421
STGB
CH-BL
§ 22 Rhine Ports Act - Load Limit, Amortization Obligation
Operation of the Rhine Ports - Building Rights Contracts
§ 22 Rhine Port Act · Load Limit, Amortization Obligation
1. The mortgaging of the building rights parcel in excess of the amount that exceeds 2/3 of the construction costs of the established facilities requires the approval of the competent directorate.
2. The real estate encumbrances are to be amortized annually by the building rights holder to the extent of the depreciation rates. The depreciation rates are to be determined within the scope of Art. 665 of the Swiss Code of Obligations (OR).