Art. 2 Ordinance of 14 March 2008 on the Supply of Electricity (OApEl) - Definitions

OApEl; Chapitre 1 Dispositions générales
Open official source Full Act (106 Articles) Machine-readable Markdown (.md)

Art. 2 OApEl · Definitions

For the purposes of this ordinance, the following terms are defined as: a. forecast program: the profile (average power per unit of time) indicating the agreed supply or acquisition of electric energy for a certain duration; b. ... c. injection or withdrawal point: the point in the network where a measuring device captures and measures or records the flow of energy injected or withdrawn (measuring point); d. balance adjustment management: the set of technical, operational, and accounting measures used to ensure the continuous balance of power and energy accounts in the electricity system; this includes the management of forecast programs, measure management, and the management of balance account compensation; e. ... f. final consumer with basic supply: captive final consumer or one who waives network access (Art. 6, para. 1, LApEl).

The components of the transmission network particularly include: a. electrical lines, including pylons; b. coupling transformers, coupling stations, measuring, control, and communication devices; c. equipment used jointly with other network levels, which is used predominantly with the transmission network or without which the transmission network cannot be operated safely and efficiently; d. departures before the transformer providing the connection to another network level or to a power station, except for departures providing the connection to a nuclear power plant insofar as they are important for the operational safety of this nuclear power plant.

← Art. 1 OApEl Ordinance of March 14, 2008, on the Electricity Supply (OApEl) - Purpose and Scope Art. 3 OApEl →

Need to analyze how this provision applies to your matter?

Cross-reference this statute against case law, commentaries, and related legislative provisions inside Legislator AI.

Open in Legislator →

Court Decisions Applying This Provision (9)

A-194/2011 (Art. 2 Abs. 2 Bst. b StromVV)
Swiss High-Voltage Grid Definition Upheld: Substation Transfer Confirmed
Defines the scope of the transmission network, including switchgear, for transfer.
A-212/2011 (Art. 2 Abs. 2 Bst. b und d StromVV)
National Grid Company's Acquisition of Pre-Transformer Switchgear Upheld
These provisions specify that certain elements, including coupling transformers, switchgear, measuring, control, and communication equipment, as well as switch fields before transformers at transitions to other grid levels or power plants, belong to the transmission grid.
A-203/2011 (Art. 2 Abs. 2 Bst. d StromVV)
Switchgear Transfer to National Grid Company Upheld
Cited as the regulatory provision that defines switchgear before transformers as part of the transmission grid, forming the basis for the transfer of ownership.
A-157/2011 (Art. 2 Abs. 2 lit. c StromVV)
Tail Lines Classified as Transmission Grid
This provision further defines what belongs to the transmission network, and its interpretation was relevant to the court's decision.
A-8884/2010 (Art. 2 Abs. 2 lit. c StromVV)
Spur lines classified as part of national electricity transmission network
This provision elaborates on what constitutes the transmission grid, including jointly used facilities.
A-119/2011 (Art. 2 Abs. 2 lit. c StromVV)
Stub Lines Deemed Part of Transmission Grid by Court
The court referenced this article in relation to the definition of the transmission grid, but ultimately found the definition of 'mashed' was not sufficiently regulated here.
A-95/2011 (Art. 2 Abs. 2 lit. c StromVV)
Feeder Lines Deemed Part of National Transmission Network
Cited as part of the definition of the transmission network, detailing what components are included.
A-124/2011 (Art. 2 Abs. 2 lit. c StromVV)
Spur Lines Deemed Part of National Transmission Network
Used in the interpretation of the transmission network definition.
A-5452/2009 (Art. 2 Abs. 1 Bst. f StromVV)
Electricity Consumer's Right to Choose Supplier During Liberalization Phase