# IEHC 85 — IEHC 85 — High Court

**Case Number:** IEHC 85
**ECLI:** ECLI:IE:HC:2026:85
**Court / Authority:** High Court
**Decision Date:** 2026
**Canonical Legislator URL:** https://legislator.ch/en/case/ie/2026_IEHC_85/iehc-85-iehc-85-high-court

## Decision Summary (Facts, Holding & Outcome)

THE HIGH COURT PLANNING & ENVIRONMENT [2026] IEHC 85 Record No: 2025/ 1063 JR IN THE MATTER OF THE LOCAL GOVERNMENT (NO. 2) ACT, HOUSING ACT, 1966 AND THE PLANNING AND DEVELOPMENT ACT, 2000 (AS AMENDED) AND IN THE MATTER OF GALWAY COUNTY COUNCIL (CONNEMARA GREENWAY PROJECT – CLIFDEN TO OUGHTERARD COUNTY GALWAY) COMPULSORY PURCHASE ORDER NO. 2/2024 Between/ OLIVER JOYCE Applicant and AN COIMISIÚN PLEANÁLA Respo...

## Headnote / Official Regeste

THE HIGH COURT PLANNING & ENVIRONMENT [2026] IEHC 85 Record No: 2025/ 1063 JR IN THE MATTER OF THE LOCAL GOVERNMENT (NO. 2) ACT, HOUSING ACT, 1966 AND THE PLANNING AND DEVELOPMENT ACT, 2000 (AS AMENDED) AND IN THE MATTER OF GALWAY COUNTY COUNCIL (CONNEMARA GREENWAY PROJECT – CLIFDEN TO OUGHTERARD COUNTY GALWAY) COMPULSORY PURCHASE ORDER NO. 2/2024 Between/ OLIVER JOYCE Applicant and AN COIMISIÚN PLEANÁLA Respo...

## Full Text of the Judgment

THE HIGH COURT
                            PLANNING & ENVIRONMENT
                                                                             [2026] IEHC 85
                                                                 Record No: 2025/ 1063 JR


 IN THE MATTER OF THE LOCAL GOVERNMENT (NO. 2) ACT, HOUSING ACT, 1966
        AND THE PLANNING AND DEVELOPMENT ACT, 2000 (AS AMENDED)
       AND IN THE MATTER OF GALWAY COUNTY COUNCIL (CONNEMARA
           GREENWAY PROJECT – CLIFDEN TO OUGHTERARD COUNTY
               GALWAY) COMPULSORY PURCHASE ORDER NO. 2/2024



Between/

                                     OLIVER JOYCE

                                                                                    Applicant

                                            and

                              AN COIMISIÚN PLEANÁLA

                                                                                  Respondent

                                            and

                            GALWAY COUNTY COUNCIL

                                                                                 Notice Party

JUDGMENT of Ms. Justice Emily Farrell delivered the 16th February 2026


Introduction
1. Planning consent was granted under section 175 of the Planning and Development Act, 2000
  by An Coimisiún Pleanála (then called An Bord Pleanála) for the Connemara Greenway
  Project – Oughterard to Clifden on 8th March 2013 (reference 07.JA0033). The Greenway
  will be approximately 52 kms long and, as of the date of the Report prepared by the Inspector
  for the CPO decision, 14.75km of the Greenway had been constructed and 6.5km were under
  construction.



                                              1
2. The Applicant owns lands near Clifden, Co. Galway which include a segment of the
  Greenway route and which have been in his family’s ownership since the 1940s. The lands
  are part of the old railway bed of the Galway to Clifden rail line. The lands the subject of
  these proceedings are between the part of the Greenway that has been constructed and that
  which is under construction.

3. An Environmental Impact Assessment Report and Natura Impact Statement were included
  in the application for planning consent. When the planning consent was granted, there was
  no objection to the Connemara Greenway Project traversing the Applicant’s lands. The
  Applicant describes that consent as having been made on a permissive basis.


4. Galway County Council made a compulsory purchase order (‘CPO’) on 9th July 2024 in
  respect of a 6.75km strip of land, which is stated to be required for the Connemara Greenway
  Project connecting Oughterard with Clifden. These lands include a strip of land which runs
  through the lands owned by the Applicant. The CPO was affirmed by An Coimisiún Pleanála
  on 16th May 2025 (ABP 320230-24), having held an oral hearing. The letter of 4th June 2025
  from the Commission is to be read with the Order of 16th May 2025, as that Order contained
  a clerical error.

5. The Applicant participated in the compulsory purchase process, as the legal representative
  of the late Mary Joyce.


6. Leave to apply for judicial review was granted to challenge the Commission decision to
  affirm the CPO on the grounds set out at paragraph E of the Statement of Grounds filed on
  10th July 2025.

7. The grounds on which the Applicant seeks to impugn the CPO include the contention that
  the EIA Directive and/or the Habitats Directive apply to the decision to confirm the CPO
  as, he contends, it is part of the planning consent. The Applicant contends that the
  Commission was not entitled to rely on an EIAR or NIS prepared for the scheme authorised
  in 2013 as that scheme is fundamentally different to the current scheme as it was based on
  permissive access, rather than compulsory acquisition of lands.

8. The Inspector stated, at §4.1.3 that “The planning consent for the Greenway addressed the
  relevant planning and environmental considerations arising.” It is not in dispute that a fresh

                                              2
   EIAR and NIS were not before the Commission, and that the Commission did not carry out
   AA screening or a preliminary examination as part of the CPO process.



9. The Applicant contends that a fresh EIA and NIS were required as he contends that the
   scheme the subject of the CPO is fundamentally different to the scheme for which planning
   consent has been granted. He submits that as the use of the lands was assessed for those
   purposes on the basis that the lands would not be compulsorily acquired, severance of the
   Applicant’s lands was not proposed, and as a result, the environmental impacts of the
   scheme will be fundamentally different.


10. Leave to apply for judicial review was granted on 21st July 2025 to seek the reliefs at
   paragraphs D (1) – (7) of the Statement of Grounds on the grounds set out at paragraph E.
   The Applicant seeks an order declaring that costs protection applies in respect of these
   proceedings.

11. Opposition papers have not yet been filed, although it seems clear that the Respondent and
   Notice Party do intend to oppose the substantive application.


Application for Costs Protection
12. The application before the court is the Applicant’s application for a declaration that he is
   entitled to costs protection. The Notice of Motion, issued on 23rd July 2025, seeks orders
   including a declaration that “the protective costs provisions of Section 50B of the Planning
   and Development Act, 2000, as amended and/or Section 3 of the Environment
   (Miscellaneous Provisions) Act, 2011 and/or Order 99 and/or Section 169 of the Legal
   Services Regulation Act, 2015 as interpreted in the light of Article 9 of the Aarhus
   Convention apply to the above-entitled proceedings.” However, in the submissions filed by
   the Applicant and made in support of this application, and the Statement of Case, reliance
   was placed solely on section 50B of the 2000 Act.


13. The Applicant contends that the CPO relates to a scheme which is fundamentally different
   to that which for which section 175 consent was granted in 2013, the difference being the
   compulsory rather than permissive nature of the scheme. The Applicant also submits that
   the fact of the division of the land is also material, and that the fencing and access
   arrangements which will be required are materially different. It is submitted that the CPO

                                               3
   forms part of the development consent, as in King v. An Bord Pleanála [2024] IEHC 6, and
   accordingly section 50B applies. As a result, the Applicant submits, at least preliminary
   examination or EIA screening and Stage I screening under the Habitats Directive are
   required.

14. The Commission and Galway County Council submit that the CPO simply follows and
   gives effect to the 2013 development consent and is neither a development consent nor part
   of a multi-stage development consent procedure. The Commission, and the Council rely on
   Clancy v. An Bord Pleanála (No.2) [2023] IEHC 464 and Clancy v. An Bord Pleanála (No.3)
   [2025] IEHC 528. The Council also submits that the decision to affirm the CPO was not
   made pursuant to a statutory provision which gives effect to any of the EU legislation listed
   in section 50B, which is not engaged, nor did that decision involve issues of EU
   environmental law.

15. Section 50B applies to judicial review proceedings in which challenge, inter alia, a decision
   made
       “pursuant to a statutory provision which gives effect to –
       “(I) a provision of the Environmental Impact Assessment Directive (within the meaning
       of the Planning and Development Act 2024) to which, by virtue of paragraph 1 of
       Article 11 of that Directive, the said Article 11 is subject,


       (II) Directive 2001/42/EC of the European Parliament and of the Council of 27 June
       2001 on the assessment of the effects of certain plans and programmes on
       the environment,


       (III) a provision of Directive 2010/75/EU of the European Parliament and of the
       Council of 24 November 201020 on industrial emissions (integrated pollution
       prevention and control) to which, by virtue of paragraph 1 of Article 25 of that
       Directive, Article 24 of that Directive is subject, or


       (IV) paragraph 3 or 4 of Article 6 of the Habitats Directive (within the meaning of the
       Planning and Development Act 2024)”




                                                4
16. The Commission and Council agree that costs protection applies in respect of this
  application.



Costs Protection Principles
17. The parties agree that Heather Hill Management Company v. An Bord Pleanála [2024] 2
  I.R. 222; [2022] 2 I.L.R.M. 313; [2022] IESC 43 is the leading authority on costs protection.
  They also rely on King v. An Bord Pleanála [2024] IEHC 6 and Clancy v. An Bord Pleanála
  (No. 1) [2023] IEHC 233, Clancy v. An Bord Pleanála (No. 2) [2023] IEHC 464 and Clancy
  v. An Bord Pleanála (No. 3) [2025] IEHC 538. The Applicant also relies on the judgment
  of Simons J. in An Taisce v. Aquaculture Licences Appeals Board [2024] IEHC 60, in which
  an extension of time to institute proceedings was refused.

18. An applicant who satisfies the following three conditions is entitled to benefit from costs
  protection under section 50B:
       (a) the proceedings comprise an application for judicial review or for leave to seek
          judicial review,
       (b) the decision of which judicial review is sought is made pursuant to a statutory
          provision, and
       (c) the statutory provision is one which gives effect to one of four named EU
          Directives.

19. As was clarified in Heather Hill, once these conditions are satisfied, costs protection
  applies to the entirety of the proceedings. It is not necessary that the grounds relied upon
  involve issues of EU law: King v. An Bord Pleanála (§39).

20. Conditions (a) and (b) are satisfied in this case: that is not in dispute. Both the
  Environmental Impact Assessment Directive (Directive 2011/92/EU) and the Habitats
  Directive (Directive 92/43/EEC) are listed. The only question is whether the decision to
  confirm the CPO was made pursuant to a statutory provision which gives effect to one of the
  four EU Directives named in section 50B.



The effect of the CPO
21. Approval for the construction of the Greenway was granted by the Commission in 2013.
  That decision has not been impugned. The Applicant submits that approval was granted for

                                              5
  a development which was described as permissive – he submits that the EIAR and NIS were
  prepared on the basis that there would be no objection to the creation of a public right of
  way over the lands utilised for the Greenway. The only physical difference relied upon by
  the Applicant was that he submitted that fencing, or different fencing, would be required to
  separate the acquired lands from those retained by him.

22. The Applicant submits that there has been a fundamental modification in the scheme due
  to the compulsory acquisition of the lands, rather than the permissive scheme envisaged in
  2013. For this reason, he contends that the CPO is part of the development consent process
  and submits that following King, EIA is required, as is AA screening, at a minimum. The
  Commission and Council submit that the instant case is indistinguishable from Clancy, as
  the CPO simply gives effect to the Greenway, which scheme was approved in 2013.

23. There appear to be two possible arguments as to how to approach the question of costs
  protection in a situation such as here. Only the first was actually made, but I will consider
  the second for completeness:
           (1) By asking whether the impugned decision of the Commission amounted to a
              development consent, or was part of a multi-stage development consent, and if
              so, whether that gives rise to a right to costs protection
           (2) If not, by asking whether the Commission’s decision was made under a statutory
              provision which gives effect to one of the four Directives identified in section
              50B.



Approach 1 – whether the CPO was a development consent or part of a multi-stage
consent
24. The lands the subject of the CPO are included in the lands authorised for construction of
  the Greenway in 2013. At §12.1.8 of his Report, the Inspector noted that “the lands to be
  acquired are in accordance with the route and consistent with the consent approved by the
  Board under Board reference PL/07 JA0033 in 2013.” At §10.1.6 it was stated that “the
  extent of the land that would be acquired under the CPO is determined by the specifications
  of the proposed greenway layout design and its associated construction works. I am satisfied
  that the land proposed to be acquired by the Council is required to accommodate the
  completion of these sections of the Connemara Greenway Route…”



                                               6
25. The Applicant submits that there are two material differences between the development
  authorised in 2013 and the scheme which he submits the CPO will give effect to. He submits,
  firstly, that the issue of compulsory acquisition was not addressed in the EIAR and the NIS
  and that both were based on permissive access, as was the authorisation granted. Secondly,
  it is submitted that the type of fencing envisaged is different to that which was authorised
  by the Order made in 2013, and that as a result, a new EIAR and NIS are required. During
  the hearing it was accepted that, had there been agreement between the Applicant and the
  Council that the type of fencing currently envisaged would be erected, it would be permitted
  by the 2013 authorisation. However, the Applicant states that his consent to the erection of
  such fencing would never have been forthcoming.

26. At §1.6 of the Inspector’s Report, which was opened by the Applicant, the Report prepared
  for the 2013 authorisation was referred to. The Inspector stated:
       “The Inspector outlined within Section 2 of his report that the ‘Greenway would be
       developed as a permissive trail, and that in the event that agreement is not reached with
       landowners, the use of Compulsory Purchase Order (CPO) powers or the establishment
       of a public right of way along the route maybe examined at a later stage in order to
       proceed with the development’.” (emphasis added)


27. The Applicant relies on the statement at §7.3.2 of the Inspector’s Report, that “The 2013
  consent permitted by the Board was proposed and approved on the basis that the Greenway
  would be developed on a permissive access basis and not to be acquired under CPO powers,
  which is entirely different.” However, I accept the submission of the Council that the
  Inspector had recited the submission made by another objector; the Inspector made no such
  finding.


28. I am satisfied that the scheme as authorised in 2013 contemplated compulsory purchase if
  the landowners did not consent to the works authorised by the Order of 8th March 2013.
  Even if I am incorrect in finding that the development authorised in 2013 was not confined
  to a permissive scheme, the change in ownership from the Applicant to the Council, albeit
  compulsorily, is not a matter to which EIA, or AA applies. The Court of Justice stated in C-
  420/20 Leth that environmental impact assessment under the EIA Directive (then Directive
  85/337) does not include an assessment of the effects of the project on the value of material
  assets. (§48)

                                              7
29. While the Applicant avers that the type of the fencing which will be erected is different to
   that authorised in 2013, that is not evident from the materials before the court, which include
   the Board Order, the EIAR and unchallenged statements of the Commission’s Inspector in
   his report on the CPO dated 31st March 2025. It is clear therefrom, that the possibility of the
   erection of fencing along the entire route, was considered in the process which led to the
   2013 authorisation. It is also clear that there was flexibility as to the type of the fencing
   which would be erected.

30. At §4.2.2 of the Inspector’s Report, reference is made to the Brief of Evidence (which was
   before the Commission) and it is stated:
       “Details of fencing and gateway access along the Greenway are provided within
       Appendix B of AMJ’s BoE. A 1.2 m high post and rail timber fence or other appropriate
       boundary fencing on each side of the Greenway, including installation of stock proof
       fencing with a double barbed wire layer above sheep wire fencing, where appropriate.”


31. It was submitted on behalf of the Council, which has not filed an affidavit in response to
   this application, that its stated position remains that noted at §6.3.3 of the EIAR i.e.
       “It will be necessary to fence both sides of the Greenway where landowners require it.
       Fencing will not be provided where the landowner specifically requests this to be the
       case. At areas where livestock need to be moved there are a number of different options
       to enable farmers to move livestock in a safe manner both for the stock and for
       Greenway users. Below are a number of different options for cattle stops (Image 6.3
       and 6.4), fencing (Figures 6.4 and 6.5) and cattle grid detail (Figure 6.6) which is
       dependent on the different needs of each farmer.


       It is envisaged that fencing where required alongside the proposed Greenway will be
       the first item to be dealt with by a contractor to establish the site boundaries.”
   Figure 6.4 in the EIAR refers to mesh type or barbed wire fencing where required.


32. Fencing authorised by the 2013 development consent includes fencing of the type which
   the Applicant contends will be erected if the CPO is confirmed. This was accepted by the
   Applicant in response to a question by the court – counsel accepted that the fencing which
   is proposed to be erected could be erected under the 2013 authorisation if the Applicant and
   the Council agreed to it, although the Applicant does not agree. Therefore, whilst the fencing

                                                8
  may not be what was anticipated by the Applicant, because he would not have agreed to it,
  the CPO has not altered the nature of the fencing authorised in 2013. The width of the land
  to be compulsorily acquired is slightly wider that the width of the path which will be used
  for walking or cycling.


33. The more fundamental difficulty from the Applicant’s perspective is that, unlike King, the
  development consent for the Greenway was granted in 2013 and the CPO was made to
  enable the development, which had already been authorised, to proceed. The decision of the
  Commission to confirm the CPO is neither a development consent, nor is it part of a multi-
  part development consent. Whilst the project was expected to be carried out on a permissive
  basis, it was in fact envisaged that the CPO may be required, when the project was
  authorised in 2013, and the statutory scheme provides for compulsory purchase by a local
  authority for these purposes. In King, prior to making the application for planning
  permission, Uisce Éireann proceeded with the CPO process to facilitate the proposed
  development project. The stated reason for doing so was the concern that Uisce Éireann
  might lack the requisite interest to seek planning permission without the CPO. The
  application was made prior to the Planning and Development (Amendment) (No. 2)
  Regulations 2022, which enables Uisce Éireann apply for planning permission on
  production of written confirmation of its intention to compulsorily acquire the land for the
  proposed development.

34. In King, it was held that the Applicant had established a strong case that EIA was required
  because alternative options for the location of the proposed development would be limited
  by the CPO. The parameters for the application for permission were set by the CPO, unlike
  the CPO in Clancy, where the nature and location of the development was described as a
  ‘done deal’. This basic factual distinction explains why King and Clancy are not in conflict
  – both judgments addressed the particular facts and the arguments made. Dunne v. Minister
  for the Environment, Heritage and Local Government [2006] IESC 49; [2007] 1 I.R. 194
  was distinguished in King on the basis that the decision maker in Dunne was not empowered
  to embark on a reconsideration of the environmental issues arising from the underlying
  development project nor to modify it. As the CJEU has stated in Namur-Est Environnement
  (at §72), for public participation for the purposes of EIA to be effective, the public should
  be able to express views on the project concerned and its environmental impact not only in
  a useful and comprehensive manner, but also at a juncture when all options are open. The

                                              9
  issue before the Commission in deciding whether or not to confirm the CPO is whether the
  lands should be compulsorily acquired for the purposes of carrying out the development
  authorised by the 2013 Order. As was held to have been the case in Clancy (No. 3), the
  Commission did not have the power to modify the Greenway when it confirmed the CPO.
  The sequencing of the planning permission and the CPO is critical to the question whether
  the CPO is, or is part of, the development consent: King (§60) and Clancy (No. 3) (§60).
  Insofar as the Applicant may wish to complain about compliance with the EIA Directive
  and Habitats Directive in the process which led to the grant of development consent for the
  Greenway, including that portion which is subject to the CPO, the prescribed period for
  doing so ran from the making of the Order of 8th March 2013.


35. The Applicant sought to distinguish Clancy (No. 2) and Clancy (No. 3) on the grounds that
  the planning authority had sought and obtained decisions from An Bord Pleanála ruling out
  the need for EIA and AA, prior to embarking on the Part 8 process. He does not contend
  that those cases are wrongly decided and should be departed from. In the instant case, in
  deciding to authorise the Greenway, An Bord Pleanála carried out an environmental impact
  assessment and concluded that, subject to compliance with the conditions set out in Order
  of 8th March 2013, the proposed development was not likely to have significant adverse
  effects on the environment. It also concluded, based on the information available that the
  proposed development, either individually or in combination with other plans or projects,
  would not adversely affect the integrity of any European site in view of its conservation
  objectives.

36. As in Clancy and Dunne, and unlike King and C-504/14 Commission v. Greece, the
  Commission was not empowered to embark upon a reconsideration of the environmental
  issues arising from the underlying project nor to modify the development project in deciding
  whether or not to confirm the CPO. The effect of the Order of 16th May 2025 is to authorise
  the Council to compulsorily purchase lands to be utilised to carry out development in
  accordance with a prior unchallenged development consent. As development consent had
  already been granted and could not be modified by the impugned decision of the
  Commission, no obligation to carry out an environmental impact assessment, or screening
  therefor or for AA, arose.




                                             10
37. The argument based on an alleged need for European law assessments due to an alleged
  modification of the project at CPO stage therefore fails on the facts. The CPO was not a
  development consent or part of a multi-stage consent process, did not significantly or
  materially modify the project and did not require EU law assessments.



Approach 2 – whether CPO legislation inherently gives effect to relevant Directives
38. The argument actually advanced by the Applicant was that because the scheme approved
  in 2013 was fundamentally different to that which is the subject of the CPO, the CPO is
  development consent, or at least, part of a multi-stage development consent, and as such,
  costs protection applies. The case was not made that costs protection applies to any decision
  to confirm a CPO made by the Commission under the 2000 Act. However, for completeness,
  I will consider it.


39. The fact that the Act may be construed as enabling the Commission to comply with the
  EIA Directive, or Habitats Directive, if they are required to be applied in a CPO context as
  King suggests may be the case when a CPO is confirmed prior to the grant of planning
  permission, does not mean that the provision under which the Commission made the
  decision to confirm the CPO in this case is “a statutory provision which gives effect to”
  those Directives. Domestic courts are required to construe national law in conformity with
  EU law, unless to do so would be read national law contra legem. It is clear from Joined
  Cases C-397/01 to C-403/01 Bernhard Pfeiffer & Ors v. Deutsches Rotes Kreuz,
  Kreisverband Waldshut eV European Court Reports 2004 I-08835, ECLI:EU:C:2004:584
  (in particular §115 – 119) that the obligation to construe national law in conformity with EU
  law where possible is not limited to provisions of national law enacted to implement EU
  law. It does not follow that every provision which may be construed in a compatible way
  must be regarded as giving effect to EU law. The distinction is important.


40. For this reason, if a situation arises whereby a particular CPO would require assessments
  under EU law, a decision made by the Commission to confirm a CPO in exercise of the
  functions transferred by section 214, it may be done in a manner compliant with the
  obligations of the State under the EIA Directive and Habitats Directive, by invoking the
  power to seek further information or otherwise. Such a conform ing interpretation does not
  lead to the conclusion that section 214, or the Acts to which it relates, is a provision enacted


                                               11
  to give effect to the obligations of the State under those Directives. Insofar as costs
  protection would arise in such a situation, it would arise, not under section 50B, but under
  the obligation to interpret domestic law (including the general costs jurisdiction under Order
  99 RSC) in a way which gives effect to the Aarhus Convention, so far as possible. But that
  is academic for present purposes and any final decision on that can be left to a case where
  it arises.


41. Therefore, insofar as it may be necessary to go further than deciding whether the impugned
  decision of the Commission amounted to a development consent, or is part of a multi-stage
  development consent, which I have found it is not, I do not consider that the Commission’s
  decision was made under a statutory provision which gives effect to one of the four
  Directives identified in section 50B.



Conclusion
42. The Applicant maintains that he is entitled to costs protection under section 50B of the
  2000 Act because the project for which the CPO of his land was confirmed is fundamentally
  different from the Greenway scheme authorised by An Bord Pleanála in 2013. In deciding
  whether or not the confirm the CPO, the Commission was not empowered to alter the
  Greenway Scheme, nor did it purport to do so. The impugned decision is neither a
  development consent nor is it part of a multi-stage development consent. It is distinguishable
  from King in which case Simons J. held the applicant had established a strong case for
  contending that EIA was required for the CPO.


43. Insofar as the Applicant had claimed an entitlement to costs protection under section 3 of
  the Environment (Miscellaneous Provisions) Act, 2011 and/or Order 99 and/or section 169
  of the Legal Services Regulation Act, 2015 as interpreted in the light of Article 9 of the
  Aarhus Convention in the Notice of Motion, that claim was not advanced. The application
  before the court was limited to the contention that the Applicant was entitled to costs
  protection under section 50B of the Planning and Development Act, 2000 (as amended).
  That appears to have been a reasonable approach because it is not apparent that anything
  arises from the other provisions cited that would go much further than section 50B of the
  2000 Act in the circumstances of this case.



                                                12
44. The Applicant is not entitled to costs protection in respect of proceedings brought to
   challenge the decision of the Commission made the 16th May 2025 to confirm the CPO made
   by Galway County Council in respect of lands including lands owned by him.



Order
45. The application for a declaration that the protective costs provisions of Section 50B of the
   Planning and Development Act, 2000, as amended, apply to these proceedings is refused.


46. As the Respondent and Notice Party have agreed that costs protection applies to this
   application, I propose making no order for the costs of this application. Should any party
   wish to contend that a different order should be made, written submissions (not to exceed
   1,500 words) may be filed within two weeks of the date of this judgment.

                                                                                 Emily Farrell




                                              13