High Court grants interlocutory injunction to receiver against interference with receivership functions and property management.
Legislator-Zusammenfassung
KI-generiertThe High Court granted an interlocutory injunction restraining the defendants from interfering with the receiver's conduct and functions over the Alexandra Place development. The plaintiff, a professional services partner, argued that the receiver's appointment was valid given the company's substantial indebtedness and the defendants' failure to repay loans or honor guarantees. The court emphasized the need for stability and clarity in receivership, rejecting the defendants' argument that physical possession by the receiver was irrelevant to the balance of convenience.
Legislator-Regeste
KI-generiertCampus Oil guidelines; Taite v. Beades [2013] IEHC 440; Contech Building Products Limited v. Walsh & Ors [2006] IEHC 45: An interlocutory injunction will be granted to restrain interference with a receiver's functions where the balance of convenience favors the receiver's need for stability and the applicant has moved promptly.
Schlagwörter
KI-generiertZitierte Gesetzesbestimmungen
KI-generiertZitierte Rechtsprechung
KI-generiertVerwandte Entscheide
KI-generiertVolltext
Neutral Citation: [2016] IEHC 325
THE HIGH COURT
[2015 No. 3053P]
BETWEEN:
STEPHEN TENNANT
PLAINTIFF
AND
HUGH MCGINLEY AND MCGINLEY CONSTRUCTION LIMITED
DEFENDANTS
JUDGMENT of Mr. Justice David Keane delivered on the 14th day of June 2016
Introduction
1. This is an application for an interlocutory injunction restraining any interference with the conduct of a receivership or with the
exercise of a receiver’s functions, or both
Background
2. The plaintiff is a partner in a professional services firm. He was appointed as receiver over a number of properties owned by the
defendants on the 31st March, 2015.
3. The first named defendant Mr McGinley is a businessman and property developer and is a director and sole shareholder of the
second named defendant (“the company”).
4. In 2005, the defendants acquired a site at East Road, East Wall, Dublin 3 for the purpose of developing an apartment complex and
retail units. Construction of the development, which became known as Alexandra Place, was completed in 2008 and 15 of the
apartments were sold.
5. On foot of a facility letter dated the 27th February 2008 Bank of Ireland (“the bank”) renewed a number of the company’s existing
loan facilities and extended a further loan facility to it, which combined facilities amounted to just under €28 million in aggregate.
Those facilities were expressed to be repayable on demand or, in the absence of such a demand, were to be repaid from the net sale
proceeds of the relevant properties, including those at Alexandra Place, by way of a single repayment on the anniversary of the
original draw down date.
6. The loans were secured by mortgages over a number of properties owned by the company, including the apartment complex and an
adjacent site at East Wall. Mr McGinley provided guarantees in respect of those facilities in his personal capacity.
7. As is by now well documented, the property market was then entering a downturn, which later became a collapse. A number of
proposed sales fell through and the majority of the apartments in the development were left unsold.
8. The loan facilities and attendant security interests associated with the properties were subsequently transferred to National Asset
Loan Management Limited (‘NALM’), a subsidiary of the National Asset Management Agency (‘NAMA’) in 2010.
9. It seems clear that the loan facilities were drawn down and that they were not repaid on the anniversary of that event. Instead, it
would appear that discussions ensued between the defendants and their relationship manager in the bank following which, in 2009 and
2010 the defendants set about completing works on the vacant apartments so that they might generate a rental income stream until
such time as market conditions improved and they could be sold. The defendants were responsible for the expenditure necessary to
fit out the apartments for rental and for the day to day management of the apartment complex. The defendants were to remit the
net rental income from the apartments to the bank to be applied against the defendant’s indebtedness or, at least, against the
interest accruing upon it.
10. The defendants later had to expend a further €328,690.96 on the works required to bring the underground car-park of the
apartment complex into compliance with the applicable fire safety regulations. The bank subsequently contributed €112,590.61
towards that sum with the approval of NALM/NAMA. No explanation has been provided concerning how the apartment complex came
to be constructed in such a manner that almost a third of a million euro had to be expended on the remedial works necessary to bring
it into conformity with the applicable fire safety regulations.
11. On the 1st December 2011, following receipt by the bank of a business plan submitted by the defendants, it wrote to them in its
capacity as manager of the relevant debts on behalf of NALM/NAMA, stating that the said plan was not acceptable. The letter
identified a number of issues which had to be addressed as a matter of urgency if the lender’s support for the defendants was to
continue. The letter went on to state, in material part, that neither its issue and acceptance, nor any of the discussions leading up to
it, constituted a waiver or amendment of the rights of the parties and that all such rights, including the right to enforce any security
held by NALM/NAMA, were expressly reserved and capable of being exercised without further notice.
12. On the 29th May, 2012, the bank again wrote to the defendants in the same capacity, stating that its letter was to be read in
conjunction with, and was to be deemed part of, the letter of the 1st December, 2011 just described. In particular, the second letter
stated that all terms and conditions detailed in the first letter were to remain unchanged and would continue to apply. An appendix to
the second letter sets out a “property strategy approved by NAMA” to be pursued by the company, which includes, among other
things, the rental by it of the “full scheme” at Alexandra Place, the provision of monthly rental reconciliations in that regard and the
marketing of the properties for sale in 2015.
13. By a loan sale agreement dated 20th June, 2014 made between the bank, NALM and a company named Promontoria Eagle Ltd
(“PEL”), PEL purchased the company’s loans. PEL appointed Capita Asset Services (Ireland) Limited (“Capita”) to provide loan
administration services in relation to the defendants’ loans, amongst others.
14. Upon its appointment as asset manager, Capita wrote to the defendants on the 5th September, 2014 requesting a meeting and
the provision of a cash flow projection. The requested meeting took place on 11th September, 2014, attended by Mr McGinley; his
son; staff from Capita; and staff from an entity called Cerberus European Servicing Limited (“Cerberus”), which acts as an advisor to
PEL. At that meeting, the defendants were asked to furnish a debt repayment proposal. The company submitted one on the 26th
September, 2014. By letter dated the 21st October, 2014, Capita advised the defendants that the company’s proposal had been
deemed unacceptable to PEL.
15. A number of meetings and further correspondence followed. Settlement negotiations continued into 2015. No agreement was
reached. On the 12th March, 2015, PEL issued letters of demand to the company as borrower and to Mr McGinley as guarantor. Those
letters identify an aggregate sum then due from the company in excess of €27 million and an aggregate sum then due from Mr
McGinley on foot of various guarantees in respect of those borrowings in excess of €3.6 million. It appears to be common case that, in
response to those demands, the relevant loans were not repaid and that no payment was made by Mr McGinley on foot of the various
guarantees he had provided in respect of those loans.
16. On 31st March 2015, PEL appointed the plaintiff as receiver over certain assets of the defendants comprising the property at
Alexandra Place and six other properties including land, a commercial unit, and investment properties in counties Tyrone, Donegal, and
Dublin. The plaintiff avers that, in respect of the Alexandra Place property, the receivership encompasses 57 apartments and one
occupied commercial unit. Mr McGinley avers that the Alexandra Place development comprises 73 apartments, of which 16 have been
sold, together with three commercial units and a crèche facility.
17. In turn, on 31st March, 2015, the receiver appointed Chartered Assets Property Limited (“Chartered Assets”) as property
management agents for the Alexandra Place property.
The underlying proceedings
18. A plenary summons issued on behalf of the receiver on 21st April, 2015, seeking an order for possession of, amongst others, the
Alexandra Place property; injunctions restraining the defendants from interfering with the receivership or the functions of the receiver,
from interfering with the receipt of rents by the receiver, from entering or continuing to occupy the premises, and from trespassing
upon or interfering with the receiver’s possession of the property; and, if necessary, a declaration that the receiver has been validly
appointed in respect of the property.
The relief now sought
19. The motion now before the Court issued on the 29th April, 2015. In it, the receiver seeks orders restraining the defendants from:
interfering with the receivership or with the exercise of the plaintiff’s functions; interfering with the receipt of rents from tenants;
entering or remaining in occupation of the properties concerned without the plaintiff’s permission; or trespassing on the said properties
or otherwise interfering with the plaintiff’s possession of them.
The defence to the underlying proceedings
20. Neither the company’s very substantial indebtedness; nor the significant guarantees provided by Mr McGinley in that respect; nor
the provision by the defendants of the relevant security as part of the underlying loan transactions; nor the entitlement conferred
under the relevant security instruments to appoint a receiver; nor the failure by the company to repay its debt upon demand or of Mr
McGinley to honour his various guarantees when called upon to do so; nor the formal validity of the instruments appointing the
plaintiff as receiver are in issue for the purpose of the present application.
21. Rather, the defendants contend that the plaintiff’s appointment as receiver is invalid. They do so on two principal grounds.
22. First, the defendants argue that their acceptance of the terms of the bank’s letters of the 1st December 2011, 29th May and
16th November 2012 and their course of dealings with both the bank and NALM/NAMA amount to an accomplished and binding
agreement between those parties, which they describe as a ‘management work out agreement.’ They assert that they have abided
fully by the terms of that agreement and are now in a position to see it through to completion. They submit that the enforcement of
the lender’s security through the appointment of the receiver is incompatible with the terms of that agreement and is, therefore,
invalid.
23. Second, the defendants argue that the failure by the bank or NALM/NAMA to permit them to be heard prior to the assignment or
sale of their loans to PEL was in breach of their right to natural and constitutional justice and fair procedures and that, in
consequence, the said assignment or sale was invalid, as was the subsequent appointment of the plaintiff as receiver by PEL.
24. There is no controversy or doubt that the defendants have remained in occupation of the Alexandra Place properties; have
prevented the plaintiff from taking possession of them; have interfered with the receivership and the exercise of the plaintiff’s
functions in that regard; and have interfered with the receipt of rent from tenants by the plaintiff as receiver. Of course, the
defendants say that they are entitled to do all of those things by reference to their contention that there is no lawful or valid
receivership in respect of those properties and that, accordingly, the company is the legal person entitled to remain in possession of
the property; to exclude the plaintiff from it; and to receive the tenants’ rents.
25. On the 1st April 2015, the plaintiff wrote to Mr McGinley to inform him of the plaintiff’s appointment as receiver over various
assets of the company, including the Alexandra Place property. A copy of the plaintiff’s deed of appointment was enclosed with that
letter, which included a request for details of all extant lease or rental agreements. The plaintiff avers that he has not received any
such information from either the company or Mr McGinley.
26. The defendants do not deny that the company, through its agents, has informed tenants that they should not pay rent to the
plaintiff as receiver or to the plaintiff’s agent Chartered Assets. The defendants’ solicitors wrote to Chartered Assets on the 2nd April
2015 asserting that neither the plaintiff nor Chartered Assets are entitled to receive rents. The defendants’ solicitors wrote to the
plaintiff’s solicitors on the same date in broadly similar terms and threatening an application for injunctive relief in the absence of an
immediate undertaking to refrain from taking any action in relation to the receivership assets.
27. On the 8th April 2015, a representative of Chartered Assets, who was seeking to deliver a letter or notice to tenants on behalf of
the receiver, and another gentleman accompanying him were refused access to the Alexandra Place complex by Mr McGinley’s son
Daniel McGinley and a gentleman named Patrick James Flanagan, also known as Seamus Flanagan. In an affidavit sworn for the
purposes of the present application, Daniel McGinley acknowledges, as the plaintiff has alleged, that he and Mr Flanagan refused
those persons entry on the basis that they were not willing to permit them to deliver letters on the premises without a court order. I
pause here to note that it is difficult to reconcile the stance taken by Mr Daniel McGinley and Mr Flanagan (who the company report
exhibited by the plaintiff suggests is a director of the company but who is only prepared to acknowledge on oath that he is a painter
and decorator by trade and a ‘maintenance employee’ of the company) with that adopted by the defendants’ solicitors in threatening,
though not bringing, an application for injunctive relief to restrain the plaintiff from acting as receiver. While the latter approach
acknowledges (correctly, in my view) that the defendants would require an injunction to prevent the plaintiff from carrying out his
functions as receiver by reference to the issues that they seek to raise, the former appears to suggest that it is the plaintiff who
would require the express sanction of the court to carry out his functions.
28. On the 14th April 2015, the defendants’ solicitors wrote to PEL’s solicitors, identifying the defendants’ ‘essential objection’ to the
receivership as the alleged existence of a ‘management work out agreement’ with which it was said to be incompatible. The same
letter goes on to challenge the validity of the transfer of the company’s loans from NALM/NAMA to PEL. Despite the asserted
existence of a concluded agreement concerning the ‘working out’ or compromise of the defendants’ indebtedness alleged to have been
entered into at some point between the 1st December 2011 and the 16th November 2012, and the asserted invalidity of the transfer
of the company’s loans from NALM/NAMA to PEL on the 20th June 2014, the letter asserts that the defendants had been attempting
in good faith to negotiate with PEL since the 11th September 2014. The letter concludes by stating that, failing PEL’s
acknowledgement that it is bound by the said ‘management work out agreement’, proceedings would issue to challenge the transfer of
the company’s loans to PEL and, presumably in the alternative, to seek a declaration that PEL is bound by that agreement.
29. For his part, the plaintiff has averred that during the months of meetings that occurred between September 2014 and his
appointment as receiver on the 31st March 2015, no alleged ‘work out’ agreement was mentioned at any stage, much less was any
documentation provided that would evidence any such agreement. It does appear to be common case that the defendants’ solicitors
wrote to PEL’s solicitors on the 18th March 2015 to assert that, in demanding repayment of the company’s loans, PEL was acting, or
was proposing to act, in breach of an agreement between the company and both the bank and NAMA evidenced by a letter from the
bank to the defendants, dated the 29th May 2012. If that is a reference to the letter already identified (and exhibited on affidavit by
Mr McGinley for the purpose of the present application), it would be difficult to disregard the statement on its face that it is to be
read in conjunction with, and deemed part of, the bank’s letter of the 1st December 2011.
30. And if that were so, it would be more difficult still to disregard the fact that the defendants each signed their acceptance of the
terms of the letter of the 1st December 2011, which (in material part) include the following express provisions:
“NAMA expressly reserves all of its rights and remedies arising now or subsequently:
(i) Under any facility agreement or finance document currently in existence between [the company, East Road
Developments Ltd and Mr McGinley (“the Connection”)] and NAMA and/or any [participating institution (“PI”)] and whether
any such facility agreement or finance document relates to the Connection or not;
(ii) Under any security or other document currently in existence from any part of the Connection or any third party in
favour of NAMA and/or a PI whether in respect of the liabilities or obligations of the Connection or any part thereof or any
other liabilities or obligations whatsoever in favour of NAMA and/or a PI has security;
…
Neither the issue and acceptance of this letter nor any discussions leading to the issue of this letter constitute a waiver
or amendment of the terms of (or rights of any party under) any [such document] or otherwise under any applicable law
and all such rights, including the right to enforce any security held by NAMA, are expressly reserved and may be exercised
without further notice. Any time, indulgence, delay or failure to take any action by NAMA and/or [the bank] shall not
constitute any waiver of any contravention of [any such document] or any waiver of any such rights.
For the avoidance of doubt any facilities to the Connection currently in default remain in default.
2. NAMA may terminate, in whole or in part, any support it may provide to the Connection at any time at NAMA’s sole
discretion including, without limitation, where NAMA is of the opinion that the Connection is not complying with any of the
conditions of support as set out in this letter ….
3. Compliance with the conditions and requirements specified above may warrant a further review or re-assessment by
NAMA. However, any such review or re-assessment is as the sole discretion of NAMA. This letter should not in any way be
taken as an offer or commitment by or on behalf of NAMA to consider an extended working relationship.
…
5. This letter does not constitute a legally binding commitment to create any legal obligations on or for NAMA or the
connection.”
31. As previously noted, the present proceedings commenced by plenary summons issued on the 21st April 2015. On the following
day, the 22nd April 2015, a plenary summons issued on behalf of the defendants (as plaintiffs) in proceedings against NALM, NAMA
and PEL. A Statement of Claim has since been delivered in those proceedings. In it, the defendants in these proceedings plead that
the transfer of the company’s loans to PEL was invalid or, in the alternative, that PEL is bound by the alleged “management work out
agreement”, on the basis already described. The defendants also plead that the loan repayment demand which preceded the
appointment of the plaintiff as receiver was invalid because the company was not in default under the relevant loan agreements and
because the demand was not accompanied by any account or statement, evidencing the amount then due. On that basis, the
defendants seek damages, together with a number of declarations, including declarations to the effect that PEL is not entitled to
appoint a receiver and that the appointment of the plaintiff as receiver is invalid.
Present application - test to be applied
32. This is an application governed by the principles recognised by the Supreme Court in Campus Oil Ltd. v. Minister for Industry and
Energy (No. 2) [1983] I.R. 88. That is to say, the plaintiff must establish that he has raised a fair bona fide question; that an award
of damages would be inadequate to compensate him for any loss he might suffer if an injunction is not granted; and that the balance
of convenience favours the grant, rather than the refusal, of the injunction or injunctions sought.
Fair bona fide question
33. I have no doubt that, prima facie, on the basis of the matters already identified as not in dispute between the parties, the
plaintiff has raised a fair bona fide question to be tried concerning the validity of his appointment as receiver of the properties at
issue and his entitlement to exercise his functions as such. Those maters include: the company’s very substantial indebtedness; the
significant guarantees provided by Mr McGinley in that respect; the provision by the defendants of the relevant security as part of
the underlying loan transactions; the entitlement conferred under the relevant security instruments to appoint a receiver; the failure
by the company to repay its debt in accordance with the terms of the relevant loan agreements and, later, upon demand; the failure
of Mr McGinley to honour his various guarantees when called upon to do so; and the formal validity of the instruments appointing the
plaintiff as receiver.
34. It seems to me that to consider instead the question of whether the defendants have raised a fair bona fide question on any of
the defences to the plaintiff’s claim that they have put up on affidavit would be to reverse the test. While the position might be
different if the Court were driven to the conclusion that the defendants have established a complete defence to the plaintiff’s claims,
such that the plaintiff cannot really establish a fair issue to be tried, it is otherwise entirely inappropriate for the court to express any
view on the strengths of the parties’ respective cases.
35. Bearing those observations in mind, in light of the matters raised in argument it may be appropriate nevertheless to consider the
defences that the defendants have put up and upon which they appear to rely not only at the trial of the plaintiff’s action but also in
opposition to the present application.
i. breach of a ‘management work out agreement’
36. The first defence raised is that the defendant’s acceptance of the terms of the bank’s letters of the 1st December 2011, 29th
May and 16th November 2012 and their course of dealings with both the bank and NALM/NAMA amount to an accomplished and
binding agreement between those parties, which they describe as a ‘management work out agreement’ and which they contend has
been breached by the appointment of the plaintiff as receiver, rendering that appointment unlawful and, thus, invalid.
37. Confronted with the express terms of the letters quoted earlier, which, to use a neutral expression, appear to offer little support
for the interpretation that the defendants seek to place upon them, the defendants argue that their subsequent course of dealings
with the bank and NALM/NAMA establish the existence of the agreement for which they contend. In particular, they point to the work
and expenditure entailed in bringing the apartment complex into compliance with the fire regulations; fitting out the unsold apartments
for rental; managing the apartment complex; remitting the rent payments received to the bank; and selecting and appointing an
estate agent to handle the sale of those apartments, as comprising the consideration that they have provided in exchange for the
waiver by NALM/NAMA (and by PEL as its successor in title) of their entitlement to enforce their security.
38. In response, the plaintiff makes a number of points. First, he submits that the express terms of the said letters are directly
contrary to the agreement for which the defendants contend. Second, he argues that the consideration actually provided by
NALM/NAMA for the steps taken by the defendants, as guarantor and borrower in substantial default, was self-evidently the
forbearance of NALM/NAMA in refraining from taking immediate steps to realise its security. In avoiding receivership in 2011, the
defendants obtained an obvious benefit in that they retained the income from, and an equity of redemption in, the secured properties,
allowing them the opportunity to reduce their indebtedness. Third, the plaintiff submits that there is no basis in fact or logic for
asserting, much less concluding, that in taking the specific steps required of them under the express terms of the said letters, the
defendants were embarking on a course of dealing modifying those terms.
ii. breach of the defendants’ entitlement to fair procedures
39. The second defence raised is that the failure by the bank or NALM/NAMA to permit the defendants to be heard prior to the
assignment or sale of their loans to PEL was in breach of their right to natural and constitutional justice and fair procedures and that,
in consequence, the said assignment or sale was invalid, as was the subsequent appointment of the plaintiff as receiver by PEL.
40. In support of this argument, the defendants rely on the decision of this Court (per Finlay Geoghegan J.) in Treasury Holdings &
Ors. v. NAMA & Anor. [2012] IEHC 297, interpreting the principles governing the right of a borrower to be heard, as those principles
were described in various different ways by the Supreme Court in Dellway Investments & Ors v. NAMA & Ors [2011] 4 IR 1. In
considering the judgment of Fennelly J. in Dellway, Finlay Geoghegan J. concluded her analysis of the relevant principles in the
following terms:
“93. Whilst the other judgments put matters in a slightly different way, it does not appear to me that any of the other
judges disagreed with an entitlement to be heard where, at minimum, the decision would have “material practical effects
on the exercise and enjoyment of the rights of the applicants”. Certain of the judgments refer to “rights and interests” as
does the judgment of Fennelly J. rather than rights alone. I am doubtful that anything special turns on this, save that it
may imply a broad approach.”
41. The defendants say that the sale or transfer of the company’s loans by NALM/NAMA to PEL had material practical effects on the
exercise and enjoyment of the rights of the company, thus entitling the company to be heard.
42. In response, the plaintiff argues that particular regard must be had to the next paragraph in the judgment of Finlay Geoghegan J.
in Treasury Holdings which states:
“Even adopting this formulation, there is the additional question as to the nature of the rights and interests which may
satisfy this test. Rather than attempt to address this on a theoretical or abstract basis, it appears to me preferable to
consider the opposing submissions of the parties on the facts applicable to Treasury in the autumn of 2011. It is
commoncase that a person’s right to be heard is dependent on the specific facts applicable to that person. In Dellway,
Denham J. (as she then was) stated at para. 84:-
‘In light of the constitutional right to be heard, to fair procedures, the question is whether any such right to be
heard by the appellants arises implicitly in the Act of 2009 and in the circumstances of the case.’”
43. The plaintiff contends that a fundamental difference between the facts of both Dellway and Treasury Holdings and the facts of
this case, is that the latter involve neither a decision by NAMA to acquire any loan nor a decision by it to enforce its security on any
loan but rather a decision to sell the defendants’ loans to a third party (in this case PEL), which has acquired the benefit of those
loan agreements subject to the same terms and conditions as those which governed the original loan agreements between the
defendants and the bank. The plaintiff argues that, as PEL has none of the particular statutory powers and privileges conferred upon
NAMA under the National Asset Management Agency Act 2009, the sale or transfer of the said loans to PEL cannot have any material
practical effect on the exercise and enjoyment of the defendants’ rights or interests, since the sale merely restores the status quo
ante and does not adversely affect the existence or exercise of the defendants’ rights or interests in any way.
44. In this regard, the plaintiff points in particular to that portion of the judgment of Denham J. in Dellway (at para. 138) which
emphasises the fact that the remit of NAMA is quite different to that of a bank.
45. In addition, the plaintiff submits that there is a more fundamental difficulty with the defendants’ attempt to challenge the decision
made by NALM/NAMA to sell or transfer their loans to PEL. The plaintiff contends that any such application is hopelessly out of time
having regard to the provisions of s. 193 of the National Asset Management Agency Act 2009, not having been brought within one
month after the decision was notified to the defendants. The plaintiff argues that the time limit under s. 193 applies by analogy to
any application for declaratory relief in plenary proceedings, which could have been the subject of an application for judicial review,
on the authority of the decision of Costello J. in O’Donnell v. Dun Laoghaire Corporation [1991] ILRM 301 and, while acknowledging
that time may be extended where there are substantial reasons why the proceedings were not brought within time and where it is
just in all of the circumstances to do so, having regard to the interests of other affected persons and the public interest, further
argues that no such reasons have been advanced and that in this case the interests of third parties, including those of PEL with
whom the defendants purported to engage for over six months from September 2014 before raising this argument, would plainly be
adversely affected by any such decision to extend time now.
iii. An invalid demand
46. A third and, perhaps, subsidiary line of defence advanced by the defendants is that the appointment of the plaintiff as receiver
was not preceded by a valid letter of demand because it was a condition precedent to the issue of any such letter that there should
first have been an event of default, whereas no such event has occurred because, the defendants’ contend, the relevant loan has
become an interest only loan by course of dealing between the parties and the rent payments which the company was remitting to
PEL were meeting the interest on the loan at the material time.
47. The plaintiff argues in response that there is no evidence whatsoever to suggest, much less establish, that the loans at issue
were interest only beyond a bald averment by Mr McGinley to that effect, which is plainly entirely misconceived. It does seem fair to
pause here to observe that, in the course of argument, the proposition advanced on behalf of the defendants appeared to alter
slightly to become more obviously a reflection of the defendants’ contention that PEL was not entitled to demand repayment of the
relevant loans (or to appoint a receiver) unless and until there was some breach of the ‘management work out agreement’ contended
for by the defendants, which would of course depend on a finding that such an agreement exists.
48. The plaintiff makes a number of further points in reply. First, he points out that there is nothing in the relevant facility letter that
requires an event of default before demand – the monies owing were due to be repaid within one year of being drawn down or upon
demand. Second, he submits that clause 6 of the relevant indenture of mortgage made on the 28th September 2006 between the
company and the bank provides that the monies secured become due on demand and the bank’s power of sale is expressly stated to
be exercisable without the restrictions on its exercise imposed by s. 20 of the Conveyancing Act 1881. Third, he submits that rental
payments currently being remitted by the defendants are perhaps sufficient to meet the interest arising on the €12 million loan facility
advanced to the company but are certainly not sufficient to meet the interest arising on all four extant loan facilities, currently
amounting to €26 million. Finally, in so far as Mr McGinley complains on affidavit that the the repayment demand was not preceded or
accompanied by a statement of account, the plaintiff invokes the commentary at para 8.4 of Malek and Odgers (eds.), Paget’s Law of
Banking, 14th ed., (London, 2014) to the effect that a statement of the amount due is not a legal requirement for a valid demand.
iv. conclusion on defences raised
49. Reiterating my earlier observation that it is normally inappropriate for the court to express any view on the strengths of the
parties’ respective cases, beyond its conclusion on whether the applicant has established a fair bona fide question to be tried, in
addressing the foregoing arguments as they were presented to the Court by each side I propose to limit myself to the finding that
that the defendants have failed to satisfy me on the evidence so far presented that they have made out a complete defence to the
plaintiff’s claims, such that the plaintiff cannot meet the requirement to establish a fair issue to be tried on the validity of his
appointment as receiver and on his entitlement to exercise his functions as such.
The adequacy of damages
50. The plaintiff has averred to his willingness to provide the usual undertaking as to damages as a condition of the grant of the
injunctive relief that he seeks. No issue has been raised concerning his ability to make good on that undertaking should he be required
to do so.
51. On the other hand, a serious question has been raised concerning the defendants’ ability to compensate the plaintiff by an award
of damages for any loss suffered by him between now and the trial should the interlocutory injunctions he seeks be refused. The
plaintiff points to the defendants’ substantial indebtedness. In addition, there is an unsatisfied judgment against Mr McGinley that was
registered by the Collector General in the sum of €87,064.55 (with costs of €309.63) on the 14th December 2010 and an unsatisfied
judgment against the company that was registered in the sum of €5,332.65 (with costs of €947.30) on the 30th October 2012.
52. In response, Mr McGinley first asserts that the company does not accept that it owes as much as €26 million, without attempting
to clarify what sum it acknowledges it does owe on foot of the substantial borrowings it has obtained but not repaid. Mr McGinley
then avers that the company’s solvency is not in question because there has been no default in the repayment of the loans but, of
course, that is a circular argument since the plaintiff will only succeed at trial (and can only claim damages from the defendants for
any loss suffered) if he can establish the converse. Finally, Mr McGinley acknowledges the unsatisfied judgments against the company
and himself, but says that arrangements are now in train to discharge those debts.
53. In the circumstances and, in particular, by reference to the meagre evidence presented by the defendants of their current
financial status, I cannot be satisfied that the plaintiff will be adequately compensated by an award of damages for any loss he may
suffer between the present hearing and the trial of the action should the injunctions now sought be refused.
54. In relation to the position should the injunctions sought be granted and the plaintiff’s action subsequently fail, I am conscious that
the rights in dispute in these proceedings are property rights and that an entitlement to damages is often considered insufficient
protection where property rights may be lost. However, it is a particular feature of this case that the dispute between the parties
concerns which of them is to have control of the process of sale of the development properties at issue. I consider that a
fundamental distinction between this case and the situation posited by Clarke J. in A.I.B. plc v. Diamond [2012] 3 I.R. 549 at 590,
whereby a person might be deprived of his home subject only to an undertaking to compensate him to the value of that home (and
any consequential losses) should the relevant order subsequently be found to have been wrongly made, amounting to a form of
compulsory acquisition.
The balance of convenience
55. Both sides have raised several issues and have had much to say on the issue of the balance of convenience.
56. A significant controversy has arisen concerning whether the defendants, or any of their servants or agents, have been acting
aggressively towards existing tenants in seeking to prevent those tenants from remitting rent due to the plaintiff, as receiver, rather
than the company. The plaintiff avers to a telephone call that a member of his staff received on the 20th April 2015 from an unnamed
tenant alleging that Mr Flanagan made a telephone call to that tenant ‘of an aggressive nature’ in which he indicated that, if the
tenant’s rent was not received by the company by close of business on that date, all services to the apartment would be
disconnected and individuals on behalf of the company would call to seek vacant possession of the property.
57. The plaintiff further avers that, on the 30th April 2015, the same member of his staff received a telephone call from the mother of
another tenant who said that Mr Flanagan had texted her daughter and had called to the door of her daughter’s apartment. The
mother stated that her daughter would not open the door to Mr Flanagan but overheard him ‘threatening’ another tenant by telling
that person that if his or her rent was not paid to the company (rather than the receiver) services would be cut off. The tenant’s
mother stated that, in the circumstances, her daughter felt compelled to pay rent to the company.
58. The plaintiff was furnished with, and has exhibited in redacted form, a letter dated the 5th May 2015 and signed by each of the
tenants in that apartment, stating that rent is being paid “under duress, intimidation and threats to cut off services.” Remarkably,
that letter is countersigned (as a receipt) by Mr Flanagan on behalf of the company.
59. In response to these averments, Mr McGinley, his son Daniel, and Mr Flanagan have each denied on affidavit that they have
threatened or intimidated any of the tenants in the apartment complex. Mr McGinley asserts that it is the plaintiff who has caused the
tenant’s anxiety by corresponding with them to the effect that the rent due is payable to him as receiver. Mr Flanagan denies that he
threatened that services would be cut off if rent was not paid to the company, but acknowledges that he has had conversations with
a number of tenants in which he has explained that, if tenants do not continue to pay rents to the company, he ‘would have no
authority to attend to any maintenance issues which may arise.’
60. In relation to the receipt dated the 5th May 2015, Mr Flanagan admits that the letter is genuine and that he signed it, but avers
that he did so without reading it. Both Daniel McGinley and Mr Flanagan aver that their relations with tenants, including the tenants
concerned, remain cordial. Daniel McGinley avers to a conversation that he had subsequently with the tenant to whom the receipt
was provided, while ‘carrying out works’ to that tenant’s apartment, during which he avers the tenant concerned expressed shock at
the receiver’s behaviour in exhibiting that receipt for the purpose of these proceedings. However, no explanation has been
forthcoming as to why the tenants of any apartment would write such a letter if they did not feel intimidated or under duress.
Accordingly, and making due allowance for the hearsay nature of the evidence concerned, it must be a matter of some significance in
considering the balance of convenience in this case.
61. A number of other matters have been ventilated at some length on affidavit and in argument. For example, it is now common case
that one of the apartments in the building was occupied by Daniel McGinley and Mr Flanagan free of rent. The plaintiff says that this,
in conjunction with other matters, gives rise to a concern that rent is not properly being accounted for. The defendants say that the
apartment was being used, in effect, as an office for maintenance, administration and security purposes to the benefit of the
development as a whole. The parties are in dispute concerning which of them can more efficiently and cost-effectively manage the
properties. There is a dispute about whether a commercial unit at the complex was let by the company without the necessary
consent of the charge holder. There is some controversy concerning whether the VAT treatment of the rental income from the
property has been dealt with appropriately. It does not seem to me that any of these matters is especially germane to the central
issues that I must resolve.
62. A key factor, in my view, in considering the balance of convenience in this case is the extent to which the defendants’ opposition
to the injunctive relief sought is based not on the validity of the plaintiff’s appointment as receiver per se but, rather, on the asserted
incompatibility of that appointment with an alleged “management work out agreement” that the defendants claim to have entered into
previously with the bank and NALM/NAMA, and on the asserted invalidity of the transfer of the defendants’ loans from NALM/NAMA to
PEL. Yet neither NALM nor NAMA are parties to the present action, whereas they are each – together with PEL - defendants to the
separate action commenced by the defendants (as plaintiffs in that case) on the day after these proceedings issued, but in which
other action no injunctive relief has been sought, thereby depriving both NALM/NAMA and PEL of an opportunity to be directly heard
in opposition to the defendants’ claims in that regard.
63. It seems to me to follow that, in the particular circumstances of the present case, the central features of the status quo ante
are that the plaintiff was, and is, the subject of an appointment as receiver valid on its face, and that his appointment occurred
against the background of certain undisputed facts including: the company’s very substantial indebtedness; the significant
guarantees provided by Mr McGinley in that respect; the provision by the defendants of the relevant security as part of the
underlying loan transactions; the entitlement conferred under the relevant security instruments to appoint a receiver; and the failure
by the company to repay its debt upon demand and of Mr McGinley to honour his various guarantees when called upon to do so.
64. Taite v. Beades [2013] IEHC 440 was a case in which a receiver obtained a number of injunctions (certain of which were broadly
similar to those now sought) against a mortgagor in default in respect of certain residential investment properties. On behalf of the
defendants it is argued that the position in that case was different because the receiver there was in possession of the properties at
issue. On reading the judgment of McDermott J., it is by no means clear to me that that was so. But, even if it were, it does not
seem to me that the fact of physical possession or occupation can, or should be, dispositive in cases of this kind. To hold otherwise
would be, however inadvertently, to encourage undesirable action and confrontation of the kind that occurred in Taite (described at
paragraphs 24 and 25 of the judgment).
65. In considering the balance of convenience in Taite, McDermott J. emphasised the importance for both receivers and the tenants
that there should be clarity and stability in the definition and exercise of their respective rights (at paragraph 36 of the judgment).
That seems to me to be an important factor in considering the balance of convenience in this case also.
66. Contech Building Products Limited v. Walsh & Ors [2006] IEHC 45 was a case that involved an application for an injunction to
restrain passing off where the product complained of had already been placed on the market. The defendant argued that, since this
was the status quo at the time of the application, the preservation of that position required that the injunction application be
refused. Finlay Geoghegan J. rejected that submission, noting that whether an applicant becomes aware of alleged passing off before
or after the offending product is placed on the market is often a matter of happenstance. I pause here to note that the physical
possession or occupation of a development property (as opposed to, say, a family home) in receivership is also often a matter of
happenstance. Finlay Geoghegan J. identified the essential question in such cases as whether the applicant had moved promptly in
the face of the unlawful conduct alleged. Here, it cannot seriously be doubted that the plaintiff moved promptly once problems arose
shortly after his appointment as receiver.
67. In the circumstances described, I am firmly of the view that the balance of convenience favours the grant of the injunctions at
issue.
Conclusion
68. For the reasons set out above, I am satisfied that the plaintiff has met the relevant test under the Campus Oil guidelines. I will
therefore grant the interlocutory injunctions sought in terms of the notice of motion.