Legislator Case Law & Legislation
773.200 EnergieG CH-AG

of the Canton of Aargau (EnergieG) - Purpose (EnergieG)

47 Articles / Provisions · Switzerland · Canton of Aargau
Open official source Machine-readable Markdown (.md)

Table of Provisions (47)

Statutory Text (47 Articles)

General Provisions

1. This law establishes the framework conditions for the implementation of a sustainable energy strategy regarding energy supply, energy application, environment, and climate. The energy strategy takes into account the interests of society, the economy, and the environment in a balanced manner.

2. In governmental activities in the energy sector, the principles of sustainability, proportionality, and economic viability must be considered.

General Provisions

**1. The Act aims to:**

a) ensure a reliable and economical energy supply for the population and the economy,

b) increase energy efficiency in energy use and employ energy economically,

c) promote the use of renewable energies and waste heat,

d) support a safe and efficient energy distribution,

e) create appropriate framework conditions for sustainable energy generation,

f) reduce environmental pollution and improve climate protection,

g) decrease the dependency on individual energy carriers.

**2. The Grand Council sets medium-term goals and targets, in alignment with the federal guidelines, national standards, and national and international agreements.**

**3. The goals and targets should strengthen the innovation and competitiveness of the canton.**

General Provisions

1. **Energy Supply** includes the extraction, conversion, storage, provision, transport, transmission, and distribution of energy carriers and energy to end consumers.

2. **Renewable Energies** are regarded as

a) Hydropower,

b) Solar energy,

c) Geothermal energy,

d) Ambient heat,

e) Wind energy,

f) Energy from wood and other biomass,

g) Energy from biomass waste.

3. **Network-bound Energy** consists of energy and energy carriers supplied to end consumers through electricity, district heating, or gas distribution networks.

4. **Energy Supply Companies** are companies under private or public law that extract, convert, store, provide, transport, transmit, or distribute energy carriers or energy.

5. **Network Operators** are companies that operate networks for the transport of energy carriers or energy.

6. **Network Area** comprises a territory that is supplied with network-bound energy.

7. **End Consumers** are customers who purchase energy carriers or energy for their own consumption. Energy procurement for self-consumption by energy generation plants and network losses are excluded.

8. **Major Consumers** are end consumers with a heat consumption of more than 5 GWh or an electricity consumption of more than 0.5 GWh per year and per consumption site.

9. **Assessment of Economic Viability** incorporates the acquisition, operational, and maintenance costs over the investment's lifetime.

Energy Efficiency of Buildings and Facilities

1. Buildings and structures, as well as related fittings and equipment, must be designed and executed in such a way that energy, especially electricity, is used economically and efficiently. Waste heat and renewable energies should be utilized wherever possible.

2. Unless otherwise specified below, technical building systems must be adjusted when they are renewed or remodeled.

Energy Efficiency of Buildings and Installations

1. New buildings and facilities that are heated, ventilated, cooled, or humidified must be constructed in such a way that energy demand is low, air hygiene for the users is ensured, and damage to the building fabric due to unfavorable indoor climate is prevented.

2. Existing buildings and facilities must be adapted accordingly in the event of a change of use, which imposes higher energy-related legal requirements than the previous use.

3. The thermal building envelope or parts thereof must meet the latest energy-related legal requirements, insofar as more than just maintenance or repair work is carried out on them.

4. The government council regulates the details for existing and new buildings and facilities by ordinance. It adapts them to the state of the art as necessary. The subject of the regulations includes, in particular

a) Thermal insulation and cooling of buildings and facilities,

b) Heating systems and facilities for water heating,

c) Indoor air hygiene,

d) Ventilation and air conditioning systems,

e) Lighting,

f) Other building services facilities.

Energy Efficiency of Buildings and Installations

1. New buildings and the extension of existing buildings (such as additions, annexes, etc.) must be constructed and equipped in such a way that their requirements for heating, hot water, ventilation, and air conditioning are minimized.

2. The government council shall regulate by ordinance the nature and extent of the requirements for energy use. In doing so, it shall particularly consider the economic feasibility as well as special circumstances such as climate, shading, or neighborhood situations.

Energy Efficiency of Buildings and Installations

1. The replacement of an electric water heater is subject to notification.

2. The heating of domestic hot water in new installations or replacements of water heaters for residential buildings and residential uses in non-residential buildings must not be exclusively through direct electric heating.

3. The government council may provide exemptions by regulation.

Energy Efficiency of Buildings and Installations

1. For the indication of the energy consumption of buildings, the Cantonal Energy Performance Certificate (GEAK®) exists in the canton. For building owners, the creation of such a certificate is voluntary.

Energy Efficiency of Buildings and Installations

1. New buildings with central heating supply for five or more units must be equipped with devices to measure individual hot water consumption.

1bis. New buildings that receive heat from a central heating supply for a group of buildings must be equipped with devices to measure heat consumption for heating, per building.

1ter. Existing buildings with central heating supply for five or more units must, during a complete renovation of the heating or hot water system, be equipped with devices to measure individual heat consumption for the renovated system.

2. Existing groups of buildings with central heating supply must be equipped with devices to measure heat consumption for heating, per building, when the building envelope of one or more buildings undergoes significant renovation.

3. The government council can regulate exceptions through ordinance for buildings with an energy standard above the legal minimum requirements or when implementation is disproportionate.

Energy Efficiency of Buildings and Installations

**1. New Heat Generators with Fossil Fuels**

New heat generators with fossil fuels are permissible if it can be demonstrated that no more energy-efficient heat generators or heat supplies are available that provide a lower CO2 output, are sufficient for the intended application, and are economically viable.

**2. New Fixed Electrical Resistance Heaters for Building Heating**

New fixed electrical resistance heaters for building heating are not permissible. Exceptions include, in particular, applications for comfort and emergency heating in limited scope, as well as heaters for buildings that are not regularly or only specifically used or have a low heating energy requirement.

**3. Replacement of a Fixed Electrical Resistance Heater with a Water Distribution System**

The replacement of a fixed electrical resistance heater with a water distribution system by a similar heat generator is not permissible. Exceptions apply particularly to applications as per paragraph 2, or if replacement by another heat generator is not economically viable or is insufficient for the application.

**3a. Installation of a Fixed Electrical Resistance Heater as Auxiliary Heating**

A fixed electrical resistance heater must not be used as auxiliary heating.

**4. Installation of Technologically Advanced Heat Generators**

Only heat generators that correspond to the state of the art may be installed.

**5. Regulation by the Government Council**

The government council regulates by ordinance the exceptions when economic viability is not present, as well as the requirements for the proofs.

Energy Efficiency of Buildings and Installations

1. The replacement of the heat generator is subject to notification.

2. In the replacement of the heat generator, existing buildings with residential use must be equipped so that the proportion of non-renewable energy does not exceed 90% of the relevant demand.

3. These requirements are fulfilled by implementing one of the standard solutions or with a certificate, as specified below or in the ordinance of the government council. For defining the standard solutions, a relevant energy demand for heating and hot water of 100 kWh per square meter of energy reference area (ERA) per year applies.

4. One of the possible standard solutions is the use of renewable gaseous or liquid fuels, if

a) in the notification procedure and during follow-up checks, it is proven that during an assumed lifetime of the installation of 20 years, a minimum proportion of renewable energy is used. The government council sets the required minimum proportion after prior consultation with the industry by the responsible department. The energy suppliers ensure the verifiability of the certificates for the renewable fuel shares contained in the standard product and give the department access upon request, or

b) in the notification procedure, certificates for renewable energy are submitted, which provide the proof according to paragraph 2 in a timely manner for an assumed lifetime of the installation of 20 years.

5. The application of the standard solution according to paragraph 4 further requires that

a) the use of these fuels is attributable, considering the national weighting factors, to the extent that it achieves an emissions reduction in the greenhouse gas inventory of Switzerland in the current or the two previous years,

b) the certification is carried out by recognized bodies,

c) the accounting is performed by a recognized, central entity, whose data is publicly accessible over the internet as necessary.

6. The standard solutions SL1, SL7 to SL9, and SL11 must be implemented within three years from the granting of the permit. Measures already taken will be considered.

7. The government council regulates the details by ordinance.

Energy Efficiency of Buildings and Installations

1. The authority may exempt from the obligation according to § 7a paragraph 2 if a financial hardship exists; in extraordinary circumstances, it may also permit an alternative solution.

2. A financial hardship exists if there are insufficient own resources to implement § 7a paragraph 2.

3. Anyone claiming extraordinary circumstances must demonstrate that implementation in all permissible variations is technically impossible, economically unreasonable, or disproportionate considering the overall circumstances.

4. The government council shall regulate the details and exemptions in minor cases by ordinance.

Energy Efficiency of Buildings and Installations

1. Owners of existing buildings with central fixed electrical resistance heating systems or those that are decentralized and do not have a water distribution system must have a GEAK Plus prepared within 5 years after the entry into force of this provision, which specifically indicates how the heating systems can be replaced.

2. Buildings for which a GEAK Plus cannot be prepared, as well as buildings pursuant to § 7 para. 2, are exempt from this obligation.

Energy Efficiency of Buildings and Installations

1. New permanently installed outdoor heaters must be operated using renewable energy or waste heat. Exceptions are permissible if safety requires it and structural or operational measures are disproportionate. In such cases, the heaters must be operated with a temperature- and humidity-dependent control system.

2. Existing permanently installed outdoor heaters must be adapted to the requirements of new installations upon replacement or modification.

3. Mobile outdoor heaters, such as patio heaters or radiant heaters, are only permissible for short-term use.

4. The government council shall regulate the details and exceptions by ordinance if economic feasibility is not attainable.

Energy Efficiency of Buildings and Installations

1. The construction of new heated outdoor swimming pools is permitted only when they are operated using renewable energy or waste heat. Heating with a heat pump is allowed if there is a cover to prevent heat loss from the water surface.

2. Existing heated outdoor swimming pools must be brought up to the standards required for new installations during renovations or when replacing technical equipment used for heating.

3. The governing council shall regulate exceptions by ordinance if economic feasibility is not achieved.

Energy Efficiency of Buildings and Installations

1. The competent authority may require large consumers to investigate, evaluate, and take reasonable measures to optimize their energy consumption. Measures are deemed reasonable if they are in accordance with the state of the art, economically viable, and do not cause significant operational disadvantages.

2. Exempted are large consumers who commit, individually or in groups, to comply with targets for energy consumption development set by the competent authority. They may be exempted from adhering to specific energy-related regulations.

Energy Efficiency of Buildings and Installations

1. In the provision and supply of their own buildings and facilities, the canton and municipalities ensure a sustainable and efficient use of energy, insofar as the investments are economically viable. They aim for an energy standard that exceeds the legal minimum requirements.

2. The canton and municipalities, when procuring energy, particularly consider renewable energy sources and new forms of energy use, as well as new technical processes to enhance energy efficiency and energy recovery.

3. If appropriate measures that exceed the requirements of this law are implemented in buildings and facilities subsidized by the canton, the additional costs associated with these measures should not lead to a reduction in subsidies.

Energy Efficiency of Buildings and Facilities

1. The Government Council is authorized to permit deviations from §§ 4-11 within a limited perimeter, in order to test new solutions that equally or more effectively reduce CO2 emissions, while considering supply security.

Energy Efficiency in Mobility

1. The canton may enact independent legal foundations to support the objectives in accordance with § 2, aimed at increasing energy efficiency and improving the CO₂ balance in mobility. The regulations particularly cover measures in the areas of transportation infrastructure, propulsion systems, and low CO₂ mobility.

Planning and Implementation Measures

1. The Government Council shall develop an energy plan for a period of ten years, which shall be reviewed at least every five years and adjusted as necessary. The Grand Council approves the energy plan and may request amendments.

2. The energy plan sets out the targeted goals and pathways and assesses the achievement of these goals as well as the energy supply security in the canton during the previous planning phase. It outlines measures to achieve the goals and pathways and to strengthen supply security in the subsequent planning phase.

3. As a basis for the energy planning, the canton primarily relies on already available data, particularly from public administrations, energy utilities, and significant energy-consuming end-users. These entities shall provide the necessary data for the energy planning, as long as such data is available or can be collected with minimal effort.

4. The canton may provide reasonable compensation for data procurement if the effort is substantial and the data are important for the energy planning.

5. Confidentiality interests shall be preserved.

Planning and Implementation Measures

1. Municipalities may develop their own energy plans based on cantonal energy planning, which must be coordinated regionally with those of neighboring municipalities. This is decided by the municipal council and is binding on authorities.

2. Municipalities may impose stricter energy requirements in usage plans according to construction legislation for buildings with residential, service, and mixed-use than those specified by this law. The requirements must be in accordance with the state of the art.

3. According to usage plans under construction legislation, municipalities may require property owners to connect their heating system to a public district heating network that utilizes waste heat or renewable energies if

a) the energy is offered at technically and economically viable conditions, and

b) the area is designated accordingly in the municipal energy planning.

4. When designating areas as per paragraph 3, existing pipeline infrastructures must be taken into account.

5. Exempted from this requirement are those who meet the majority of their heating and hot water needs with renewable energies or with waste heat that cannot be utilized otherwise.

Promotional Measures

1. The canton, in cooperation with municipalities as well as public and private organizations and companies, ensures good information in accordance with the purposes and objectives of this law.

2. It may support projects by public and private organizations in the areas of information, consultation, education, continuing and advanced training.

Promotional Measures

1. The canton may support programs, projects, and facilities in the areas of research, production, use, distribution, and mobility. It specifically promotes programs and projects related to increasing energy efficiency, renewable energies, waste heat utilization, and low CO₂ mobility, provided these serve the achievement of the targets according to § 2.

2. There is no legal entitlement to benefits according to this law.

3. The benefits provided by the canton may be subject to conditions.

4. They are carried out according to a promotion program periodically approved by the Council of State, in which the objectives, priorities, and criteria for the application of the promotion instruments are determined.

Power Generation Facilities

1. Electricity generation facilities using fossil fuels may be constructed if waste heat is utilized properly and to a substantial extent. If fossil fuels with lower CO₂-equivalent emissions are available, these shall be used. This requirement does not apply to facilities without connection to the public electricity distribution network.

2. Electricity generation facilities using renewable gaseous fuels may be constructed if waste heat is utilized properly and predominantly. This requirement does not apply to facilities operated mainly with agricultural green waste, which are not connected to the public gas distribution network and cannot be connected without disproportionate effort.

3. Electricity generation facilities using renewable solid or liquid fuels may be constructed if waste heat is utilized properly and to a substantial extent.

4. Electricity generation facilities for emergency power supply, whose waste heat is not utilized, may be constructed and operated in emergencies as well as for short test runs.

**Energy Generation Facilities**

1. The government council establishes requirements for the minimum energy benefit of energy generation facilities through regulation. In doing so, the technology of generation and its impact on the environment are taken into account. Obtaining a construction or operating permit is contingent upon achieving the required minimum energy benefit.

**Energy Generation Facilities**

1. Major energy generation facilities require an operational permit from the Government Council, unless the facilities are subject to specific federal legislation.

2. The Government Council shall establish threshold values related to capacity for the delimitation of the operational permit requirement based on the type of energy generation facilities, by ordinance.

3. The cantonal operational permit particularly regulates the scope, type, duration, and termination as well as obligations upon the termination of operations. It may include additional provisions, notably regarding

a) Commissioning,

b) Operational safety,

c) Minimum benefit,

d) Obligation to compensate for proven municipal and regional locational disadvantages,

e) Liability for special risks,

f) Insurance requirement,

g) Maintenance of energy supply,

h) Securing costs for decommissioning,

i) Transfer of the permit,

k) Revocation.

4. The municipal council shall issue the building permit concurrently with the cantonal operational permit.

Power Generation Facilities

1. The host municipalities of large energy production facilities may agree on a compensation with the holder of the operating license. This compensation must be appropriate and economically sustainable for the operation.

Power Lines

1. Property owners are obligated to tolerate the transmission of grid-bound energy across their territory.

2. The obligation to tolerate persists even if the grid-bound energy does not serve their properties.

3. Unless otherwise provided by federal law, jurisdiction and procedure are governed by the provisions of building legislation.

4. Network operators must provide authorities with the necessary information regarding the course of their lines.

5. New lines must be constructed in an environmentally friendly manner, with minimal losses, and according to the latest technological standards.

Energy Lines

1. Gas Pipeline Installations, for which the canton is responsible according to federal law, are approved by the competent department. The approval constitutes an expropriation title.

2. The Executive Council regulates the procedure by ordinance in accordance with federal law.

Power Supply

1. The government council designates the network areas for each network level and assigns them to the network operators in a non-discriminatory manner. In doing so, it takes into account the existing ownership and contractual relationships as well as the supply structures, incorporating the overall economic interests.

2. If no end consumers or electricity producers are connected to a network level, the designation and assignment of the network area may be dispensed with.

3. The network operator shall promptly inform the responsible department of any changes that affect the operation or ownership relationships.

4. The responsible department may decide on adjustments to the network areas and regulate exceptions. Its decisions are appealable to the administrative court.

5. The government council may revoke a network area assignment without compensation if

a) the supply can no longer be ensured,

b) legal provisions or important ancillary provisions of the network assignment or the service contract are violated despite a warning.

Power Supply

1. Property Owners Bear the Costs for the Connection.

Power Supply

1. The Government Council may associate the allocation of network areas to network operators with a performance mandate. The performance mandate must neither favor nor disadvantage individual network operators.

2. In doing so, it shall take into account the interests of the municipalities.

Power Supply

1. The Executive Council may decide on measures to harmonize disproportionate differences in network usage tariffs. In particular, it may oblige network operators to impose an additional charge on the network transmission costs for the compensatory financing of network usage tariffs.

Power Supply

1. The Grand Council may set a maximum limit for the compensation that municipalities can demand from network operators for transit rights.

Electricity Supply Company

1. The canton and municipalities may establish and operate energy facilities themselves if the private sector does not meet or insufficiently meets the related needs. They may participate in such enterprises or enter into the necessary cooperation agreements.

2. The Grand Council decides on the establishment of cantonal facilities or enterprises and regulates their organization and operation. It decides on the canton’s participation in energy supply companies and approves the corresponding agreements. The referendum according to the cantonal constitution remains reserved.

3. The Executive Council has the authority to finally approve amendments to the contract for the founding of the company Nordostschweizerische Kraftwerke AG (NOK) if they concern the following matters

a) Changes in contracting parties and shareholding structures,

b) Composition of the Board of Directors,

c) Options for the disposal of shares,

d) Obligations to supply or procure electrical energy,

e) Axpo AG's preferential right to acquire concessions.

4. The enterprises organized under this law by the state and municipalities shall contribute with their activities to achieving the objectives of this law.

Electricity Supply Company

1. The Executive Council may transfer the obligations that arise for the canton in connection with the procurement of electrical energy from the contractual obligations towards Axpo AG to AEW Energie AG without the right to compensation by the canton.

2. The transfer of shares to third parties requires the approval of the Grand Council. If such a resolution includes the transfer of 50% or more of the total shares, it is subject to a referendum according to the cantonal constitution.

3. Decisions of the Grand Council concerning a merger of AEW Energie AG with other companies or concerning the incorporation of AEW Energie AG into a holding company are subject to a referendum if the canton holds less than 50% in these companies.

Electricity Supply Company

1. The Government Council exercises all shareholder rights that belong to the Canton.

2. For amendments to the statutes that reduce the voting rights of the Canton, the Government Council obtains the consent of the Grand Council.

3. The Government Council, within the scope of its voting rights, ensures that the hydroelectric power plants and networks remain in public Swiss ownership.

Enforcement

1. The municipal council enforces the energy regulations on buildings and installations, unless this law or its implementing provisions specify otherwise.

2. Jurisdiction and procedures in the municipalities are governed by the provisions of building legislation.

Enforcement

1. The competent department may verify compliance with the regulations through random sampling in support of the official enforcement by the municipal council.

Enforcement

1. The Council of Ministers issues the necessary implementation provisions by ordinance.

2. It determines which energy generation facilities must be registered on a platform designated by the canton. The data may be used by the canton for statistical purposes and by the municipality for their enforcement tasks.

3. It regulates the details by ordinance.

Enforcement

1. The Executive Council shall report to the Grand Council every five years on the status of the implementation of the Energy Act.

2. The report shall in particular provide information on

a) the achievement of the set goals,

b) the effects of individual measures as well as the cost-benefit ratio,

c) untapped potentials,

d) developments at the federal level and long-term trends,

e) any need for amendments to the Act.

Enforcement

1. In extraordinary circumstances, particularly in cases of unreasonable hardship, the competent authority may allow exceptions to the provisions of this law or its implementing regulations.

2. The exception permit may be subject to conditions and requirements, and may be limited in time.

3. The application for an exception permit must meet the criteria of the competent authority. Applicants may specifically be required to submit special evidence (such as monument preservation, building physics, etc.).

Transitional and Final Provisions

1. A fine of up to CHF 50,000.- shall be imposed on anyone who

a) * Violates regulations concerning the energy demand and indoor air hygiene of buildings and installations (§§ 4 and 4a),

abis) * Violates the reporting obligations and other duties in accordance with §§ 4b, 7a, 7c, and 32 paragraph 2,

b) Violates regulations concerning the measurement of heat consumption (§ 6),

c) Violates regulations concerning the admissibility of heating systems and electricity generation facilities (§§ 7-9 and 17),

d) Violates obligations of large-scale consumers regarding energy consumption (§ 10),

e) Violates regulations on energy efficiency and the use of renewable energy in the mobility sector (§ 12),

f) Violates regulations concerning the efficiency of energy facilities (§ 18),

g) Violates the terms of an operating license or a service agreement (§§ 19 and 25),

h) Violates the obligation to pay compensation contributions for large energy generation facilities (§ 19),

i) Violates obligations of network operators regarding the alignment of different network usage tariffs (§ 26).

2. Punishable is the intentional or negligent violation committed by

a) The builder,

b) The owner,

c) Other entitled parties,

d) Project authors,

e) Companies,

f) The holder of an operating license,

g) Site managers.

3. If the violation is committed for profit, the judge is not bound by the maximum amount of the fine.

4. Instead of a legal entity or a general or limited partnership, natural persons who acted or should have acted on their behalf shall be held liable. If these individuals cannot be identified without disproportionate investigative effort, the legal entity or partnership shall be sentenced to pay the fine.

5. Additionally, the provisions of the general part of the Swiss Criminal Code shall apply.

Transitional and Final Provisions

1. The administrative penalty can be imposed independently or alongside measures of administrative coercion.

Transitional and Final Provisions

1. The judicial authorities are responsible for the investigation and evaluation of violations of this law.

2. The municipal council may impose fines up to CHF 2,000 through a penal order. The procedure is governed by the provisions of municipal legislation. If a fine exceeding CHF 2,000 is at issue, the municipal council will file a criminal complaint.

3. The cantons and municipalities have the rights of a party in criminal proceedings and may be represented by their organs.

Transitional and Final Provisions

1. As long as the Canton holds the majority of the voting shares of AEW Energie AG and the assignment of the network area pursuant to § 23 paragraph 1 and the issuance of service mandates pursuant to § 25 have not been legally finalized, a service mandate for AEW Energie AG shall be established by decree.

2. Building applications pending at the time of the entry into force of the amendment on April 23, 2024, shall be assessed according to the previous law.

Transitional and Final Provisions

1. This law shall be published in the legislative collection after the unused expiration of the referendum period or upon acceptance by the populace. The governing council shall determine the date of its entry into force.

Need to analyze how this provision applies to your matter?

Cross-reference this statute against case law, commentaries, and related legislative provisions inside Legislator AI.

Open in Legislator →