBG.
1. In the case pursuant to Article 113ebis paragraph 2 letter a RPBG, the payment of the levy for the entire amount owed is deferred if
a) the additional areas obtained through the building permits issued after the public announcement of the planning measure do not exceed 20% of the already legalized main usable areas (HNF) on the respective property;
b) the work concerns the renovation and/or energy improvement of the building.
2. The deferment of the due date pursuant to Article 113ebis paragraph 2 letter c RPBG is not applicable in the case of concurrent or successive sale of condominium ownership shares that equates to the sale of the entire property.
1. In the event of a change in the parcel (e.g., subdivision of properties), the land registry office, upon application by the KSTV, shall carry out the subdivision of the mortgage and the necessary releases.
2. In the case of the sale of joint ownership and partial payment of the fee, the KSTV shall apply to the land registry office for the reduction of the mortgage capital.
1. Necessary expenses for the enhancement of the property according to Article 113b paragraph 2b RPBG are considered to be
a) the costs for the study to create a mandatory detailed development plan;
b) the costs for detailed access;
c) the costs necessary to meet the requirements of Article 3 of the Ordinance on the Remediation of Contaminated Sites (AltlV), with the exception of costs that can be compensated for monitoring and remediation of contaminated sites according to the Ordinance on the Levy for the Remediation of Contaminated Sites (VASA);
d) the costs for land reallocation and boundary adjustment in the sense of Article 105 ff. RPBG.
1. The building projects requiring a permit are regulated in architectural matters by the present regulation.
2. Furthermore, reference is made to the technical standards of the following professional organizations
a) Swiss Society of Engineers and Architects (SIA);
b) Swiss Association for Standardization (SNV);
c) Association of Swiss Waste Water and Water Protection Experts (VSA);
d) Association of Swiss Road Specialists (VSS).
3. For protected objects, the construction regulations apply; the effects of the preservation order are reserved.
4. The application of the provisions of the Introductory Act to the Swiss Civil Code remains reserved.
1. When drafting a modification or division deed for a plot in the construction zone, the licensed engineer-surveyor ensures compliance with zoning and building regulations. For this purpose, he or she consults with the municipality beforehand.
2. If a transfer of utilization rights is planned simultaneously with a modification or division of the plot, the affected owners establish an agreement for this purpose. The licensed engineer-surveyor submits this agreement, along with the deed plan, to the municipality for evaluation. If the municipality provides a favorable assessment, the licensed engineer-surveyor prepares the deed and applies for the agreement to be registered in the land register. He or she attaches the agreement, the deed plan, and the municipal assessment in three copies to the deed. Once the land registry office has completed the registration, the licensed engineer-surveyor transmits one copy of the agreement, along with the deed plan and the municipal assessment, to the district office and another copy to the BRPA.
1. The enclosed construction method is illustrated on the diagrams in Annex 1. These diagrams include various regulations that may be stipulated in the zoning plan regulation or in a detailed development plan.
1. Detached single-family houses are considered buildings with a maximum of three apartments.
2. These apartments can be positioned either one above the other or side by side in two (semi-detached houses) or in three units. The ancillary rooms may be arranged collectively.
1. As assembled single-family dwellings are considered buildings standing next to or on top of each other with at least four apartments. At least one essential residential element of each apartment must be directly and at ground level connected to a private outdoor space for recreational use, on the level of the natural or designed terrain.
2. The essential residential elements are considered to be
a) a living room;
b) a dining room;
c) a kitchen;
d) a bedroom.
3. For each main apartment, an additional apartment can be provided on another floor; the usable area of the additional apartment must not exceed half the usable area of the main apartment.
1. Multifamily houses are defined as buildings that contain four or more apartments and do not fall under the typology of buildings pursuant to Article 56.
1. Generally, only minor alterations to the topography of the natural terrain are permitted. The project must be adapted to the topography of the site. The finished landscape must harmonize with that of the neighboring plots.
2. The municipal regulations may provide for special provisions.
**1. Slopes must not exceed a line, which is in a 2:3 ratio (2=height, 3=length) (see the first diagram of Appendix 2). This line is drawn from the property boundary, either from the natural ground or from the top of the retaining wall for ascending slopes, or from the wall base for descending slopes (Appendix 2, Figures 1-3). The provisions of the mobility legislation concerning neighboring properties remain unaffected.**
**2. If private individuals undertake measures to stabilize the slope, they can agree in writing to deviate from this provision.**
1. Enclosure or retaining walls must not exceed a height of 1.20 meters on the boundary line (Annex 2, Figures 2 and 3). If a wall exceeds this height, it must be set back by an equal amount. The height of the wall is measured from the natural ground at the property boundary.
2. The provisions of the Mobility Act concerning neighboring properties remain reserved.
1. The access to public or private roads must not present any obstruction or danger to traffic. Access ramps must comply with the SNV and VSS standards.
2. Access to buildings for assistance services, notably for the fire department, must be ensured.
3. The access and turning area to the garage do not qualify as a parking space.
4. Garages must be constructed at a sufficient distance from the public road so that the vehicle can be parked outside the road when opening and closing the garage doors.
1. Every building must have parking spaces, the quantity and allocation of which to the various users is determined in the municipal regulations in accordance with Article 27.
2. Parking spaces for projects according to Article 63, paragraph 2 of the RPBG must be arranged in such a manner that they are consistent with efficient and sustainable land use.
3. Parking spaces for shopping centers must be primarily established in the basement or integrated into the main buildings. Exceptions are only possible if the proposed, sufficiently justified solution adheres to high-quality planning standards and allows the parking spaces to also be accessible to the public.
1. Each multi-family dwelling must have playgrounds or recreational areas whose area is at least 10% of the total primary usable floor areas (UFA) of the apartments. It is possible to transfer these values within the framework of a detailed development plan.
2. These areas must be located away from motor vehicle traffic and be adequately sunlit.
3. The municipal council can require shared playgrounds or recreational areas in single-family house districts.
1. The building materials and colors of façades and roofing must be selected in a manner that ensures unity and harmony from an architectural perspective for each construction, as well as good integration into the surrounding environment.
1. A dormer is understood to be any opening in the roof that serves for lighting or ventilation. This term also includes roof windows (flaps) and balconies built into the roofing.
2. The municipal regulation may establish values for the sizing of dormers, particularly in the case of an existing comprehensive development where the roof design represents a characteristic element.
1. The energy concept of a building must comply with the provisions of the Energy Regulation.
1. The stairs must comply with the applicable technical regulations.
2. Openings leading into empty space, such as French doors, balconies, stairs, terraces, must be equipped with a railing in accordance with the applicable technical regulations.
1. A room is considered habitable if it can be used permanently for living or working.
2. Every habitable room must meet adequate hygienic conditions.
3. Rooms can be used for living purposes only under the following conditions
a) The rooms must be naturally illuminated and oriented according to their purpose; the window sill must not be higher than 1.20 m, and the view must be unobstructed horizontally at a distance of at least 4.00 m;
b) The requirements according to Article 69 et seq. are applicable.
3bis. Exceptions to subsection 3 letter a regarding the height of the sills can be allowed in the case of a renovation of a building if these are necessary due to the architectural characteristics or the condition.
4. Workspaces are subject to special legislation regarding the protection of employees.
1. The area of a living room must be proportionate to the size of the apartment. It must not be smaller than 16 square meters.
2. The living area of a room for one person must not be less than 10 square meters. Smaller rooms are only permitted if they can be connected to other rooms.
3. The living area of a room for two persons must not be less than 14 square meters.
4. For attic rooms, the area is calculated from 1.50 meters above the floor.
5. In the following cases, deviations from the provisions of paragraphs 2 - 4 are permitted
a) in single-family houses;
b) in the conversion of buildings where the condition justifies it;
c) in certain types of housing that are time-restricted.
1. The floor height as per Section 5.4 of the annex to the Intercantonal Agreement on the Harmonization of Building Terms (IVHB) must not be less than 2.40 meters.
2. If the ceiling follows the roof slope, the minimum floor height must be maintained over at least half of the area of each room.
3. For single-family houses according to Article 55, exceptions to the provisions in paragraphs 1 and 2 may be permitted, provided that lighting and ventilation are adequate. The same applies to renovations if the condition warrants it, and for certain types of temporary housing.
1. In residential buildings, living rooms and rooms must be adequately sunlit.
2. In living spaces, the glazing area of the windows must not be less than 1/10 of the room area and must be at least 1.00 m².
3. If necessary due to architectural peculiarities or the condition, exceptions to paragraphs 1 and 2 may be permitted.
4. Every living space must be naturally ventilated through one or more doors or windows or by a mechanical ventilation system.
1. Each dwelling must have a kitchen and sanitary facilities, the size of which must be proportionate to the living space.
1. Multi-family houses pursuant to Article 57 must have common areas, such as laundry rooms, drying rooms, cellars, storage rooms (for bicycles, strollers...), which are proportionate to the size of these multi-family houses.
1. Works to which Article 129 of the RPBG applies must be designed in accordance with applicable technical standards for barrier-free construction.
1. Subterranean structures are considered buildings that do not extend more than 1 meter above the designated or lower terrain.
1. Protruding Building Parts are considered to be
a) parts of the building whose depth does not exceed 3 meters or 1.50 meters for roof overhangs up to the projection of the facade line, and
b) whose length, with the exception of roof overhangs, does not exceed one third of the corresponding facade.
2. A protruding building part may not exceed the distance to the boundary by more than 1 meter.
1. Levels below ground are considered floors where the upper edge of the finished floor is on average no more than 1 meter above the façade line.
1. Attic stories are considered as stories whose knee wall heights do not exceed 1.5 meters.
2. Where the municipal regulations permit asymmetrical gable roofs or shed roofs, differentiated knee wall heights may be established for the design of attic stories. The smaller knee wall height must not exceed the value according to paragraph 1, while the larger knee wall height can be freely determined.
**1. Definition of Attic Floors**
Attic floors are considered to be those floors where at least one entire facade is set back by 2.50 meters from the habitable part of the floor below.
1. Pedestrian pathways, bicycle paths, footpaths, and hiking trails (Art. 94 para. 1 let. a, e and para. 2 RPBG) are included in the calculation of the relevant land area (Sect. 8.1 Annex IVHB).
1. In residential zones with open construction, the floor area ratio according to municipal regulations must not be less than 0.6.
2. In industrial zones, where no volume ratio is applicable (Item 8.3 Appendix IVHB), the floor area ratio must not be less than 0.75.
3. In zones with open construction, the municipal regulations may forgo specifying the floor area ratio, provided that the other regulations suffice.
4. For the conversion of an existing building within the construction zone, the established values for the relevant zone need not be adhered to, if
a) the building is listed in the zoning plan;
b) the conversion occurs within the original volume;
c) due to the plot area, the floor area ratio for the corresponding zone cannot be maintained during a conversion within the original building volume;
d) during the conversion, the special character of a townscape, locality, neighborhood, or street, as well as the appearance of the building to be converted, is taken into account;
e) in case of parcel division, the floor area ratio value of the zone is applied to the building and any potential new constructions;
f) the other building regulations are complied with.
5. Areas with a floor height of less than 1.50 m are not considered in the calculation of the floor area ratio.
6. Renovated buildings that meet at least Class B of the Cantonal Building Energy Certificate (GEAK), and new buildings that comply with Class A of the GEAK, are granted a bonus of 10% on the floor area ratio specified in the municipal regulations.
7. In zones with closed construction, the floor area ratio is not applicable.
1. In zones with open construction, the municipal regulation may waive the determination of the building coverage ratio, provided that the other regulations are sufficient.
2. In zones with closed construction, the building coverage ratio is not applicable.
1. For a building that only has ancillary use areas, the distance to the property boundary must be at least half the height of the part of the building that lies outside the building area (Section 7.4 Appendix IVHB), provided that (see diagrams in Appendix 3)
a) the construction does not compromise the unity of the buildings and is constructed in such a manner that it does not hinder firefighting efforts;
b) the largest dimension of the part of the building that lies outside the building area does not exceed 8.00 m in the layout;
c) the overhangs of the canopies of this part of the building do not exceed 0.6 m;
d) the total height of this part of the building does not exceed 3.5 m;
e) the distance between buildings located outside the building area is at least 3.5 m.
2. Underground and sublevel structures may be constructed up to the property boundary. The provisions of special legislation remain applicable.
1. If the total height of a building exceeds 10 meters and the length of a façade of this building exceeds 30 meters, the distance of the affected façade from the property boundary must be at least one-fifth of this façade length.
2. Paragraph 1 does not apply to industrial, commercial, and trade buildings that are located in the designated zone for such purposes, except for those located at the boundary of other construction zones.
3. The municipality may relax the principle set forth in Paragraph 1 only on the basis of special planning studies within the framework of local planning. Article 71 remains reserved.
4. The provisions regarding the increase of distance do not apply to buildings whose properties border a public road.
1. An exceedance of the applicable distances, including those stipulated by special legislation, of no more than 30 cm is granted for the renovation of buildings that meet at least the B classification of the CECB.
1. Subject to the standard procedure, the following require a building permit
a) the construction of new buildings, the demolition (subject to Article 150 paragraph 1 RPBG), reconstruction, enlargement, and addition of stories;
b) alterations that could affect the strength of a building’s supporting structure or its elements worthy of protection;
c) changes in the use of spaces and modifications to facilities that could affect the environment, including, in particular, new facilities as defined in Article 2 paragraph 4 letter a of the Air Pollution Control Ordinance (LRV), substantially modified installations as defined in Article 8 paragraphs 2 and 3 of the Noise Abatement Ordinance (LSV), modified facilities as defined in Article 9 of the Ordinance on Protection Against Non-Ionizing Radiation (NISV), facilities subject to environmental impact assessment as per Article 10a of the Environmental Protection Act of October 7, 1983 (USG), and facilities that are hazardous to water. Article 85 paragraph 1 letter d remains reserved;
d) ...
e) ...
f) civil engineering works, such as embankments, excavations, noise barriers, pipelines, sewer systems, water intakes, the expansion of watercourses, and access to a public road;
g) gravel extraction, landfills, and quarries, as well as all facilities associated with these installations;
gbis) extraction of materials from public waters for which a brief environmental report must be prepared (Art. 58 GewR);
h) sports and recreational facilities, such as sports fields, ice rinks, harbors, public swimming pools and beaches, shooting ranges and facilities, motocross tracks, go-kart tracks, model railways, artificial snow facilities, camping, and caravan sites;
i) all facilities and works that significantly alter the form of the land or the appearance of a landscape, place, or neighborhood;
j) renovation works associated with a change in the soil;
k) gas stations, silos, and containers of any kind. Articles 85 paragraph 1 letter j and 87 paragraph 1 letter e2 number 1 remain reserved;
l) transmission facilities subject to the NISV;
m) greenhouses and tunnels intended for agriculture, vegetable, and horticulture for year-round operation.
1. Under the simplified procedure, the following are subject to a building permit
a) Retaining walls, including the earthworks associated with their construction, enclosure walls, and fences, subject to Article 87, paragraph 1, letter e2, number 3;
b) Renovation work on the roof and facade that substantially changes the appearance of the building;
b1) Interior alterations that cannot impair the strength of a building's load-bearing structure;
c) Changes in use and installation changes that neither require work nor affect the environment or waters;
cbis) Repurposing for secondary residence purposes of apartments previously used for primary residence purposes, as well as changes according to federal legislation on secondary residences (Art. 13 ZWG), provided they neither require work nor affect the environment or waters;
d) Ventilation, air conditioning, and heating systems, including the replacement of heating and/or hot water systems, and related work;
d1) Underground pipelines serving to connect buildings to the main distribution network;
e) ...
f) Solar installations, unless exempt from a permit under federal law; in particular, solar installations on structures located in a protection zone according to Article 59 RPBG or within a protection perimeter according to Article 72, paragraph 1 RPBG, are subject to a building permit requirement;
f1) Charging stations for electric vehicles, subject to Article 87, paragraph 1, letter b1;
g) Excavations and embankments up to a maximum height of 1.20 m from the natural ground, not exceeding an area of 500 m²;
h) Signs and other advertising devices, subject to Article 84, letter i;
i) Vending machines;
ibis) Locations for setting up mobile kitchens;
j) Other minor constructions and installations that are not and cannot be used for residential or work purposes, such as radio antennas, huts for small animals (chicken coops, rabbit hutches...), garages, carports, or parking spaces, garden houses, wood sheds, pergolas, shelters, unheated winter gardens, biotopes, containers for rainwater collection, private swimming pools, and greenhouses. Subject to Article 87, paragraph 1, letter b and e2, numbers 1 and 2.
2. In case of doubt, the municipal council shall obtain the opinion of the chief administrative officer beforehand.
1. Subject to the specific provisions of federal legislation, particularly the provisions concerning
a) advertising (Law of November 6, 1986, on advertising);
b) freestanding air conditioning and heating systems, as well as swimming pool heating (Energy Law of June 9, 2000);
c) pipeline installations for transporting liquid or gaseous fuels or propellants not subject to federal approval (Resolution of June 5, 1979);
d) cable cars for passenger transport without federal concession (Mobility Law of November 5, 2021);
e) elevators, freight elevators, and escalators (Ordinance of December 28, 1965, concerning fire safety and protection against natural hazards);
f) land improvements (Law of March 2, 1999, on forests and protection from natural events and its implementing regulations; Law of May 30, 1990, on land improvements).
1. No Building Permit is Required for
a) Maintenance, repair, and renovation work on the roof and facade that do not significantly alter the appearance of the structure;
b) Minor ancillary installations such as satellite dishes, uncovered garden terraces, private garden fireplaces, private children's playgrounds, and seasonal swimming pools that are dismantled at the end of the season;
b1) Charging stations for electric vehicles in connection with a single-family home according to Articles 55 and 56;
c) Garden and outdoor space designs or installations such as stairs, fountains, sculptures;
c1) Summit crosses with a maximum height of 2 meters;
d) ...
e) Greenhouses and tunnels for vegetable and garden cultivation with a seasonal character that are dismantled at the end of the season;
e1) Structures and installations temporarily erected for a period of no more than three months for tourism or recreational purposes;
e2) Within the building zone
1. Wood sheds, garden houses, containers for rainwater collection, and private greenhouses with a maximum floor area of 6 m² and a maximum total height of 2.50 m, provided they are erected at a distance from the neighboring property that is at least half of their height;
2. Green pergolas of 12 m² and a maximum total height of 2.50 m, provided they are erected at a distance from the neighboring property that is at least half of their height;
3. Woven and lattice fences;
f) Caravans and mobile homes in zones designated for this purpose by local planning.
g) Solar installations on buildings in work zones, which are subject to the notification procedure according to paragraph 3.
2. The Simplified Procedure applies, however, if the buildings and installations listed in letters b-e2 are located in the following areas
a) At a distance of less than 20 meters or any other lawful distance from a waterfront area (lake and watercourses), forest, a nature reserve, or a protected natural object;
b) At a lesser distance from a public road than that applicable under the Mobility Act of November 5, 2021;
c) In the water area;
d) In an area that is the subject of a protection measure;
e) Within an archaeological perimeter;
f) In a wildlife corridor;
g) Near a protected building.
3. Solar installations exempt from permits under federal law and those on buildings in work zones must be notified to the municipality thirty days before construction begins. The plans and documents that must be attached to the notification are specified in the Directorate's guidelines (Art. 89 para. 2).
4. Changes of use according to the Federal Legislation on Second Homes (Art. 7 ZWV) must be reported in writing to the senior official within 30 days of moving in. The senior official notifies the land registry office of the change of use ex officio, so that it can amend the annotation.
1. Minor modifications to mobile telecommunications facilities are exempt from the requirement for a construction permit.
2. Modifications are considered minor if they do not result in a significant increase in emissions at sites with sensitive use as defined by federal legislation on protection against non-ionizing radiation.
3. Minor modifications pursuant to paragraphs 1 and 2 must be reported to the Environmental Office. The minor modification may only be implemented once this office has granted its approval, which must occur no more than thirty days after receipt of the notification.
4. The minor modifications, along with plans and documents that must be attached to the notification, are specified in a directive issued by the Directorate.
1. The preliminary examination request shall be submitted using the IT application for the construction permit procedure with the municipality. The municipal council comments on the request and forwards the dossier to the BRPA.
2. All components of the request must be recorded electronically and submitted using the application for the construction permit procedure.
3. The request must also be submitted in paper form. The Directorate will determine the number of dossiers to be submitted in paper form in a directive.
4. The BRPA obtains the opinions of the interested offices and bodies. It communicates these, along with its own opinion, to the applicant, the municipality, and the regional official.
5. For the cases under Article 155 RPBG, a preliminary examination request is mandatory.
1. The applicant initiates the procedure by submitting a building application using the application for the building permit procedure to the municipality.
2. All components of the application must be electronically recorded and submitted using the application for the building permit procedure.
3. The application must also be submitted in paper form.
4. The application must include all information and documents required for examination in accordance with the directorate's guidelines. The directorate ensures that the formal requirements for the simplified procedure are limited to the information necessary for the processing of the application. These guidelines also determine the number of dossiers that must be submitted in paper form.
1. As a general rule, the application, along with the plans and attachments, is electronically recorded by the applicant or the person representing them.
2. The municipality or, subsidiarily, the BRPA, undertakes the complete or partial electronic recording of the application, plans, and attachments if the applicant or their representative does not possess the necessary technical means or knowledge.
1. The municipality examines the application both formally and materially; if necessary, it requests the required additions.
2. If a formal defect is identified, the application is returned to the applicant for correction. The municipality will not entertain a second application that contains formal defects.
3. If a project is clearly in conflict with public construction law or could only be approved with a deviation that has not been requested, the municipality notifies the applicant or the person representing them in writing. The procedure continues if the applicant or the representative informs the municipal authority within thirty days of being notified of the defect that they wish to proceed with the application. Otherwise, the application is considered withdrawn.
1. The erection of construction profiles, which outline the dimensions of the structures, is mandatory. This must occur no later than the day of publication in the official gazette.
2. Before the building permit is granted, the construction profiles may not be removed without the consent of the competent authority.
3. Depending on the type and significance of the construction, the municipality may exempt the applicant from the obligation to erect construction profiles.
4. The municipality may require the erection of construction profiles for the submission of a detailed development plan.
1. The municipality shall ensure publication in the Official Gazette as soon as possible after acceptance of the complete dossier. Additionally, it may publish the notice using other available means of communication.
2. The notice of public display, or in the case of the simplified procedure, the registered letter, shall contain the name of the applicant, the property owner (if applicable, the name of the beneficiary of a sales promise), the architect, the engineer, or any other person responsible for the project, the cartographic coordinates, as well as the subject and nature of the works.
3. Any variance request and any environmental impact report must also be included in the notice, or in the case of the simplified procedure, in the registered letter.
1. If an objection is filed, the municipality shall inform the applicant and forward a copy of the objection to them.
2. In the event of an objection, the municipality or the superior official may invite the parties to a conciliation hearing.
1. The municipality reviews the building permit applications and provides comments on any potential objections. It submits the dossier to the BRPA within a period of 20 days after the expiration of the public notice period; special circumstances excepted.
2. The BRPA consults the relevant authorities and bodies; these entities formulate their opinions within thirty days of receiving the dossier. If warranted due to the particular complexity of the case or non-compliance of the project with the regulations, an extension of fifteen days may be granted upon request.
3. It is assumed that any authority or body failing to adhere to the initial or extended deadline waives its right to submit an opinion.
4. The BRPA ensures, if necessary, that it has received preliminary decisions. It forwards the dossier along with its comprehensive assessment to the district official for a decision.
5. Additionally, Article 90 paragraphs 1 and 2 apply mutatis mutandis.
1. For objects treated under the simplified procedure, the municipal council shall obtain the necessary opinions from the relevant departments and bodies as quickly as possible, particularly when dealing with protected objects or those listed in a directory, when the object is within an archaeological perimeter, located in a natural hazard area, affects a watercourse and its banks, or is the subject of a protective measure. The council shall ensure that any preliminary decisions have been made.
2. The special provisions for trees outside forest areas (Art. 18 para. 1 letter b of the Regulation of 27 May 2014 on Nature and Landscape Protection) are reserved.
1. The competent building permit authority shall decide on the application without delay and reserves compensation for third parties and civil disputes for the court. It decides separately on any outstanding objections.
2. In the ordinary procedure, a decision on the building application must generally be made within 60 days from its receipt by the BRPA, provided that
a) no objection has been raised against the project and it complies with all laws and regulations in every respect;
b) the dossier is complete and does not present any particular complexity.
3. The suspension of a building application remains reserved.
1. If a project is modified during the procedure or after the decision of the competent authority, a new submission procedure must be initiated in accordance with Article 140 RPBG and Article 92.
2. If the changes during the procedure are insignificant, the procedure may continue without a new submission, provided these changes do not affect the rights of third parties.
1. The approval is transmitted along with the dossier of the applicant, the author of the plans, and in the ordinary procedure, to the municipality.
2. In the simplified procedure, the municipal council transmits a copy of the approval to the district officer, the consulted authorities, and, for constructions outside the building zone, to the BRPA.
3. Authorities generally use electronic transmission for communications. The regulations regarding the delivery of decisions are reserved.
**1. Exceptionally, the authority responsible under Article 139 RPBG may permit early commencement of construction upon a justified request from the applicant under the following conditions:**
a) The applicant demonstrates that they would suffer excessive harm if the work cannot commence early.
b) The public or limited publication has been completed.
c) No objections have been filed against the works for which early commencement is being requested.
d) During the ordinary procedure, the dossier has been forwarded to the BRPA. The BRPA and the municipality have been consulted in advance.
**2. If necessary, the competent authority directly consults the affected offices.**
**3. If the project requires preliminary decisions from other authorities, the authority responsible under Article 139 RPBG must obtain their consent.**
**4. The approval for early commencement of construction is granted at the cost and risk of the applicant, without prejudice to the outcome of the construction application. The rights of third parties remain reserved.**
1. The works are deemed to have commenced insofar as they have been concretely and earnestly undertaken and bear a significance demonstrating that the owner has incurred substantial costs for their initiation and continuation, such as notably significant earthworks, construction of foundations, demolition of a building for a new construction, creation of sewerage systems.
2. If the works are not progressing sufficiently rapidly, the permit holder may demonstrate in other ways that he or she has the genuine intention to proceed with the works without delay.
1. The municipality notifies the affected adjacent property owners and grants them a period of 14 days to comment on the deviation request and to assert any potential compensation claims. The period is 30 days in the cases of Article 3 paragraph 2.
2. If the deviation falls under the jurisdiction of the senior official, the municipality comments on the deviation within the framework of its opinion on the building application.
1. Simultaneously with the approval decision, the responsible authority issues a reasoned decision on the deviation request. It communicates this decision to the applicant, any potential objectors, and, if applicable, the municipality, specifying the legal remedies available and the deadline for filing an appeal.
2. If the decision to refuse the deviation becomes legally binding, the applicant must amend the already submitted plans accordingly. A new public submission is not required if the amendment only involves the elimination of the point that was the subject of the deviation request.
1. The claim for compensation must be asserted in writing and must include applications. It must be submitted or delivered to the municipal administration by letter within the period stipulated in Article 101, paragraph 1.
2. The claim for compensation shall subsequently be added to the dossier of the building permit application.
3. If the competent authority grants a permit with a deviation, it shall simultaneously set a 30-day deadline for the adjacent property owners, who are asserting a claim for compensation, to file a claim for damages before the expropriation judge.
4. The claim for compensation shall lapse if the application for compensation is not submitted within the period according to Article 101, paragraph 1, or if the claim for damages is not filed within the period mentioned in paragraph 3.
1. The applicant may waive the granted deviation at any time.
2. If the claim for damages has already been submitted, it becomes void and the costs are borne by the party waiving the claim.
3. If a judgment on the claim for damages has already been rendered, compensation is only owed if the construction, which serves as its basis, has been completed. Otherwise, the person upon whom the costs were imposed may request the judge to reconsider and summarily decide on the costs.
4. If an appeal against the construction permit decision is upheld, paragraphs 2 and 3 apply mutatis mutandis.
1. The application for a mining permit must be submitted by the operator.
1. Based on the approval dossier and the operational regulations for embankments, the Directorate grants the extraction permit for one or more phases for a duration of five years.
2. The contents of the dossier for the extension of the extraction permit are specified in the guidelines of the Directorate.
3. Before the Directorate decides on the extension application, it consults with the relevant authorities and the municipality as necessary.
1. With its application for the transfer of permits, the new operator submits the same documents that are required for an application for the extension of the extraction permit.
2. The directorates responsible according to Article 158 paragraphs 1 and 2 of the RPBG require sufficient financial securities from the new operator.
3. In coordination with the prefect, the directorate consults the interested offices and the municipality.
1. Financial securities must be structured as irrevocable guarantees payable upon first demand.
2. At the appropriate time, the relevant authorities shall carry out the necessary inspections for the release of the required securities.
1. The operator shall prepare an operational regulation for embankments, which contains the following elements
a) the guaranteed opening hours;
b) the guaranteed rates;
c) the estimate of annually available embankment volume;
d) the indication of the starting point from which embankment can commence;
e) the types of materials permitted;
f) the measures employed for the control of materials and their origin.
2. The regulation shall be attached to the application for approval.
3. In the event of an amendment to the regulation, it must be submitted to the Directorate for validation.
1. Work may not commence until the building permit has been granted. Articles 144 and 150 paragraph 3 RPBG are reserved.
2. The client or the person responsible for the construction must notify the municipal council or its competent building office in writing about the progress of the work, so that they can carry out the following inspections
a) alignment framework (location and height);
b) laying of external sewers;
c) structural work;
d) completion of the work;
e) surrounding work.
3. Inspections carried out by the authorities do not absolve the client or their representatives from their responsibility in any way.
4. The municipal authority and the bodies referred to in Article 165 RPBG may utilize the services of a qualified third party.
5. For constructions at the property boundary or constructions where the legal or regulatory distance is exactly met or undershot, the alignment framework must be checked by a licensed engineer surveyor.
6. Representatives of the municipal or cantonal authority are entitled to enter the construction site at any time; upon request, the client must attend the inspections or have themselves represented.
7. Upon completion of the construction work, the client must restore the site within a reasonable period.
1. If there is a risk that the issuance of the certificate of compliance will be delayed due to the restoration of boundary markers and fixed points, the municipality must require a declaration from the owner stating that the licensed surveyor-engineer appointed to supervise the stakeout will perform these tasks.
2. The municipality shall be notified of the completion of the work by the licensed surveyor-engineer.
1. The certificate of conformity must be submitted to the municipality, the BRPA, the senior official, and, in the case of a protected building, to the Department of Cultural Property Protection.
2. For structures pursuant to Article 168 RPBG, the certificate must be submitted before the issuance of the occupancy permit.
1. Persons who are not yet registered in Registers A or B of the REG and are qualified under the Spatial Planning and Construction Act of May 9, 1983, to submit planning dossiers or building permit applications, must register within a period of two years in order for their qualification to be recognized in accordance with Articles 5 and 6.
1. For planning measures approved from October 1, 2023, the canton shall transfer the portion of the value-added tax to the municipality to which it is entitled, provided that the municipal regulation comes into force before January 1, 2026.
2. From January 1, 2026, the municipal tax may only be levied on planning measures approved after the municipal regulation comes into force.
1. The following regulations, resolutions, and ordinances are amended in accordance with the provisions in the annex, which forms an integral part of this regulation[1]
1. Implementing Regulation of December 28, 1981, on the Law on Municipalities (ARGG; SGF 140.11);
2. Implementing Regulation of August 17, 1993, on the Cultural Property Protection Law (ARKGSG) (SGF 482.11);
3. Resolution of April 10, 1990, on the Preservation of the Alpine Cultural Heritage (SGF 482.43);
4. Ordinance of December 28, 1965, concerning the Fire Police and Protection against Natural Hazards (SGF 731.0.11);
5. Execution Ordinance of October 12, 1917, on the Federal Act on the Utilization of Water Power (SGF 773.11);
6. Implementing Resolution of June 23, 1992, on the Federal Ordinance on Incidents (SGF 810.14);
7. Ordinance of July 2, 2002, on Environmental Impact Assessments and Relevant Procedures (UVPVV) (SGF 810.15);
8. Regulation of January 20, 1998, on Waste Management (ABR) (SGF 810.21);
9. Regulation of December 11, 2001, on the Forest and Protection from Natural Events (WSR) (SGF 921.11).
1. The Implementing Regulation of December 18, 1984, for the Spatial Planning and Construction Act of May 9, 1983 (SGF 710.11) is repealed.
1. This regulation shall enter into force on January 1, 2010.