1 General Provisions
Art. 75 Building Regulations (BauV) - Construction Site Setup
1. Building Sites, Material Storage Areas, as well as Depositing and Material Extraction Sites that are located next to streets, paths, squares, courtyards, or other publicly accessible places must be fenced off.
2. Where construction scaffolding or building site facilities border public traffic areas, the construction site must be enclosed with fencing up to a height of 2 meters at the request of the building police authority. If necessary, the fencing must be supplemented by a roof inclined towards the building site, at least 4.2 meters high and projecting at least 1.2 meters, to protect the traffic area from falling objects.
3. Unauthorized entry to construction sites is prohibited. This prohibition must be indicated by the necessary number of signs as required by the circumstances.