752.41
WNGLUELUA
CH-BE
Art. 10 Water Utilization Act (WUA) - Utilization Permit
Use of Public Water - Usage Rights
Art. 10 Water Utilization Act (WUA) · Utilization Permit
1. The use permit is granted if the legal requirements are fulfilled and no overriding public interests oppose it.
2. The use permit must be limited in duration.
Court Decisions Applying This Provision (1)
140 2005 35 · be (Art. 10 Abs. 2 WNG)
Hydroelectric Permit Term Subject to Modern Water Law
Cited as the legal basis requiring the usage permit to be time-limited.