Art. 5a Water Supply Act (WSA) - 2 Prerequisites
Art. 5a Water Supply Act (WSA) · 2 Prerequisites
1. Contributions are granted if
a *** the contribution rate according to Article 5b paragraph 1a reaches the minimum level determined by regulation,
b *** the project is based on an approved General Water Supply Plan, complies with the state of the art, and is economically feasible,
c *** the planned construction, renewal, or expansion of own facilities is necessary instead of cooperation with other water supplies,
d *** the canton’s participation in the planning and construction is ensured, and
e the necessary funds are available.
2. Regardless of the minimum contribution rate according to paragraph 1 letter a, contributions are granted for
a *** the General Water Supply Planning,
b *** facilities serving new or the expansion of existing regional water supplies,
c *** particularly costly or important hydrogeological investigations for the assessment of groundwater resources,
d *** measures according to Article 5 paragraph 1 letter i.
3. Additionally, the value-added tax levied on the charges and owed by the obligated parties is financed from the Water Fund.
4. The costs caused by administration shall be borne by the Water Fund.
5. Articles 21 to 27 of the State Contributions Act of September 16, 1992 (StBG) concerning the safeguarding of the contribution’s purpose are applicable mutatis mutandis.