Art. 155 RPBG - Demolition Permit - Principles · Principles

1. A mining permit, which is issued by the Directorate following the regular building permit procedure, is required for

a) any exploitation of the land for extraction purposes;

b) the reopening of a decommissioned extraction site;

c) the expansion or alteration of the perimeter or land profiles of an already approved extraction site;

d) deposits and embankments exceeding 20,000 m³.

2. Special legislation in the field of waste management remains reserved.

3. The mining permit is generally granted simultaneously with the building permit.

4. The duration of validity of a mining permit is determined in accordance with the extraction phases specified in the building permit.

5. A mining permit can only be granted if the conditions of the building permit are met.

← Art. 154 RPBG - Preconditions Spatial Planning and Construction Act (LATeC) - Purpose Art. 156 RPBG →

Need to analyze how this provision applies to your matter?

Cross-reference this statute against case law, commentaries, and related legislative provisions inside Legislator AI.

Open in Legislator →