Act on the Industrial Works of Basel (IWB-Gesetz) (IWB)
Table of Provisions (48)
Statutory Text (48 Articles)
1. The secure, environmentally friendly, and economical supply of pipeline-bound energy and drinking water to the Canton of Basel-Stadt is of central importance for the development of the canton and constitutes a public duty. In fulfilling this duty, the canton adheres to the requirements of secure and environmentally friendly supply as well as the free-market economic constitution.
2. The pipeline-bound supply of electricity, natural gas, and drinking water in the territory of the Canton of Basel-Stadt is entrusted to the Industrial Works Basel ("IWB") in accordance with the provisions of this law.
2bis. The supply of district heating in the territory of the City of Basel is entrusted to the IWB under the provisions of this law. District heating, as referred to in this law, is the supply of pipeline-bound heat in the areas allocated to the IWB by the government council based on the energy master plan.
3. This law regulates the legal status, organization, and duties of the Industrial Works Basel.
1. IWB is an enterprise of the canton in the form of an independent, public-law institution with its own legal personality and headquarters in Basel.
2. IWB is registered in the commercial register.
1. The IWB fulfill public tasks in the areas of electricity, natural gas, district heating, drinking water, and thermal waste incineration. They ensure, within the scope of availability, the supply of the Canton of Basel-Stadt with network-bound energy and network-bound drinking water in accordance with this Act and federal law.
1bis. The IWB are authorized to shut down sections of the gas network in alignment with the specifications in the energy master plan or due to a lack of economic viability for a necessary renewal for the IWB. Affected gas customers must be informed of the planned shutdown at least two years in advance. Any compensations are determined according to the Energy Act (EnG) of November 16, 2016.
2. The supply includes the construction, operation, and maintenance of in-house facilities for production, storage, transport, and distribution, participation in such facilities, as well as the procurement of energy and drinking water. The term "network-bound drinking water" also encompasses service and firefighting water within the meaning of this Act.
1. The IWB shall establish, operate, and maintain safe and efficient networks in the fields of electricity, natural gas, district heating, and drinking water.
2. The IWB shall prepare multi-year plans to ensure safe, efficient, and effective supply networks.
3. All properties within the canton area that are designated for development under the applicable law must be connected to the electricity and drinking water supply network.
4. Connection to the other networks is determined by economic criteria. There is no entitlement to be connected to the other networks.
5. The IWB shall issue technical regulations concerning the requirements for connection to their supply networks. These regulations are binding on users.
6. The IWB are the network operators throughout the canton area in accordance with the Federal Electricity Supply Act of March 23, 2007 ("StromVG").
1. The IWB [Industrial Works of Basel] ensure services in the areas of public lighting, public clocks, and public fountains based on a performance mandate and taking into account the requirements of environmental protection. In accordance with the cost coverage principle, the IWB may claim their services for public lighting and public clocks as a surcharge on the electricity network usage fee from electricity consumers, and their services for public fountains as a surcharge from water consumers.
2. The IWB offer customer advice on the economical use of energy and the utilization of renewable energy, fulfilling the duties in accordance with §§ 6 and 7 of the Cantonal Energy Act of September 9, 1998. The additional costs incurred by the IWB due to fulfilling the tasks in accordance with §§ 14 and 15 of the Cantonal Energy Act of November 16, 2016, are counted as allowable network costs in line with Art. 14 para. 1 of the Electricity Supply Act (StromVG) and Art. 7 para. 3 lit. k of the Electricity Supply Ordinance (StromVV).
3. The IWB issue the regulations necessary for the technical execution of domestic installations for the supply of electricity, natural gas, and drinking water, or those that are required to supplement federal law and the regulations of the relevant professional associations. They grant licenses to companies that have appropriate personnel with federally recognized professional certificates for the creation, modification, and maintenance of these installations, and they maintain a list of approved companies. They conduct the necessary inspections of these installations.
4. The canton may assign additional performance mandates to the IWB within their field of activity. The services and their compensation are regulated in a performance mandate.
5. To enable medium-term corporate planning of the IWB, the canton may conclude multi-year framework agreements with the IWB.
6. On the cantonal side, the government council is responsible for concluding such performance mandates and their framework agreements.
1. The IWB provide commercial services based on economic principles supported by this law.
2. The IWB are also authorized to
a) provide the services listed in this law outside the cantonal territory;
b) offer energy services, telecommunications services, and other industry-related activities.
1. The IWB direct their business activities towards a secure, environmentally friendly, sufficient, and economical supply within the framework of optimal energy utilization.
2. The energy supply shall be based on various energy sources and take into account the use and promotion of renewable energy.
3. In the field of electricity, the IWB aim to fully meet the demand from renewable energies. They ensure through participations and/or long-term supply contracts that on average over five years at least 80% of the electricity sold by the IWB to end customers is generated from renewable energies.
4. The IWB do not participate in large power plants designed for the generation of electricity from non-renewable energies (nuclear power, natural gas, and coal) and avoid, as far as economically feasible within the scope of their supply mandate, purchasing electricity from such large power plants.
5. The supply of natural gas for heat generation in the Canton of Basel-Stadt will end in the year 2037. In areas of the district heating supply area according to §1 para. 2bis, where the provision of district heating is not yet possible by then, the Executive Council may, upon application by the IWB, provide temporary exceptions.
6. The IWB strive to ensure that the supply of natural gas for heat generation outside the canton is terminated by the year 2050 at the latest; this is without prejudice to the supply of gas based on renewable sources. Within the framework of the performance mandate and the owner strategy, the Executive Council sets corresponding interim targets in compliance with the principles according to para. 1.
7. The IWB ensure that extensions of the network for the supply of natural gas for heat generation only occur within the contractual obligations existing at the time of this provision coming into force, and investments in the network for the natural gas supply for heat generation are, as far as possible, depreciated by the time the supply of natural gas for heat generation is discontinued.
1. The bodies of the IWB are
a) the Board of Directors;
b) the Executive Management;
c) the Audit Office.
2. Persons who are married to each other, living in a registered partnership, or in a stable cohabitation, and those who are related or connected by marriage in the first or second degree, may not simultaneously belong to the bodies according to paragraph 1.
1. The Board of Directors consists of seven members. The members are elected by the Executive Council for a term of four years. Re-election is possible, but the total term of a member may not exceed 16 years. The members of the Board of Directors do not have any employment relationship with the IWB.
2. The Executive Council appoints the President.
3. When electing the members of the Board of Directors and the President, the Executive Council considers the professional qualifications and relevant experiences of the members of the Board of Directors. The composition of the Board of Directors should be balanced so that it collectively covers all essential competencies necessary for managing the IWB. The members of the Board of Directors must be qualified for their roles at the IWB and capable of independently assessing the activities of the IWB. Additionally, they must understand the performance mandate and the public service mission of the IWB.
3bis The following persons are not eligible for election to the Board of Directors
a) Members of the Grand Council;
b) Members of the Executive Council and other magistrates;
c) Employees of the cantonal administration who are assigned tasks related to the IWB;
d) Members of strategic and supervisory bodies of public law institutions that are fully appointed by public bodies of the canton.
4. The Executive Council determines the compensation for the members of the Board of Directors.
5. The Executive Council can dismiss the members of the Board of Directors at any time.
1. The Board of Directors is the highest governing body of the company IWB. The Board of Directors and its members bear the ultimate entrepreneurial responsibility, particularly for fulfilling the performance mandates.
2. The Board of Directors has the following tasks and competencies in particular
a) Supreme management of the company and supervision of the management;
b) Election of the members of the management;
c) Adoption of the organizational regulations and management regulations subject to the approval of the Government Council;
d) Determination of the strategic corporate objectives within the framework of the performance mandate, the investment program, and the ownership strategy;
e) Approval of business planning and the budget;
f) Adoption or amendments of the General Employment Conditions as well as the approval of a collective labor agreement (CLA);
g) Implementation of appropriate risk control, in particular through the establishment and maintenance of a risk management system and an internal control system (ICS) adapted to the risk structure of IWB;
h) Issuance of fee tariffs for services in the area of public tasks subject to the approval of the Government Council, as well as issuance of further implementing provisions;
i) Submission of applications to the Government Council concerning the approval of the annual financial statements and the appropriation of profit;
j) Approval of the formation of subsidiaries as well as participation in other companies.
1. The Management is the executive management body of the IWB and represents it externally.
2. The Management consists of the Chairperson and 2 to 7 additional members. The Chairperson of the Management has the right to propose candidates for the election of other members.
3. The Management possesses all the competencies for managing the IWB, subject to the competencies of superior bodies. Furthermore, the powers and duties of the Management are outlined in the organizational regulations.
1. The audit office is elected by the cantonal government council for a term of one year. Re-election is possible.
2. The audit office examines the accounting and annual financial statements. It reports in writing to the board of directors and the cantonal government council on the results of its audit.
3. Financial supervision is carried out by the financial control of the Canton of Basel-Stadt. The scope of supervision is determined by the Financial Control Act.
1. The staff of the IWB are employed in accordance with the provisions of the Personnel Act and the Act concerning the Classification and Remuneration of Employees of the Canton of Basel-Stadt. Paragraph 4 remains reserved.
2. The Board of Directors, in agreement with the staff representation, may issue supplementary or divergent regulations to the ordinances of the Government Council.
3. In agreement with the relevant staff associations, a collective labor agreement may be concluded in deviation from Paragraph 1.
4. To ensure competitiveness in the labor market, the IWB may, in deviation from Paragraph 1, grant additional compensations as needed to recruit and retain employees in middle and upper management and specialized positions. The relevant regulations must be stipulated in a regulations manual issued by the Board of Directors and approved by the Government Council. Employees to whom the regulations manual applies will be employed under private law. The regulations manual will be submitted to the Finance Committee of the Grand Council for information.
1. To ensure the occupational pension provision for its personnel, IWB joins the pension fund of the Basel State's personnel. The conditions for the personnel correspond to those applicable to the personnel of the Canton of Basel-Stadt. Exceptions are subject to differing regulations in the management regulations.
1. **For the Liability of the Members of the Board of Directors and Management, as well as the Auditors of the IWB, the Provisions of Company Law on Liability Apply Accordingly (Articles 752-760 CO). The Law on the Liability of the State and its Personnel of November 17, 1999, Does Not Apply in this Respect.**
2. **Disputes Arising from Liability Claims According to Paragraph 1 Shall Be Adjudicated by Civil Courts. In Such Proceedings, the Canton Has the Position of a Shareholder and a Creditor of the Company. The Competent Authority Is the Government Council.**
1. The IWB apply a generally accepted accounting standard that provides a true and fair view of the financial position, financial performance, and cash flows.
1. The IWB are exempt from all cantonal and municipal taxes in the Canton of Basel-Stadt.
1. To fulfill its duties, the Canton of Basel-Stadt grants the IWB an endowment capital.
2. In addition to the interest-free endowment capital, the Canton may provide the IWB with debt capital from its financial assets, which must bear interest at market conditions.
3. All infrastructure facilities, namely production resources, distribution networks, pipelines, facilities, networks, as well as intangible rights, are owned by the IWB.
1. The IWB aim to conduct their activities in a manner that generates a reasonable profit each year.
1. The IWB finance their operations through their own business activities, namely through the supply of energy and drinking water, as well as the provision of services and the fulfillment of performance mandates.
2. Financing through external capital is permissible.
3. The equity ratio (proportion of equity to total balance sheet) must be at least 40 percent.
4. The IWB may form reserves for an appropriate share of self-generation.
1. The IWB may enter into cooperations with public or private companies, establish companies, or participate in companies in order to fulfill their tasks.
2. The IWB may only sell or pledge the lines necessary for the supply of the cantonal area and significant constructions of the electricity, natural gas, district heating, and drinking water supply as well as participations in hydropower plants to third parties with the approval of the Grand Council. Provisions of the Electricity Act (StromVG) concerning the national grid company are reserved.
3. The acquisition of participations or the transfer of assets to third parties, in which the IWB does not have a majority stake, amounting to more than 30 million Swiss Francs requires the approval of the Government Council. Paragraph 2 above is reserved.
1. IWB provide their services for a fee.
2. Services in accordance with a public mandate are compensated through fees, while commercial services are compensated through market-conform prices.
1. The following services, which are based on a public mandate, are subject to the charging of fees
a) for the connection to the distribution networks of IWB in the areas of electricity, natural gas, district heating, and drinking water;
b) for the use of the distribution network infrastructure of IWB in the areas of electricity, natural gas, district heating, and drinking water;
c) for the supply of district heating and drinking water;
d) for the supply of electricity to fixed end consumers and end consumers who waive network access (Art. 6 para. 1 Electricity Supply Act);
e) for the receipt of waste that is incinerated in the waste incineration plant (WIP).
2. IWB are entitled, in special circumstances, to contractually regulate the remuneration for services in compliance with the fee principles enshrined in this law. The fee schedule sets the framework conditions for this purpose.
1. Fees for each product shall be set in such a manner that the revenues cover the expenses, including a reasonable profit, and prevent any cross-subsidization among different customer categories.
2. Expenses include the operation and maintenance of facilities, the purchase of goods and services, interest and depreciation, as well as risk mitigation.
3. Under-recovery of expenses for individual products is permissible, provided that it serves environmental protection interests, is mandated by the service agreement, and is fully compensated.
4. The IWB are obligated to levy charges in accordance with the cantonal energy law and indicate them on the invoices.
1. The fees for individual products consist of a basic fee and a unit fee.
2. The basic fees are determined based on one or more of the following criteria
a) installed capacity;
b) measured capacity;
c) meter size.
3. For consumers with low consumption, the basic fee can be standardized.
4. The unit fees are determined based on one or more of the following criteria
a) type;
b) consumption profile;
c) time of day;
d) season;
e) total consumption quantity.
5. Basic fees for electricity charges may only be levied as capacity charges for industrial and commercial consumers, whereby base tariffs, which are credited towards the fee, are permissible for all consumers. The unit fees for electricity charges should be structured to be consumption-independent.
1. The IWB provide commercial services at market-based prices. This includes, in particular, prices for electricity deliveries to all customer segments for which the Electricity Supply Act (StromVG) does not provide a supply obligation (see above § 23), the supply of natural gas, services in the field of telecommunications, energy services, and all services rendered outside the cantonal territory.
**1. To achieve the objectives of this law, the Canton shall conclude a service agreement with the IWB for a period of four years, in which the strategic direction of the IWB is listed, and the total investments per sector are presented.**
**2. For the conclusion of the service agreement, the Cantonal responsibility lies with the Executive Council. The service agreement and the total investments are submitted to the Grand Council for approval. The decision of the Grand Council regarding the total investments is subject to an optional referendum. The ownership strategy of the Executive Council for the IWB is presented to the Grand Council along with the service agreement for information.**
**3. Investments related to the development of a network for a new network-bound technology require separate approval by the Grand Council. The corresponding resolution of the Grand Council is subject to an optional referendum.**
**4. Investments in new and replacement construction of facilities within the territory of the Canton of Basel-Stadt, with a volume exceeding 30 million francs, require separate approval by the Grand Council. The corresponding resolution of the Grand Council is subject to an optional referendum.**
1. The IWB are subject to the supervision of the Executive Council. It exercises its supervisory function within the competencies conferred by this law and reports to the Great Council every four years on the compliance with the performance mandate in accordance with § 27.
1bis. The Executive Council approves the organizational regulations and the management regulations of the IWB.
2. The Executive Council is entitled, within the framework of its supervisory powers, to request information and inspect documents. It is obliged to maintain the business confidentiality of the IWB towards third parties and other authorities.
3. The Board of Directors reports to the Executive Council annually and upon request on the corporate strategy and important projects as well as on the business development.
4. The Board of Directors informs the Executive Council regularly, but at least once a year, about the assumed risks and the measures for risk control.
5. The Executive Council approves the fee tariffs for services pursuant to the public mandate according to § 23.
1. The Great Council is responsible for the supreme oversight.
2. The competent supreme oversight commissions possess all rights to inspection and information necessary for oversight, provided there are no significant private or public interests opposing them.
1. The Executive Council approves the annual financial statement with acknowledgment of the audit report and decides on the distributions to the canton, the allocation to reserves, and the carryforward of profits to the new account. The annual financial statement is submitted by the Executive Council to the Grand Council for information.
2. With the approval of the annual financial statement, the Executive Council decides on the discharge of the members of the Board of Directors.
1. The IWB are granted the exclusive concession to use the common land (public land and ground) for the construction, operation, and maintenance of pipelines and structures for energy and drinking water supply throughout the entire canton. In the area of supply with network-bound heat, the concession is limited to the supply area assigned to the IWB pursuant to § 1 Para. 2bis. The IWB must also tolerate restrictions on the concession for minor use of the common land by local heat distribution networks.
2. The municipalities of Riehen and Bettingen must be consulted by the IWB when their common land is to be used by the IWB. Additionally, the municipalities of Riehen and Bettingen can utilize their common land for the well and emergency water supply and for the supply of district heating and can issue corresponding concessions.
3. For the concession to use the common land for pipelines and structures of the supply networks, the IWB compensate the canton with an annual concession fee of CHF 11,000,000. The IWB is authorized to pass this fee on to its energy and water consumers. In doing so, consideration must be given to the use of the common land by the various networks (gas, electricity by network level, water, and district heating) and the individual consumption of the respective energy and water consumers. Any over- or under-recoveries of concession fee revenues will be credited or charged to the energy and water consumers in subsequent periods. The distribution of the concession fee between the canton and the municipalities of Bettingen and Riehen is determined by the government council after consulting the municipalities.
4. The pipelines and structures constructed by the IWB for energy and drinking water supply remain the property of the IWB.
5. The law on the use of public river and groundwater dated December 15, 1983, applies to water withdrawals from public waters.
1. The IWB coordinate their activities with the relevant cantonal or municipal authorities, particularly in relation to construction measures.
2. The IWB are to be included in the cantonal planning concerning water and energy supply.
1. The IWB have the authority to acquire the real estate and property rights necessary for the construction, modification, or expansion of their facilities, as well as conflicting usage rights, through expropriation based on the cantonal law on Expropriation and Impropriation of June 26, 1974, insofar as no expropriation right exists under federal law.
1. Property owners must tolerate all intrusions into their property that are necessarily related to the energy and drinking water supply by the IWB and are carried out in the public interest, in return for compensation for the damage caused thereby.
2. The compensation shall be determined according to expropriation principles in accordance with the law applicable to expropriations.
**1. Liability of the IWB**
1. The IWB shall be liable for damages incurred by property owners or users as a result of the operation of connection lines, systems, and devices by the IWB, in accordance with the mandatory federal law. Any further liability is excluded.
2. Liability for damages caused by force majeure is excluded.
3. The IWB may contractually modify liability when providing commercial services, deviating from these provisions.
1. The IWB may use image transmission and recording devices to protect its installations and lines and may record their signals.
2. The selection and marking of the monitored locations, as well as the retention periods, are subject to the applicable data protection regulations.
1. The IWB are authorized to process personal data without the consent of the individuals concerned using smart meters, to the extent necessary for
a) the supply of energy and water (particularly for the creation of consumption forecasts, balance group reports, capacity nominations, energy procurement, and portfolio management);
b) the measurement of energy and water consumption, energy production, and the amount fed into the grid;
c) the billing of energy and water consumption and the compensation for the fed-in amounts;
d) the determination of the grid status and ensuring secure, efficient, and high-performance grids;
e) detecting and preventing fraudulent use of services.
2. The IWB are also authorized, with the consent of the individuals concerned, to process personal data for the purpose of developing and providing energy services.
3. The details of data processing according to paragraphs 1 and 2 shall be regulated separately for each medium (electricity, natural gas, district heating, and water) in implementation provisions to be issued by the Board of Directors and approved by the Government Council. These implementation provisions on data processing must be submitted to the cantonal data protection officer for prior consultation.
4. Outside of their public mandate, the IWB are furthermore authorized to process personal data via the smart meter interfaces when and to the extent the individual concerned has commissioned them to do so and has given written consent after being adequately informed about the purpose and content of the data processing. The IWB must also ensure that the personal data collected are protected against unauthorized processing by appropriate technical and organizational measures.
5. Personal data and personality profiles collected with smart meters must be destroyed after twelve months, unless they are relevant for billing, anonymized, or the individual concerned consents to longer retention. Federal law remains reserved.
1. The liabilities of the IWB are exclusively covered by the assets of the IWB.
2. For privately organized subsidiaries of the IWB, only the provisions under the law of obligations regarding liability shall apply.
1. The IWB issues orders in areas where they perform public law functions and in the area of fees pursuant to § 23 of this Act, in accordance with § 38 of the Act concerning the Organization of the Government Council and the Administration of the Canton of Basel-Stadt dated April 22, 1976.
2. Objections to invoices concerning fees pursuant to § 23 of this Act can be submitted in writing within 30 days. The decision on the objection is made by issuing an order. After the objection period has expired without an objection being filed, the invoices concerning fees pursuant to § 23 of this Act have the effect of enforceable orders.
3. Affected parties can file a complaint with the Government Council against the orders issued by the IWB pursuant to this Act, in accordance with the provisions of the Organization Act.
1. A fine shall be imposed on anyone who
a) violates the regulations regarding the facilities or the supply of gas, water, electricity, and district heating;
b) climbs electrical transmission towers or public candelabra;
c) unlawfully opens hydrants, locks on wells and well chambers, or alters the flow of a public fountain.
1. The IWB shall acquire legal personality upon the enactment of this law.
1. The Canton of Basel-Stadt transfers all existing administrative and financial assets related to the supply of electricity, natural gas, drinking water, district heating, and telecommunications, as well as the waste incineration plant (KVA), to IWB as property.
2. Insofar as real estate transferred from the Canton of Basel-Stadt to IWB is no longer required for operational purposes and is to be sold, the Canton of Basel-Stadt has a preemptive right in accordance with Article 216c of the Swiss Code of Obligations (OR). The preemptive right is of unlimited duration.
1. On the reporting date of the opening balance sheet, a revaluation of the assets and liabilities of the IWB takes place.
1. The Transition of Employment Relationships of IWB Personnel is Conducted in Consultation with Employee Associations or with a Staff Representation Elected by the Personnel.
1. a) Energy Act: The Energy Act (EnG) of September 9, 1998, is amended as follows
b) Act on the Rules of Procedure of the Grand Council (RP): The Act on the Rules of Procedure of the Grand Council (RP) of June 29, 2006, is amended as follows
1. The Act on the Supply of the Canton of Basel-Stadt with Energy and Drinking Water by the Industrial Works Basel (IWB Act) of April 21, 1988, is repealed.
1. The Executive Council issues the necessary transitional and implementing provisions by way of ordinance. It is authorized to carry out all actions necessary for the transfer of the operation of the IWB to the public law institution IWB and, in particular, defines the relationship between endowment capital and the debt capital repayable to the canton.
1. The re-election of the Board of Directors by the Government Council takes place at the beginning of the term from January 1, 2018, to December 31, 2021.