High Court awards damages for defective housing construction, systemic building regulation breaches, and negligent supervision across multiple properties.
Legislator-Zusammenfassung
KI-generiertThe High Court awarded substantial damages to three families for defective housing construction caused by poor workmanship and negligent supervision. Plaintiffs argued that the use of incorrect foundation fill rendered their properties uninhabitable, leading to significant repair costs and displacement. The court found the defects systemic and pervasive, confirming that the defendants were liable for breach of contract and tort.
Legislator-Regeste
KI-generiertBuilding Regulations 1997; Contract Law: Where construction work involves a complete departure from regulatory requirements and results in systemic defects, the contractor and supervising parties are liable for all consequential damages including repair costs, temporary accommodation, and distress.
Schlagwörter
KI-generiertZitierte Gesetzesbestimmungen
KI-generiertZitierte Rechtsprechung
KI-generiertVerwandte Entscheide
KI-generiertVolltext
Neutral Citation Number: [2014] IEHC 37
THE HIGH COURT
[2009 No. 4373 P]
BETWEEN
MICHAEL MITCHELL AND MARGOT MITCHELL
PLAINTIFFS
AND
MULVEY DEVELOPMENTS LIMITED, STEPHEN GARVEY PRACTISING UNDER THE STYLE AND TITLE OF ADEPT CONSULTING
ENGINEERS (AND BY ORDER THOMAS MULVEY, ROBERT MULVEY, DESIGN DEVELOPMENT LIMITED AND NATIONAL HOUSE
BUILDING GUARANTEE COMPANY LIMITED) (No.2)
DEFENDANTS
THE HIGH COURT
[2009 4370 P]
BETWEEN
MARY BRETT
PLAINTIFF
AND
MULVEY DEVELOPMENTS LIMITED, STEPHEN GARVEY PRACTISING UNDER THE STYLE AND TITLE OF ADEPT CONSULTING
ENGINEERS (AND BY ORDER THOMAS MULVEY, ROBERT MULVEY, DESIGN DEVELOPMENT LIMITED AND NATIONAL HOUSE
BUILDING GUARANTEE COMPANY LIMITED)
DEFENDANTS
THE HIGH COURT
[2009 No. 7559 P]
BETWEEN
CIARÁN ADAMS AND NIAMH DEASY
PLAINTIFFS
AND
MULVEY DEVELOPMENTS LIMITED, STEPHEN GARVEY PRACTISING UNDER THE STYLE AND TITLE OF ADEPT CONSULTING
ENGINEERS (AND BY ORDER THOMAS MULVEY, ROBERT MULVEY, DESIGN DEVELOPMENT LIMITED AND NATIONAL HOUSE
BUILDING GUARANTEE COMPANY LIMITED)
DEFENDANTS
JUDGMENT of Mr. Justice Hogan delivered on the 6th day of February, 2014
Part 1: Introduction
1. The development of a new housing complex at Strand Hill, County Sligo between 2004 and 2005 seems to have attracted much
attention at the time. There must have been many who considered that the purchase of such a house at this development would
represent an excellent choice as a family home. The properties were located about seven kilometres outside Sligo town and many of
them had balconies overlooking Sligo Bay with its stunning scenery. To the east lay the equally stunning vista presented by
Knocknarea mountain, while to the west lay the Ox mountains, Balisodare Bay and Culleennamore strand.
2. The plaintiffs in these proceedings all purchased these properties in this belief and expectation. As the details of this case will
chronicle, these expectations were all too quickly dashed. Instead, as the plaintiffs have found out to their cost and dismay, they
have been the victims of abysmal building practices and systemic and massive breaches of the relevant Building Regulations. This has
meant that the plaintiffs have been left with properties which, as matters stand, are unmarketable and, in some instances at least,
must be close to being uninhabitable.
3. The present action is as against the first defendant (Mulvey Development Ltd.), the second defendant (Stephen Garvey, practising
under the style and title of Adept Consulting Engineers), the third defendant (Thomas Mulvey) and the fifth defendant (Design
Development Services Ltd.). While an appearance was entered on behalf of Mr. Garvey on 30th May 2011, none of these other
defendants have filed an appearance. None of them have filed a defence. Judgment in default of appearance was entered against
Mulvey Developments Ltd. and Thomas Mulvey on 11th April 2011. A similar default judgment was marked against Design Development
Ltd. on 23rd May 2011. Judgment in default of defence against Mr. Garvey was given by me on 13th May 2013.
4. By decision of this court delivered on 11th March 2013, the action against the fourth defendant Robert Mulvey was dismissed,
since he was merely one of the vendors of the land on which the properties stand. The evidence established that he had no role in
the construction of the properties.
5. There remains the claim against the sixth defendant, National House Building Guarantee Company Ltd. (“Homebond”) whereby it is
sued pursuant to that guarantee which it gave under the Home Bond Agreement. Under that the terms of that agreement Homebond
agreed to repair defectively constructed private dwellings in the event that one its members defaulted on its obligation to effect such
repairs. Although the agreement contained an arbitration clause, in a reserved judgment delivered by me on 20th December 2012 I
held that Homebond was precluded by its own conduct from invoking that clause: see Mitchell v. Mulvey Developments Ltd. [2012]
IEHC 561.
6. While Homebond remain in the proceedings, it has been agreed that the actions against them will stand over pending the
determination of the claim against Mulvey Development, Mr. Thomas Mulvey, Mr. Garvey and Design Developments Ltd. Since, as we
have seen default judgments have been marked against all of these particular defendants, my task is simply to assess damages. I
should further record that some six other similar claims brought by other residents of the estate stand adjourned pending the outcome
of the assessment of damages in the present three sample cases.
7. To complete this picture it should be also recorded that Design Development Services Ltd. was placed into liquidation by its
members in September 2013 and a liquidator was then appointed. I have been further informed that an issue either has or may arise
with regard to the repudiation of the Mr. Garvey’s professional indemnity insurance by the insurer.
8. We can now proceed to consider the individual claims of the three separate sets of plaintiffs.
Part II: The claim of the Mitchells
9. Michael and Margo Mitchell bought a five bed room property at 8 The Waves, Strandhill in May 2005. Since then they have had to
contend with a multitude of defects which I can only endeavour inadequately to summarise in this judgment.
10. Within a month of moving into the property the Mitchells noted water staining in the ceiling in the playroom. The developers
promised to attend to this and it was decided that the balcony slabs should be removed and replaced with tiles. The object of this
was to prevent water getting into the patio doors on the balcony and down to the playroom below. These repairs were not
immediately attend to and yet worse was to befall them.
11. On a rainy Sunday afternoon in September, 2005 Ms. Mitchell was alerted by the cries of the children that it was raining in the
playroom. It transpired that water was streaming through the playroom ceiling and down through the downlights. This required the
emergency evacuation of the house and later that evening the plasterboard on the playroom ceiling collapsed. The ceiling was
repaired in December 2005 and the balcony was then tiled.
12. Yet the problems continued, apparently unabated. The tiling was replaced twice, but on another rainy Sunday in November 2006
the playroom ceiling collapsed again. The photographs of this event show masonry slabs on the floor.
The evidence of Mr. Michael Conmy
13. The Mitchells’ engineer, Mr. Michael Conmy, visited the premises shortly afterwards at a time when the builder had opened up the
block work for inspection. He prepared a report at this time which, among other things, recorded that no damp proof course had been
fitted over the door and that the windows of the opening and in other places was either undersized or fitted down too low. A section
of the cavity wall had no insulation fitted and in other places the insulation was plainly inadequate. In other places the tiling and the
lead flashing was inadequate or defective. Even though the house was little more than a year and one half old, yet by this stage the
structural beam supporting the back wall was deeply pitted with rust.
14. As if this were not enough, photographs taken at this time show inadequate balustrading; water ponding in the balcony and lack
of insulation on the pipes and water tank. There were also cracks in the footpath; plaster blotches on the brickwork; unfinished
paintwork; an unfinished garden fence and an undesirable (and potentially dangerous) protruding step in the garden patio.
15. Mr. Conmy followed up with a series of further reports. Following a further inspection on 4th April 2008, he stated:
“Responsibility for the legacy of disasters discovered to date rest firstly with the building contractor and his staff;
secondly with the sub-contractors and thirdly with the supervising engineers.
It is hard to understand how so many people on a building site allowed work to be carried out to such an appalling
standard. I can only conclude that quality of work was never a priority and that the sub-contractors adopted the
lowest standards possible on the site.”
16. These comments rather pithily sum up all that was wrong with these premises. Mr. Conmy added in evidence before me that he
had seen no evidence of any engineering input whatever in the construction process. Nevertheless, remarkable as it might seem, this
was not to be the end of the litany of travails which have been visited on this most unfortunate family. Mr. Conmy visited the
property again on 7th May, 2013, to assess the condition of the property. He did a short further report on 12th December, 2013, in
which he noted the following deterioration in the premises:-
“1. The continuous seepage of water has corroded the Universal Beam supporting the rear wall of the property.
2. The blockwork and plasterwork on the rear wall and the living area in the kitchen is damaged due to moisture
ingress.
3. Water is coming into the upstairs bedrooms through the chimneys.
4. Condensation is forming in the property due to the absence of the sliding patio door in the master bedroom. If
this level of deterioration and moisture ingress continues, the house will not be fit for habitation in 12-15 months.”
17. Mr. Conmy further confirmed that he had noticed in his latest inspection that the condition of the property had greatly
deteriorated since the previous visit. He thought that the reconstruction work would take about one year.
18. This catalogue of miseries has gravely impacted on family life over the last nine years or so. The balcony has had to be boarded
up and this has obviously been the subject of comment in the community. Traditional parties for the children – such as birthdays,
Christmas and Halloween – have been overshadowed by a playroom which is a poor state of repair. The master bedroom is so cold
that Ms. Mitchell was forced to don a ski cap to keep warm and in the last twelve months she abandoned the effort and moved out of
that bedroom.
The Evidence of David Hanney
19. The quantity surveyor, David Heaney, thought that the repairs would cost €202,090. He had also inspected the building and he
considered that there had been a “total failure” of the external envelope of the property. He noticed that the plaster was turning into
powder and that the rainwater was seeping through the blockwork, all of which would have to be drylined.
Calculation of the damages to be awarded to the Mitchells
20. In Leahy v. Rawson [2004] 3 I.R. 1 O’Sullivan J. allowed the sum of IR£5,000 per year in respect of general damages for “anxiety
and upset as a consequence of the negligence of the building contractor defendants.” This, of course, was an Irish pounds sum and it
further referred to events which took place over the late 1990s and early 2000s. While it is true that inflation has, on the whole, been
low since 2003 (the date of that judgment), I propose to allow each of the plaintiffs the sum of €10,000 per year as measured by
that benchmark. The extent of the inconvenience and distress in Leahy was admittedly considerable, but this case is, if anything,
probably worse. I will accordingly award the two plaintiffs €20,000 for each of the last nine years, i.e., a total sum of €180,000 for
anxiety, distress, upset and inconvenience as a result of negligence and breach of contract.
21. I will further allow the sum of €202,090 for repairs as per the estimate of Mr. Hanney, together with the €18,000 for repair works
paid for by the Mitchells which have proved fruitless. I will also allow the Mitchells the sum of €24,000 in respect of the costs and
inconvenience of moving out of the property for the one year necessary while repair works are performed. In sum, therefore, I will
make an award in the sum of €424,090 in favour of the Mitchells.
Part III: The claim of Ms. Brett
22. Ms. Brett purchased No. 3, The Waves, Ocean Links, Strandhill in 2003 and moved a year later. At the time Ms. Brett was working
on secondment in Italy and she lived at Strandhill only during holidays. She returned permanently to Ireland in 2009. Nevertheless
from an early period Ms. Brett realised that there were significant defects, but early endeavours to raise these issues with the
builders were summarily rebuffed.
23. In the first place Ms. Brett noticed cracking appearing in the outside front wall, running from the upstairs window to the
downstairs window. Soon, however, the cracks became pervasive and unsightly cracks could be seen in upstairs rooms and in the
sitting room walls. By 2006 Ms. Brett noticed that the sitting room floor was starting to slope. Plaster began to fall off the walls on a
regular basis.
24. Cracking began to get worse so that by 2009 it reached to the bathroom and the hall. More recently Ms. Brett has begun to
notice that the kitchen tiles have sounded hollow under foot, so that she fears that the parts of the kitchen floor may give way. All
of this has proved embarrassing when visitors arrive.
25. There were a myriad of other problems. There was no dividing wall in the attic. As this was a major safety issue, Ms. Brett
arranged with her neighbours to have such a wall constructed at a cost of €1,000.
26. The plumbing was also defective, as the hot water pipe had not been connected properly. The bedroom radiators would not heat
and a plumbing inspection revealed that the two radiators were connected with each other, rather than to the heating circuit.
27. Ms. Brett got married in July 2009. Unfortunately, her enjoyment of what should have been a very special and memorable day was
significantly compromised by a leak in the kitchen which manifested itself on that morning. She spent much of the wedding reception
with the nagging concern that the ceiling in the kitchen might collapse. The first days of her honeymoon were spent engaging with
plumbers by mobile telephone.
28. This leak (the costs of which was admittedly covered by insurance) was hugely disruptive. The soaked ceiling had to be opened
up in order to find the leak. It transpired that the fittings used to join the pipes were not the appropriate size for the pipes and it was
this which caused the leak.
29. During the course of these repairs some of the plaster fell onto the kitchen wall. On inspection one could see that it was not
simply the plaster which was cracked, but the internal brickwork was also cracked, something which was also confirmed by the
engineering evidence. Not surprisingly, the house was cold and was always vulnerable to draughts. It was very difficult to heat. So
far from giving the owner joy and pleasure, the property has been the source of endless worry and misery.
Evidence of Patrick Barrett
30. Ms. Brett’s engineer, Mr. Barrett, gave evidence in terms of his earlier report of October 2009. He confirmed what had been said in
that report, namely, that a trial hole had revealed that the house had been constructed “on loose sandy type material” which on
inspection was found not be compacted. It is this which has led to subsidence and cracking. Further inspections of an opening in the
gable wall revealed an inadequate damp proof course over the brickwork. A bonding agent suitable only for internal use had been used
for the external plaster finish. Not surprisingly, this material was not weather resistant: it expanded and exploded, pushing the plaster
off the walls, allowing rainwater to penetrate to the blockwork. Thermal imaging revealed the absence of insulation in places such as
the attic, water tank and pipeworks.
31. It is only fair to record, however, that tests carried out in July 2013 showed that the cracking had been arrested and the
settlement of the foundations has stopped. Yet this should give us but little comfort, as Mr. Barrett put the matter starkly by saying
in conclusion that he was “shocked” that any professional person could give the appropriate certificates in relation to either the
building work or the finish of the house. His inspections had revealed wholescale violations of the Building Regulations.
Evidence of Mr. Damien Hanney
32. Mr. Hanney, the quantity surveyor, estimated the repairs work would cost €120,175 and that they would be about 4 months in
duration. He thought that the house showed poor workmanship “from start to finish” and that the property was unmarketable as it
presently stands.
The award of damages to Ms. Brett
33. Given that Ms. Brett was only in partial occupation of the property in the period between 2004 and 2009 and her stays in the
property were limited in duration, I will allow her the sum of €20,000 for this period for upset, annoyance, anxiety and loss of
expectation. I will allow herself and her husband the figure of €100,000 for the subsequent five year period in respect of distress,
anxiety, upset and disappointment.
34. I will further allow her the sum of €120,175 for future repairs and €5,000 for past repairs. Finally, I will allow the sum of €5,000 for
rent and inconvenience associated with the four month period while the property is under repair.
35. I will accordingly award Ms. Brett the sum of €250,175.
Part IV: The claim of Mr. Adams and Ms. Deasy
36. The claim of Mr. Adams and Ms. Deasy discloses another case of unrelieved misery and woe.
The Evidence of Ciarán Adams
37. Mr. Adams gave evidence that he and his wife, Niamh Deasy, are both nurses who returned to Ireland in 2002 in order to get
married. They both obtained permanent employment in 2003 and settled in Sligo. They purchased their property – which is a four bed
detached property – for €352,000.00. Not surprisingly, they chose this property for its stunning views over Sligo Bay and the
surrounding mountains.
38. Mr. Adams and Ms. Deasy moved into the property with their young daughter, Clodagh, in mid 2005. They quickly became
concerned that there were underlying defects in the property because the house was cold and very difficult to heat. Fuel bills were
very high and then, to their alarm, they found cracks opening in the kitchen wall. These cracks extended the entire length of the
major supporting walls of the kitchen and, worse again, the cracks were manifest both inside the dwelling and also outside.
39. Similar cracks opened up in the bedroom above the kitchen again, both internally and externally. There then followed a long litany
of other defects: they found cracked wall tiles cracked, the granite worktop in the kitchen shifted, the kitchen cupboard doors began
to come loose and the kitchen windows jammed as if due to downward pressure and became unsuitable for ventilation. Wind came in
through the cracks and when driving rain came from the west - a not uncommon occurrence in Sligo - it came through these cracks
and flowed inside the kitchen walls. The oak kitchen units have accordingly been severely damaged by water ingress.
40. As if this was not enough, there were a myriad of other problems which this judgment can only briefly and all too inadequately
summarise. There was an intermittent odour from the sewage system and there was water ingress causing large internal damp
patches and peeling of paint. Plaster has frequently either just fallen on to the floor or peeled away. The balustrading on the stairs
and landing was loose and defective. The seals on all the windows and doors were inadequate and will need to be replaced.
41. It proved almost financially prohibitive to run the central heating system and the bedrooms were extremely cold. The radiators
were not installed with thermostats and the water pressure was relatively weak. The water tank and the pipes were not lagged and
the attic insulation was inadequate. The engineering evidence was that the ceiling over the kitchen and the dining room is very
possibly not insulated at all. The engineering team recommended that this ceiling needs to be taken down in order to allow proper
insulation to be supplied.
42. As it happened, the development was still under construction when Mr. Adams and Ms. Deasy moved into their own property.
They regularly approached the developers who were then working on other houses in the immediate vicinity in an effort to have these
problems addressed. The developers made attempts on numerous occasions to seal draughts with a silicone gun. They also attempted
minor plasterwork and damp proof course repair which did not work. The external walls were repainted but this simply camouflaged the
cracks which were to open up and reappear at a later stage. The toilet near the kitchen was repositioned in a failed attempt to stop
the sewage odour.
43. In the end, Mr. Adams was forced to use duct tape to seal cracks in the walls and the draughts between the windows.
Depending, therefore, on the weather and the seasonal conditions, the Adams family have had to deal with draughts, rainwater
ingress, mould, odours, leaks and insect infestation.
The evidence of Ms. Deasy
44. Ms. Deasy gave evidence along similar lines. She chronicled the frustrations and challenges which living in this property posed.
She candidly described the many conversations which she and her husband have had concerning the property. Not surprisingly, these
conversations have led to mutual recrimination and upset. All of this is understandable, even if, of course, objectively, neither of them
are to blame for the predicament in which they find themselves.
45. Ms. Deasy also recounted a personal incident which touched her deeply. Her sister, Therese, died in 2011 as a result of multiple
sclerosis. Ms. Deasy had hoped that her sister could have stayed with her at Strandhill, but this proved impossible because the entry
to the bathroom was narrower than the minimum standards required for such access by the Building Regulations.
The evidence of Mr. O’Connell, Structural Engineer
46. Mr. Cathal O’Connell, a consulting engineer attached to CST Group Consulting Engineers, gave evidence based on detailed reports
compiled in March 2009 and January 2010 following several site visits. He had also revisited the property again on 10th July 2013.
47. When, then, was the major source of the problems confronted by the Adams family? Mr. O’Connell explained that the problems
with the property were so pervasive that it was deemed necessary to inspect the foundations by means of trial holes.
48. Two trial holes were opened by the engineering team. One proved unexceptionable. The other trial hole was opened under the
retaining wall beside the kitchen and dining room and the sun room where the cracking was most evident. This trial hole told an
altogether different story. The engineers observed voids under the strip foundations at this point and they also found that the
foundation was constructed on loose clay fill material which was quite unsuited for the building’s foundations. Some of this clay fill
appears to have been mixed with builders’ rubble, as timber, plastic sheeting, paint cans and even (according to Ms. Deasy) a
wheelbarrow were found in this mix.
49. While Mr. O’Connell considered that further excavations are necessary – not least to explain the curious fact that the concrete
footpath running parallel with the gable wall has settled and is now sloping away from the house – he estimated that some 40% of the
foundations have inappropriate fill material of this kind. Mr. O’Connell concluded his second report by stating:
“We believe that the cracking to the kitchen gable and rear wall has occurred due to foundation movement as a
result of the house being partially constructed on clay fill. Significant remedial works will have to be carried out to
the existing structure to rectify the problem. The masonry boundary retaining wall adjacent to the gable of the
dwelling is under-designed and will need to be strengthened.
Fine and hairline cracks observed in walls and ceiling throughout the building in areas away from the affected area
do not appear to be structurally significant and appear to be normal shrinkage cracks.
The property is not in full compliance with the Building Regulations (current at the time of construction) [with]
regard to disabled access, heat conservation (insulation) and ventilation. Other defects such as damp ingress, poor
plumbing and drainage are listed in the body of the report and are generally as a result of poor workmanship and
poor building practice.”
50. All of this speaks for itself, but in oral evidence Mr. O’Connell described as “awful” the quality of workmanship in relation to the
foundations. He considered that the engineers should have inspected the foundations and that this evidently did not happen. He
further expressed the view that while the property was still salvageable, nevertheless unless major remedial works were performed
there was a real risk that the property would become uninhabitable over the next year or so.
The Evidence of David Heaney, Quantity Surveyor
51. Mr. Heaney gave evidence that he had never seen anything like the dilapidation which he had encountered in this particular
property. It was plain that the wrong type of foundation fill had been used. He estimated the bill of quantities for the repair of the
property at €247,805.
52. He estimated that the repair works would take up to five months, as new foundations would have to replace and supplement the
existing foundations.
Calculation of the Damages to be awarded to Mr. Adams and Ms. Deasy
53. In line with the other awards, I propose to award these plaintiffs in total €20,000 per year for total sum for anxiety, distress,
upset and inconvenience as a result of negligence and breach of contract. This sum comes to €160,000. I will allow a figure of
€12,000 for the cost of renting alternative accommodation for a five to six month period in which the family were required to move
out of the dwelling while repair works are being carried out. Finally, I will allow a sum of €5,000 for the repairs which the family have
been forced to pay for, the expenditure for which has been wasted.
54. I will accordingly award Mr. Adams and Ms. Deasy the sum of €424,805.
Part V: Conclusions
55. From the legal perspective the claims against the relevant defendants in both tort and contract are absolutely straightforward.
The defects chronicled in this judgment are systemic and all pervasive throughout all three properties. The evidence of poor
workmanship and defective supervision of the construction work is overwhelming and one cannot avoid observing that there appears
to have been a very complete departure from the requirements of the Building Regulations.
56. I have endeavoured – all too belatedly and perhaps, I fear, inadequately - to compensate these plaintiffs for the manifold wrongs
that they have been obliged to endure over the last eight to nine years, although it is as yet unclear as to whether these awards are
actually enforceable in practice. What happened to these three families was simply unconscionable. Even though the judicial task has
now come to an end, yet it would be altogether remiss of me not to express the hope that the appalling plight of the three families as
revealed in this judgment may yet prove to be a clarion call for action in relation to the proper enforcement of building standards.
57. Mindful of the fact that what I described in Hussein v. Labour Court [2012] IEHC 264, [2012] 2 I.R. 704, 714 as “a healthy
dialogue” between the various branches of government can only serve the public interest, it seems to me appropriate that the two
other branches of government should be made expressly aware of the contents of a decision which may call for important policy
review, not least in such vital matters as the quality of construction work and the effective operation of the Building Regulations. It is
in this vein that I propose to transmit a copy of this decision to the Minister for the Environment, Community and Local Government
and to the Chairman of the Oireachtas Committee on the Environment, Culture and the Gaeltacht so that the Oireachtas and, if needs
be, the Government, may give such consideration to the policy issues raised by the judgment as they may consider appropriate.