High Court quashes s.25 certificate and agreement as ultra vires due to executive bias and lack of authority.
Legislator-Zusammenfassung
KI-generiertThe High Court granted leave to amend the applicants' grounds to include certiorari against a purported agreement between the respondent and the notice party. The court found that while pre-application discussions were necessary for the Act's effective working, the executives lacked authority to commit the Board to a specific recommendation or enter into an agreement that would benefit the respondent if a certificate were granted. Consequently, the court quashed the s.25 certificate and declared the agreement ultra vires to avoid apprehension of bias.
Legislator-Regeste
KI-generierts. 25(7) of the Dublin Docklands Development Authority Act 1997; A statutory body cannot enter into an agreement in advance of determining an application under s. 25, nor can its executives commit the Board to a specific recommendation, as such actions render the subsequent decision invalid by reason of reasonable apprehension of bias.
Schlagwörter
KI-generiertZitierte Gesetzesbestimmungen
KI-generiertVerwandte Entscheide
KI-generiertVolltext
Neutral Citation Number: [2008] IEHC 305
THE HIGH COURT
JUDICIAL REVIEW
COMMERCIAL
2007 No. 1527 J.R.
[2007 No. 188 COM]
BETWEEN
NORTH WALL QUAY PROPERTY HOLDING COMPANY LTD.
AND SEAN DUNNE
APPLICANTS
AND
DUBLIN DOCKLANDS DEVELOPMENT AUTHORITY
RESPONDENT
AND
NORTH QUAY INVESTMENTS LTD.
NOTICE PARTY
Judgment of Ms. Justice Finlay Geoghegan delivered on the 9th day of October, 2008
Preliminary
1. The applicants are each stated to have contractual rights in a property at North Wall Quay, Dublin, adjacent to the lands of the
notice party, which are the subject matter of a certificate issued by the respondent pursuant to s. 25 of the Dublin Docklands
Development Authority Act 1997, in respect of a proposed development on part of a site bound by North Wall Quay, New Wapping
Street, Mayor Street and Castleforbes Street, Dublin 1. The certificate is dated 13th July, 2007, and bears the reference “DD457” and
was issued to the notice party.
2. The respondent is a statutory body established by the Dublin Docklands Development Authority Act 1997 (“the Act of 1997”). The
notice party is the beneficiary of certificate DD457 and the owner of a large site on part of which the development referred to in
certificate DD457 is to take place. The notice party’s site surrounds on three sides the applicants’ site.
3. By order of the High Court of 19th November, 2007, (Peart J.) the applicants were granted leave to apply by way of an application
for judicial review for inter alia an order of certiorari of the certificate DD457 and related declarations and other relief.
4. By order of the High Court (Kelly J.) of 10th December, 2007, the proceedings were admitted to the commercial list pursuant to
O.63A, r. 4, of the Rules of the Superior Courts.
5. By further order of the High Court of 21st December, 2008, (Kelly J.) the applicants were granted leave to amend the statement of
grounds so as to include an application for an order of certiorari quashing a purported agreement dated 31st May, 2007 (“the
Agreement”) between the notice party and the respondent, and to include additional grounds, both in relation to the application for
certiorari of the certificate DD457 and the Agreement.
6. The respondent and notice party have each delivered amended statements of opposition. Affidavits have been filed on behalf of all
parties and written legal submissions.
7. In the course of the hearing, there was limited cross-examination of one of the respondent’s witnesses and two further affidavits
were filed in Court on behalf of the respondent, clarifying certain confusion which had arisen as to precisely what documents were
before the Board of the respondent when the decision to grant certificate DD457 was made.
Grounds
8. At the commencement of the proceedings, the major concerns of the applicants appears to have been a perceived failure of the
development, the subject matter of certificate DD457, to provide for an east-west route between New Wapping Street and
Castleforbes Street, and the potential adverse effect of that failure and the provision in the development for an “industrial-scale
basement access ramp”, both of which were alleged to potentially adversely affect the amenity of a residential development proposed
by the applicants and which is the subject matter of a certificate DD188, dated 7th August, 2003, issued by the respondent. Prior to
the hearing, the respondent applied for, and was granted, a certificate DD525 dated 10th April, 2008, for a development consisting of
a relocation of the basement access ramp in the development the subject matter of certificate DD457, by 17m. to the north, and
associated works. As a consequence of this, at the hearing the applicants did not pursue the grounds relating to the basement ramp
and the east-west route became of less significance.
9. At the hearing the applicants pursued their claim for an order of certiorari of certificate DD457 on the ground that it was ultra
vires the respondent on one or more of the following grounds:
(i) The decision to grant certificate DD457 was taken in breach of the applicants’ rights to fair procedures and, in
particular, the opportunity to make submissions/observations on the application of the notice party for the certificate.
(ii) The proposed development is not consistent with the Docklands North Lotts Planning Scheme (“the Planning
Scheme”). In particular;
(a) The proposed development fails to meet the minimum mix of residential and commercial use prescribed by
paragraph 4.1 of the Planning Scheme; and
(b) the height of the buildings of the proposed development is not consistent with the requirements of section 5 of
the Planning Scheme.
(iii) Section 25 of the Act of 1997 (as amended) does not permit the respondent to impose conditions for the purpose of
making an otherwise inconsistent proposed development consistent with the Planning Scheme as was done in certificate
DD457.
(iv) The decision of 13th July, 2007, to issue certificate DD457, was made in breach of the rule against apparent bias by
reason of the existence of the Agreement of 31st May, 2007, and its terms and/or the respondent took into account an
irrelevant consideration i.e. the Agreement in reaching its said decision.
10. The applicants also pursued a claim for an order of certiorari of the Agreement of 31st May, 2007, on the grounds that it was
ultra vires for the respondent to enter into the said Agreement.
11. All the parties, correctly in my view, emphasized, in support of their submissions, the very special, and in some respects unusual,
mix of functions imposed on the respondent by the Act of 1997. It is necessary to set out the statutory scheme in some detail to
consider the applicants’ claims herein, and the opposition thereto of the respondent and notice party. Whilst there was much common
case between the respondent and notice party, their positions on all issues are not identical.
Statutory framework
12. The Act of 1997, in its long title, states that it is “an Act to make provision for the renewal of the Dublin Docklands area and for
that purpose to establish a body to be known as the Dublin Docklands Development Authority, and to define its functions. . .” Section
14 (1) establishes the respondent “to perform the functions assigned to it by or under this Act”.
13. Section 14 (2)(a) sets out the composition of the Authority:
“The Authority shall consist of a Chairperson appointed in accordance with section 15, a Council appointed in accordance
with section 16 and an Executive Board appointed in accordance with section 17.”
Section 14 (3) states:
“The Authority shall be a body corporate with perpetual succession and a seal and power to sue and be sued in its
corporate name and to acquire, hold and dispose of land.”
14. Section 18 sets out the function of the respondent, as distinct from each of its identified organs which are subsequently dealt
with in sections 19, 20 and 21. Section 18 provides:
“(1)(a) It shall be the general duty of the Authority to secure-
(i) the social and economic regeneration of the Dublin Docklands Area, on a sustainable basis,
(ii) improvements in the physical environment of the Dublin Docklands Area, and
(iii) the continued development in the Custom House Docks Area of services of, for, in support of, or
ancillary to, the financial sector of the economy.
(b) For the purposes of paragraph (a) and without prejudice to the generality of that paragraph, the Authority shall
have the following functions in relation to the Dublin Docklands Area-
(i) to prepare a master plan for the regeneration of that Area in accordance with section 24, and to
promote the implementation of the master plan;
(ii) to prepare, where appropriate, planning schemes in accordance with section 25;
(iii) to prepare detailed proposals and plans for the development, redevelopment, renewal or
conservation of land in that Area;
(iv) to acquire, hold and manage land in that Area for its development, redevelopment, renewal or
conservation either by the Authority or by any other person;
(v) to develop, redevelop, renew or conserve, or secure the development, redevelopment, renewal or
conservation of, any land in that Area or otherwise to secure the best use of any such land;
(vi) to dispose of land-
(I) on completion of its development, redevelopment, renewal or conservation under this Act,
(II) to secure its development, redevelopment or conservation, or
(III) to secure its best use;
(vii) to provide such infrastructure and to carry out such works of amenity development or
environmental improvement as, in the opinion of the Authority, may be required to encourage people to
work, shop or reside in that Area or otherwise to use the facilities provided in that Area;
(viii) to promote the co-ordination of investment by statutory bodies and of investment by statutory
bodies with private investment in that Area;
(ix) to promote the co-ordination of the programmes and other activities of statutory bodies and other
persons concerned with the regeneration of that Area and to promote co-operation between such
bodies and persons;
(x) to promote, in particular as regards persons residing in that Area, the provision of education and
training opportunities, and the development of a wide range of employment in that Area;
(xi) to promote the development of existing and new residential communities in that Area, including the
development of a mix of housing for people of different social backgrounds.
(c) Paragraph (b) shall not be construed as prejudicing the generality of section 14(3) insofar as it applies to the
acquisition, holding and disposal of land.
(2) Without prejudice to the generality of subsection (1) or to any provision of this Act, apart from this section, the
Authority may carry on any activity which appears to it be requisite, advantageous or incidental to, or which appears to it
to facilitate, the performance by it of any of its functions under this Act.
(3)(a) The Authority may make such changes as it considers appropriate in consideration of the performance by it of its
functions, the provision by it of services and the carrying on by it of activities.
(b) The Authority may recover, as a simple contract debt in any court of competent jurisdiction, from the person by
whom it is payable any amount due and owing to it under paragraph (a).
(4)(a) In making a draft master plan available under section 24 (4) it shall be a function of the Authority to make the plan
available electronically in a form that is compatible with the World Wide Web or like form, and in such other form as the
Authority considers appropriate.
(b) Following the laying of accounts under section 43 or reports under section 44, it shall be a function of the
Authority to make such reports and accounts available electronically in a form that is compatible with the World
Wide Web or like form, and in such other form as the Authority considers appropriate.
(5) In addition to the functions assigned to it by subsection (1), the Authority shall have such other functions related to
securing the regeneration of the Dublin Docklands Area as for the time being stand assigned to it by the Minister by order
made after consultation with the appropriate Minister.
(6) The Authority may do all such things as arise out of or are consequential on or are necessary or expedient for the
purposes of the functions assigned to it by or under this Act, or for the purposes incidental to those purposes.”
15. It is to be noted that the functions expressly assigned by sub-section (2) include the preparation of a Master Plan in accordance
with s. 24 and Planning Schemes in accordance with s. 25, but there is no express reference to the issuing of the certificates the
subject matter of this dispute.
16. The functions of the Council are set out in s. 20 and its primary functions are those set out in sub-sections (1)(a) and (b), and in
addition to make recommendations to the Executive Board on certain matters set out in sub-section (c). Section 20 (1)(a) and (b)
provide:
“(1) For the purposes of section 18, the Council shall-
(a)(i) in accordance with section 24, arrange for the preparation of, and adopt, a master plan for the Dublin
Docklands Area, and review and update the plan at least once in every five years,
(ii) monitor the implementation of the plan;
(b) where appropriate, submit to the Minister, in accordance with section 25, a planning scheme or schemes for the
Custom House Docks Area, or any part thereof, and any other area specified for that purpose by order under
section 25(1)(a).”
17. The Executive Board is the organ of the respondent to whom the general power to conduct the business of the respondent is
assigned by section 21 of the Act. This provides:
“(1) (a) Subject to section 20, the Executive Board shall conduct the business of the Authority and perform all of the
functions assigned to the Authority by or under this Act.
(b) In addition to the functions referred to in paragraph (a), the Executive Board shall arrange for the provision of
such services to the Council as may be required for the effective performance by the Council of the functions
assigned to it by or under this Act.
(2) In performing its functions, the Executive Board shall have regard to the recommendations made to it by the Council
under section 20.”
18. As appears from the above, the Scheme envisages the preparation and adoption by the respondent itself of a “Master Plan” for
the Dublin Docklands Area, in accordance with section 24 of the Act. No issue arises in the proceedings in relation to the Master Plan
for the Dublin Docklands Area. It is sufficient to note that it is clear from the terms of s. 24 of the Act, which is lengthy and detailed,
that the Master Plan is intended as a written statement and plan, indicating overall objectives for the social and economic
regeneration of the Dublin Docklands Area on a sustainable basis, with improvements in the physical environment and the continued
development in the Customs House Docks area of services for the financial sector of the economy. Section 24 (2)(b) sets out certain
provisions which must be in a Master Plan, and sub-section (3) requires the respondent inter alia to make arrangements for
consultation with interested persons in relation to a Master Plan. The respondent is required to publish notices in relation to the
existence of a Draft Master Plan, and consider submissions and observations made in response thereto. The effect of the adoption of
a Master Plan under s. 24 on the general statutory scheme for planning and development, is set out at section 24 (5):
“(a) As soon as may be after the adoption by the Authority of a master plan under this section, Dublin Corporation shall
consider the making of-
(i) a development plan under section 19(5)(b) of the Act of 1963 for that part of their area included in the Dublin
Docklands Area which would be consistent with the master plan, or
(ii) such variations of the development plan for the County Borough of Dublin made under section 19 of the Act of
1963 as may be desirable to secure consistency between that plan and the master plan.
(b) Dublin Corporation and An Bord Pleanála shall, in deciding any application, or in determining any application on appeal,
as the case may be, for permission under Part IV of the Act of 1963 in respect of development in the Dublin Docklands
Area, consider the relevant provisions of the master plan.”
19. Section 25 sets out the statutory scheme for the preparation of a Planning Scheme and its consequences for the general
statutory framework for planning and development. This section has been amended by s. 22 of the Housing (Miscellaneous Provisions)
Act 2002, by the addition of sub-section (7)(ii)(c) and a new sub-section (8). Section 25 as amended provides:
“(1)(a) The Authority may prepare a scheme (to be known and in this Act referred to as a “planning scheme”) for the
Custom House Docks Area, or any part thereof, and any other area specified for that purpose by order of the Minister.
(b) The Authority may at any time prepare a planning scheme amending a planning scheme under this section,
including a planning scheme continued in force by virtue of section 9 (1) in respect of-
(i) the entire area to which the planning scheme applies, or any part thereof, or
(ii) the full requirements as to content specified in subsection (2), or any part thereof.
(c) A planning scheme under this section shall not include any development which is of a class for the time being
specified under Article 24 of the European Communities (Environmental Impact Assessment) Regulations, 1989 (S.I.
No. 349 of 1989), or under any provision amending or replacing the said Article 24, other than industrial-estate
development projects, urban development projects and sea water marinas as specified in classes 10(a), 10 (b) and
10(j) of Part II of the First Schedule to those regulations or such development as specified in any provision
amending or replacing those classes.
(2) A planning scheme under this section shall consist of a written statement and a plan indicating the manner in which
the Authority considers that the area to which the planning scheme applies should be redeveloped and in particular-
(a) the nature and extent of the proposed development,
(b) the proposed distribution and location of uses,
(c) proposals in relation to the overall design of the proposed development, including the maximum heights and the
external finishes of structures,
(d) proposals relating to transportation, including the roads layout, the provision of parking places and traffic
management, and
(e) proposals relating to the development of amenities and the conservation of the architectural heritage or other
features.
(3) In preparing a planning scheme under this section the Authority shall-
(a) comply with any general directive that may be given to it under section 45,
(b) have regard to the master plan under section 24,
(c) consult with Dublin Corporation and with such statutory bodies as appear to the Authority to have an interest in
the area to which the planning scheme relates,
(d) have regard to the development plan made by Dublin Corporation,
(e) make arrangements for the making of submissions by interested persons in relation to the planning scheme and
the consideration by the Authority of any such submissions.
(4) A planning scheme under this section shall be submitted by the Authority to the Minister for approval and a copy
thereof shall be sent to Dublin Corporation at the same time.
(5) Where a planning scheme under this section is submitted to the Minister by the Authority, the Minister shall consult
with the Minister for Finance and shall consider any objections that may within one month of the sending of the copy to
Dublin Corporation be made to the planning scheme by the said Corporation and may modify the planning scheme in such
manner and to such extent as the Minister thinks proper and may approve the planning scheme or the planning scheme as
so modified.
(6) Notice of approval by the Minister of a planning scheme under this section shall be published in the Iris Oifigiúil and in
at least one daily newspaper published in the State.
(7) (a) Subject to paragraph (b) and (c), each of the following shall be exempted development for the purposes of the
Act of 1963-
(i) in an area in respect of which a planning scheme has been prepared and approved under this
section, the carrying out by the Authority of any development in the area which is consistent with that
planning scheme;
(ii) in an area in respect of which a planning scheme has been prepared and approved under this
section, the carrying out of any development in the area by a person other than the Authority which is
certified by the Authority to be consistent with that planning scheme; provided that a certificate under
this paragraph may contain such conditions in relation to the carrying out of the development as the
Authority considers appropriate.
(b) Where a planning scheme prepared and approved under this section is amended under subsection (1)(b), any
certificate previously issued under paragraph (a)(ii) in respect of the area which is the subject of the amending
planning scheme during the period between the date on which the initial planning scheme was approved and the
date on which the amending planning scheme was approved shall, as and from the date on which the amending
planning scheme is approved, cease to be valid unless the development to which the certificate relates has been
substantially commenced.
(c) For the avoidance of doubt, a certificate issued under paragraph (a)(ii) may include the following:
(i) in the case of a development wholly or partly for the provision of housing, a condition requiring that
a percentage, not being more than 20 per cent, specified in the certificate, of houses being provided for
in the development to which the certificate relates shall be provided for social or affordable housing;
(ii) a condition requiring the payment of a contribution towards any expenditure that has been, is being,
or is intended to be incurred, by or on behalf of-
(I) Dublin City Council, in respect of the provision of public infrastructure and facilities that benefit
or facilitate development in the area to which the planning scheme concerned relates;
(II) the Authority, in respect of the provision of public infrastructure and facilities in accordance
with its functions under section 18 or to give effect to the master plan or the planning scheme
concerned;
(iii) a condition relating to any matter which the Authority considers is in furtherance of the master plan
or a planning scheme.
(8) In this section-
‘house’ includes any building or part of a building used or suitable for use as a dwelling and any outoffice, yard, garden or
other land appurtenant to or usually enjoyed with that building or part of a building, and, where appropriate, includes a
building which was designed for use as 2 or more dwellings or a flat, an apartment or other dwelling within such a building,
and ‘housing’ shall be read accordingly;
‘the provision of public infrastructure and facilities’ means-
(a) the acquisition of land,
(b) the provision of open spaces, recreational and community facilities and amenities and landscaping works,
(c) the provision of roads, places for the parking of vehicles, bridges, sewers, waste water and water treatment
facilities, drains and watermains,
(d) the provision of bus corridors and bus lanes, bus interchange facilities (including car parks for those facilities),
rail and light rail transport and any other infrastructure to facilitate public transport,
(e) the provision of cycle and pedestrian facilities and traffic calming measures,
(f) the refurbishment, upgrading, enlargement or replacement of roads, places for the parking of vehicles, bridges,
sewers, waste water and water treatment facilities, drains or watermains, and
(g) any matters ancillary to paragraphs (a) to (f).”
20. The functions of the respondent in relation to a Planning Scheme differ in some important respects from that of the Master Plan.
There is a similar consultation procedure provided for in sub-section (3), but then, in accordance with sub-sections (4) and (5), the
Scheme must be submitted by the respondent to the Minister and Dublin Corporation, for approval by the Minister. The Minister is
given the power to modify the Scheme following consultation with the Minister for Finance, and receipt of any objections from Dublin
Corporation. The final approval of the Planning Scheme, with or without modifications, is a matter for the Minister.
21. The potential impact of a Planning Scheme on the general statutory framework for planning and development is, as submitted by
the parties, radical and extensive. Sub-section (7) makes certain types of development “exempted development” for the purpose of
the general Planning Acts. First, if the authority itself carries out any development which is consistent with the Planning Scheme,
such development is exempted development.
22. Central to these proceedings is the type of development identified in sub-section (7)(a)(ii), i.e. development in the area by a
person other than the authority which is certified by the Authority to be consistent with the Planning Scheme.
23. Notwithstanding what counsel for the respondent described as this “extraordinary benefit” for a developer, namely, the possibility
of carrying out a development without the necessity of going through the normal statutory scheme, seeking planning permission with
all the application requirements, the potential for objections from members of the public, and appeal to An Bord Pleanála, it is
surprising and regrettable that the Act of 1997 is silent as to how the respondent should exercise the function implicit from the
provisions of s. 25(7) (ii), to issue certificates to persons that the development which they propose to carry out, is consistent with
the relevant Planning scheme. The absence of any specific provisions as to how this function should be exercised is all the more
surprising, having regard to the express entitlement of the respondent to include conditions in a certificate, as authorised by section
25 (7)(a)(ii) and (c).
24. The only other provisions of the Act relevant to the issues in dispute to which the Court’s attention was drawn, are the power
given to the respondent in s. 27 of the Act, to acquire compulsorily land situate in the Dublin Docklands Area for the purpose of
performing any of its functions, and that in s. 42, to accept gifts of money, land or other property, with a limitation that it should not
accept a gift if the trusts or conditions attached would be inconsistent with or prejudice the effective performance of its functions.
25. Finally, counsel drew attention to what is a common provision in the definition section that “functions” include powers and duties.
The Docklands North Lotts Planning Scheme
26. The Dublin Docklands Area Master Plan was adopted in 1997. A review of the Master Plan 1997, was subsequently undertaken and
in 2003, the Master Plan 2003, adopted.
27. In 2002, the Minister for the Environment and Local Government, pursuant to s. 25 (5) of the Act, adopted the planning scheme
for the North Lotts Area, subject to certain modifications which are identified. The respondent made an amended Planning Scheme in
or about December 2005, which was approved by the Minister on 26th June, 2006. The amended Scheme was exhibited in the
grounding affidavits but not referred to or relied upon by any of the parties as being relevant to any of the issues in dispute herein.
Insofar as I refer and cite below extracts from the Planning Scheme, it is the Planning Scheme as approved in 2002.
28. The developments proposed by the applicant and notice party, are on lands in Zone 4 of the area the subject of the Planning
Scheme. The entire area measures some 32.7 hectares and includes the area bounded by the Campshires on North Wall Quay, East
Wall Road, Sheriff Street Upper/Lower and Guild Street, and extends to the centre line of the River Liffey. Zone 4 is described as
being in multiple ownership. The format of the Planning Scheme follows closely the requirements of s. 25(2), and of particular
importance to the issues in dispute herein, sets out as required by s. 25(2)(b) and (c), the proposed distribution and location of uses
in Chapter 4 and Chapter 5, provisions in relation to the overall design, including maximum heights and external finishes of structures.
It also includes, in Chapter 5, provisions in relation to internal routes and public spaces.
29. The Planning Scheme, at para. 4.1, under the Introduction to the section on “Distribution and Location of Uses”, states:
“In general, an even mix of development will be required in the Area. However, it will be desirable to allow for the
concentration of some uses in certain locations to provide places with distinctive character.
The overall mix of development for the Area will be consistent with the Master Plan objective to assign 60% of
developable land area for residential use and 40% for commercial use. The residential category includes community,
cultural, hotels and local shopping for the purposes of this ratio. There is a prior assumption that this ratio will be met on
all sites above 0.2 hectares (0.5 acres). Variations on the ratio may be considered subject to an absolute minimum of
40% residential and 30% commercial with 30% variable where a development:
• contributes to the enhancement of the Area through the provision of public open space; or
• provides social and affordable housing in excess of the Authority’s minimum requirement; or
• provides other elements which can be clearly demonstrated to advance the social economic and physical policies
of the Master Plan and where significant falling demand for either particular use can be independently demonstrated.
Small sites, i.e. those below 0.2 hectares (0.5 acres), may be exclusively devoted to a single use, provided the use at
ground floor enlivens the street.”
30. These provisions as to the mix of uses are, in substance, repeated as a policy which the respondent will ensure, at paragraph
4.12 of the Planning Scheme.
31. The proposals in relation to new routes and spaces is set out at para. 5.2.1 in the following terms:
“The Planning Scheme proposes a series of internal routes and public places (some of which may be shared surface
between vehicles and pedestrians) as shown in Diagram 13. The objective is to create a strong east-west series of
informal routes and spaces. These routes can be pedestrian or vehicular to suit internal access and design. Those
intended for vehicular traffic will be designed to the lowest order of traffic speeds. These routes and spaces are not
prescriptive in location. Developments will however be expected to adopt the objectives implied in the layout. A key
principle is to include in each major block a local open space which could be used as a play area.”
Insofar as relevant to certificate DD457, Diagram 13 shows an east-west staggered link between Castleforbes Road and New Wapping
Street, with an open space immediately north of a portion of that route.
32. Paragraph 5.3.2 of the Planning Scheme, sets out under a heading of “Building heights and setbacks”, the following:
“In order to provide a strong sense of street continuity, specific building heights have been identified for the main or
primary streets identified in Diagram 10. Diagram 16 illustrates these building heights and allows for special provision for
landmark buildings. It is generally anticipated that development will take the form indicated in Diagram 16, save
contiguous to protected structures shown to be retained along North Wall Quay, where heights of new development may
have to be scaled back to respect the setting of those structures (see Section 6.9). The Authority will seek appropriate
building heights along the internal route network in the area indicated in that diagram. Design solutions will be considered
that do not compromise the urban design quality of the Area or existing residential amenities. Building heights will be
required to be such that satisfactory standards for sunlighting and daylighting are achieved and residential amenities are
protected. However, the Authority also reserves the right to limit building heights on further internal routes to three
storeys plus a possible set back storey. Building heights will not in any case exceed the maximum stated for the adjacent
main or primary streets. (Modification No. 6).”
33. Diagram 16, insofar as relevant to these proceedings, colours in purple, North Wall Quay, in orange, New Wapping Street, and in
green, what are referred to as “indicative internal routes”. The legend under the diagram, under a heading of “Maximum building
heights”, indicates in relation the streets coloured purple:
7 storeys commercial or 8 storeys residential
(all plus 1 possible set-back storey)
(Modification No. 4)
In relation to those coloured orange:
5 storeys commercial
(plus 1 possible set-back storey) or
6 storeys residential
(plus 2 possible set-back storeys)
In relation to those coloured green:
4 storeys (plus 1 possible set-back storey)
34. At para. 5.5 under the heading of “Policies”, it is stated:
“The following urban design principles, mainly derived from Chapters 5 and 6 of the Planning Scheme, shall be regarded as
being of fundamental importance in the consideration of any development proposals submitted for Section 25 certification:
. . . (b) Maximum heights of buildings shall be as set out in Diagram 16 (except as amended by these modifications).”
35. This is again repeated in the full list of policies on p. 54 at the end of Chapter 5, where it is stated that:
“The Authority will: . . . Require building heights not to exceed the maximum heights shown on Diagram 16. It should be
noted that the heights are expressed as main parapet heights. The Authority will consider architectural features standing
above the main height limitation provided they contribute to the architectural design quality of the building.”
36. While submissions were also directed to those parts of the Planning Scheme which related to plot ratios, it appears to me
unnecessary by reason of the conclusions I have reached, to consider those submissions and therefore I do not propose complicating
the judgment with reference to the plot ratios.
Respondent’s certificate procedure
37. The respondent, through its executives, its CEO, Mr. Moloney; its Director of Architecture, Mr. McLaughlin; its Senior Planner, Mr.
Keaney; and its Secretary, Mr. Mulcahy, have, in their affidavits, explained fully and frankly to the Court both its general procedure in
relation to the determination for applications of certificates under s. 25 of the Act, and the procedure followed in the application
which resulted in certificate DD457.
38. The respondent publishes on its website an application form which must be completed, with the documentation referred to
therein, and states in the explanatory note:
“The section 25 application process is similar to a standard planning application, although there is no statutory third party
involvement, with no requirement for a public notice or planning fee. There are no first or third party rights of appeal.
The public may view any section 25 certificate and accompanying application documentation.”
It provides specific directions as to the form of maps, drawings, etc., which should accompany the form and gives certain directions,
particularly in relation to applications for residential development and consultations with Dublin City Council’s Waterworks and Drainage
Division, none of which are relevant.
39. The respondent does not publish any public notice of the receipt of an application for a section 25 certificate. It is unclear as to
when the applicants’ documentation was available for public viewing in accordance with the above statement.
40. It is the practice of the executives of the respondent to have what they call “pre-section 25 application discussions” with
developers. Such discussions took place with the notice party in November 2006. Mr. Mulcahy states at para. 23 of his first affidavit
that, “the said discussions were with a view to establishing whether or not the Executive believed that the proposed development
shown on plans and drawings prepared by the Developer’s architect could be consistent with the Planning Scheme”.
41. It is important to note the distinction between the “Executive Board” which is one of the organs of the respondent designated in
s. 14(2)(a) of the Act of 1997, and those persons who, in the affidavits and even the Agreement of 31st May, 2007, are referred to
as “the Executive”. The latter are the employees of the respondent, none of whom are members of the Executive Board. The
Executive Board are persons who in normal commercial terms would be considered as non-executive directors. For clarity in this
judgment, I will simply refer to the Executive Board as the Board and use the term “the Executive” to designate collectively the senior
employees of the respondent. The Executive, as so described, is not, of course, a legal person, and has no express recognition in the
Act of 1997. It appears to have been adopted as the collective name for the senior full-time officials of the respondent.
42. I do not think that the Court was told of the attitude then formed by the Executive. However, Mr. Mulcahy does state that at the
same time of the pre-application discussions, the notice party submitted an application to Dublin City Council for planning permission,
which was subsequently refused. There has been exhibited and produced to the Court, a letter dated 24th January, 2006, written by
Mr. Kearney on behalf of the respondent, to the Planning and Development Department of Dublin City Council, in relation to that
application. The conclusion of that letter is that in the opinion of the respondent, the proposed development is “not consistent with
the Planning Scheme and not interest (sic) of the proper planning and sustainable development of the area”. One of the specific
matters referred to in the letter was the proposed height of the buildings, and Mr. Kearney expressed the view that as a result “it is
considered that the proposed development is inconsistent with the requirements of the Planning Scheme”. Reference is also made to
plot ratio, streetscape and open space.
43. The application for a s. 25 certificate was lodged on 11th May, 2007. The application appears to have been initially assessed by
Mr. McLaughlin, Director of Architecture. He states, at para. 9 of his first affidavit:
“As part of the pre section 25 application, discussions referred to in the Affidavit of Neil Mulcahy at paragraphs 22 to 24, I
assessed the Developer’s proposed development and in addition reviewed the plans and drawings which had been
submitted on 11 May 2007 as part of the application. I formed the opinion from my preliminary examination that the
development could be consistent with the Planning Scheme and was a development in respect of which the Executive
should be prepared to recommend to the Board ought to be granted a Section 25 Certificate.”
44. The next step appears, from Mr. Mulcahy’s affidavit, to have been the culmination of pre-application discussions in the agreement
made between the notice party and, as stated by the deponents, the “Executive of the Authority”. That agreement, which only was
disclosed to the applicants subsequent to the commencement of proceedings, is an agreement which is expressed to be between the
notice party and the respondent, and is executed under hand only being signed on their respective behalves by Mr. Carroll and Mr.
Mulcahy. The detail of the agreement will be referred to when I come to consider the grounds of challenge based on same.
45. The Board of the Authority met on 11th June, 2007, and noted the agreement entered into. Mr. Mulcahy’s paper to the Board,
informing them of same, was produced and states:
“North Wall Quay Development - Acquisition of Land for Amenity Purposes
1. Summary
The Board is asked to note that the Executive have entered into a contract with North Quay
Investments Limited (a development vehicle owned by Liam Carroll) which has agreed to give, free of
charge, to the Authority land adjoining Mayor Street to be used by the Authority as an amenity space
subject to certain terms and conditions.
2. Background
Mr. Liam Carroll is the owner of a considerable area land in North Lotts (formally the Brooks Thomas
Site) part of which fronts onto North Wall Quay. Mr. Carroll recently reached agreement with Anglo-Irish
Banks and O’Donnell-Sweeny solicitors, for the construction by him of a major office development
fronting onto North Wall Quay, and backing onto Mayor Street, which would accommodate both of
these firms in corporate headquarters.
The development proposed was inconsistent with the Authorities (sic) Planning Scheme and he sought
planning permission from Dublin City Council which was refused. Subject to providing amenity space for
Docklands North Lotts, the Director of Architecture is satisfied that a development compatible with the
planning scheme and satisfactory to Mr. Carroll and his tenants can be agreed. The transfer of the land
for amenity would be essential to any such arrangement.”
46. Mr. Kearney, the senior planner, prepared a planning report, which is dated 4th July, 2007. Some considerable confusion arose in
the course of the proceedings in relation to various versions of Mr. Kearney’s report. I wish to make clear that nothing turns on this
for the issues which I have to determine. Mr. Kearney’s practice appears to have been, when he prepared his planning report, to
discuss it with Mr. McLaughlin, who is his superior, and to make changes pursuant to those discussions, but yet retain the same date
on his report. Further, Mr. Kearney then both attended the Planning Sub-Committee of the Board and made further notes, and after
the Board meeting of 13th June, 2007, at which the decision, in principle was made, he held further discussions, in particular in
relation to one of the conditions which he proposed (which is not relevant to these proceedings) and again made further changes,
whilst all the time retaining the initial date on the planning report. This appears an undesirable and inappropriate way of recording
changes to a planning report. There is nothing wrong in Mr. Kearney incorporating changes to his report as a result of discussions or
meetings. However, for good order, it appears to me that where a person, such as Mr. Kearney, revises a report by reason of
discussions, then he should clearly indicate that the subsequent version is a revised report and date it as of the date the revisions
occur.
47. The supplemental affidavits of Mr. Mulcahy and Mr. Kearney filed in the course of the proceedings, ultimately identified the version
of Mr. Kearney’s report which was put before the Board of the respondent as that exhibited at Exhibit 2NM1, to Mr. Mulcahy’s affidavit
filed in the course of the hearing. The report assesses the application and recommends that a certificate be issued subject to
conditions. Twenty-two proposed conditions are set out.
48. The Planning Sub-Committee considered the application on 13th July, 2007, and subsequently on the same day a decision was
taken by the Board of the respondent. The extract of the minutes from the meeting of the Board of the respondent records at
paragraph 6.1 the following decision:
“DD457 - Proposed development of three office buildings on a site bounded by North Wall Quay, New Wapping
Street and Mayor Street in Castleforbes Road - North Quay Investments Limited
Having received the recommendation of the Planning Sub-Committee and having considered the report of the Senior
Planner dated the 4th of July 2007 (DD457) for the construction of three office buildings on a site bounded by North
Wall Quay, New Wapping Street and Mayor Street and having examined the plans and elevations, the Board directed
that a Certificate under Section 25 should issue to the applicant, subject to the conditions listed in Appendix 1
hereof.”
Appendix 1 set out twenty-two conditions. There are some variations in those conditions to those set out in the version of Mr.
Kearney’s report which was before the Board. It is unclear when the terms of Appendix 1 as recorded in the minute were established.
However, nothing turns on this, having regard to grounds upon which leave was granted herein.
49. The decision of the Board of 13th July, 2007, is characterised by the respondent’s deponents as being a “decision in principle” to
issue the certificate. They explain that an issue arose concerning condition 20 (J) in the planner’s report, relating to a contribution
towards a new foul and surface water drainage and collector sewer. It is stated that the Board of the respondent delegated to Mr.
Maloney, the CEO, to investigate the nature of this requirement and to determine whether to include this financial levy as a condition.
This is offered as the explanation for which the certificate did not issue until 29th August, 2007. In the meantime, meetings were held
between Mr. Kearney and the CEO and the final set of conditions established. The applicants make much complaint in their affidavits
that they were told no decision had been made in this period, but again, nothing turns on this. Mr. Mulcahy, in his affidavit, confirms
that the certificate was sealed on behalf of the respondent. However, this could not have occurred on 13th July, 2007, as the
certificate purports to state. Again, whilst this is not good practice, nothing turns on it for the purpose of these proceedings.
50. The certificate DD457 issued on 29th August, 2007, and dated 13th July, 2007, records the application on 11th May, 2007, for a
certificate under s. 25 of the Act of 1997, for development being “the proposed development consisting of 3 no. office buildings -
Blocks 1,2 and 3:-
Block 1: The building will be eight storeys in height over ground level and will consist of 2 no. 8 storey finger blocks linked
across a full height glazed central atrium space. Plant areas housed at roof level will be set back and screened. A roof
terrace will be provided at the eighth floor level of the east finger block. A retail bank and staff canteen will be located at
ground floor level. The gross floor area of Block 1 will be 23,739 sq.m.
Block2: The building will be eight storeys in height over ground level. Plant will be set back and screened at roof level. A
café and staff canteen will be located at ground floor. The gross floor area of Block 2 will be 9,785 sq.m.
Block 3: Block 3 will consist of an eight-storey block with stepped terraces and a penthouse gym/break out facility at roof
level set back from the front and rear building lines. The roof level accommodation will also screen roof plant. A café and
public exhibition space will be located at ground floor level. The gross floor area of Block 3 will be 17,704 sq.m.
All three buildings will be located above a shared two level basement car park that will accommodate 338 car spaces.
Access to the car park will be from two separate locations; New Wapping Street via a new east-west street and directly
from Castleforbes Road. The proposed development will also provide for the creation of a new east-west street that will
link the New Wapping Street with Castleforbes Road and 3 new north south routes that will link North Wall Quay with the
new east-west street. [Situated at Site Bounded by North Wall Quay, New Wapping Street, Mayor Street and
Castleforbes Road, Dublin 1.]
51. The certificate then states:
“The Dublin Docklands Development Authority having considered the said application hereby certify that subject to the
compliance with the attached [22] conditions the carrying out of the said development to be consistent with the Planning
Scheme prepared and approved under Section 25 of the Dublin Docklands Development Authority Act, 1997, the said
development is accordingly exempted development for the purposes of the Planning and Development Act.”
52. The conditions relevant to the disputes are primarily those set out at 2, 14 and 22, which are:-
“2. The development relates to Phase 1 of the site consisting of buildings 1, 2 and 3. The development of Phase 2 of the
site shall be the subject of a separate Section 25 application. The provision and distribution of 40% residential use and
60% commercial uses shall be consistent with the terms of the Planning Scheme over the entire landholding (i.e. Phase 1
and Phase 2)
14. The following amendments shall be made to the development:
(i) The western elevation of Building 1 which addresses New Wapping Street shall be redesigned in order to provide
for a suitable architectural treatment which deals with the interface of the ground floor of this building and the
public street.
(ii) In order to comply with the North Lotts Planning Scheme the top storey of Building 2 shall be redesigned as a
setback floor.
(iii) Building 3 shall be redesigned in order to ensure compliance with the North Lotts Planning Scheme requirement in
terms of height and the architectural quality of the elevations. This shall include for an increase in the separation
distances between Building 2 and Building 3, and Building 3 and the eastern boundary of the site in order to improve
the pedestrian environment.
Full details shall be submitted to the Board of the Authority as a reserved matter for written agreement prior to the
commencement of development.
22. The strip of land located on the northern quadrant of the site (indicate in yellow on the attached map) shall be ceded
to the Authority by deed of transfer to the Authority within 4 weeks of the date of issue of this Section 25 Certificate.”
Nature of S. 25 certificate decision
53. The resolution of the disputes between the applicants and the respondent and notice party in relation, in particular, to the vires
of the decision of the respondent to grant the s. 25 certificate of consistency with the Planning Scheme to the respondent, depend,
at least in part, upon an identification of the nature and statutory purpose of the decision taken by the respondent. This is made
difficult by the absence of any express provision in the Act of 1997 (as amended), expressly conferring the function of taking such a
decision on the respondent, or to the procedure to be followed in taking such a decision.
54. All parties made extensive reference in submissions to what they perceive to be analogies and differences between the role and
function or purpose of the respondent in taking such a decision, and a number of different decisions which may be taken by a planning
authority under the Planning and development Acts, and judicial decisions relating to those powers. Whilst helpful, they are not
determinative. I have concluded that the nature of the function being exercised by the respondent in taking this decision, does not,
unfortunately, fall neatly into any of the types of decisions which are taken by planning authorities under the Planning and
Development Acts.
55. It is common case that the decision at issue is a decision which the respondent, by implication, has power to take, and one which
must be taken by the Board by reason of the general assignment to the Board by section 21(1)(a). It appears to me important to
note that the function of issuing a certificate of consistency with a planning scheme for the purposes of s. 25(7)(a)(ii) was not
considered by the Oireachtas to be a function which should expressly be assigned to the respondent in s. 18(1)(b) for the purpose of
the development duties assigned to the respondent under section 18(1)(a). The absence of any reference to the granting of
certificates of consistency in s. 18(1)(b) appears to underline that this is an adjudicative function which is distinct from the general
development functions of the respondent.
56. In relation to the procedure required, the respondent and notice party laid emphasis on the adjudicative nature of the decision
making function and relied by analogy on the similar function now given a planning authority by s. 5 of the Planning and Development
Act 2000, to determine a question as to what, in any particular case, is or is not exempted development within the meaning of the
Act of 2000. I accept that there are similarities, but there also appear to me to be significant distinctions. Exempted development, for
the purpose of the Planning and Development Acts, is defined either in the Act of 2000, or by regulations made by the Minister. Where
a planning authority is required to determine what in any particular case is or is not exempted development, its function is confined to
making a declaration on that question. Whilst the respondent, under the Act of 1997, has to determine whether or not the carrying
out of a proposed development, is consistent with the relevant planning scheme, it is also given by reason of s. 25(7)(a)(ii) and (c) a
power to include in the certificate conditions in relation to the carrying out of the development. The decision, therefore, goes beyond
what is required of a planning authority in determining an application for a declaration under section 5 of the Act of 2000.
57. Further, the North Lotts Planning Scheme is not in all its provisions certain and prescriptive. This also distinguishes it from what
does or does not constitute exempted development for the purposes of the Planning and Development Acts. Some of its provisions are
prescriptive such as the maximum building heights set out at para. 5.3.2 and referred to above. However, it will be noted that, for
example, the provisions already cited in the judgment at para. 5.2.1 of the Planning Scheme, in relation to the network of new routes
and spaces, are not prescriptive, either as to the nature or location of the routes. It is expressly stated, “these routes can be
pedestrian or vehicular to suit internal access and design”. It also states, “these routes and spaces are not prescriptive in location”.
Similarly, even the provisions relating to building heights, whilst prescriptive as to the maximum height, the wording of para. 5.3.2
makes clear that lower heights may be required by the Authority in certain factual circumstances. For example, it states, “building
heights will be required to be such that satisfactory standards for sunlighting and daylighting can be achieved and residential
amenities are protected. However, the Authority also reserves the right to limit building heights on further internal routes to three
storeys . . .”
Fair procedures
58. The first issue in dispute is whether the respondent was obliged to have in place in relation to its procedures for determining the
application for a s. 25 certificate, an opportunity for the applicant, as an adjoining landowner to whom a certificate had already been
granted for a development, to make submissions and have those submissions considered prior to making its decision.
59. The respondent and notice party oppose that obligation, primarily in relation to the nature of the statutory scheme and, in
particular, the express provisions in ss. 24 and 25(3)(e) requiring the respondent to give interested parties an opportunity of making
submissions and having those considered, both in relation to the Master Plan, and a planning scheme. They also drew, by analogy, on
the procedure followed by planning authorities on applications for declarations under s. 5 of the Act of 2000 which they submit does
not include publication of the application or the right of third parties to make submissions. The applicants in their submissions relied
upon the interconnection of the certificate DD188 already granted to them, and, in particular, the requirement in that certificate in
relation to the imposition by condition 5 or, the requirement that the applicant construct a road and footpath in the area allocated to
future road space to the north of its site to Dublin County Council’s “taking in charge” standards, and the requirement that same be
transferred free of charge to the Authority, or the Roads Authority, at a date to be agreed with any proposal in the notice party’s
development for the remainder of that proposed east-west route between New Wapping Street and Castleforbes Road. They also
referred in more general terms to the potential impact on the residential development the subject matter of certificate DD188 by the
proposed commercial development the subject matter of certificate DD457.
60. It is common case that, in accordance with well established judicial principles in relation to the construction of functions
conferred by statue, that the implied decision making process of the respondent must be discharged in accordance with the principles
of constitutional justice. This requires that the decision be taken in accordance with fair procedures which would appear to require
that persons who have property rights that could be affected by the decisions taken be given an opportunity of making submissions
and have those submissions considered For the following reasons.
61. Section 25(7)(a)(ii) evidences a clear intention by the Oireachtas that there be a “fast track” procedure for the carrying out of
development which is consistent with a planning scheme approved under s. 25 by the Minister, without the necessity of being
subjected to the planning application procedures under the Planning and Development Acts. However, it is an exception to the general
planning statutory scheme where the public including adjoining landowners have significant rights to participate. Also the provisions of
ss. 24 and 25(3)(e) make clear the proper concern of the Oireachtas that interested parties be given an opportunity of both making
submissions and having those submissions considered in relation to the Master Plan and a proposed planning scheme. It is not in
dispute that the applicants are interested parties, having contractual rights to properties in the area of the North Lotts Planning
Scheme and, subsequently, as a person to whom a certificate has been granted. If the only decision which had to be taken by the
respondent was a decision as to whether or not the proposed development is or is not consistent with the Planning Scheme, and if
the Planning Scheme was prescriptive in all important matters, then it appears to me that the respondent’s submissions, that the right
to make submissions prior to approval by the Minister of the Planning Scheme is sufficient discharge of their right to fair procedures,
might well be correct. However it is not.
62. I have concluded that having regard to the implied power given to the respondent to impose conditions as to how a development
should be carried out, and the fact that certain important matters such as the nature and location of new routes for pedestrian
and/or vehicular access are not prescriptive in the North Lotts Planning Scheme, that the taking by the respondent the decision on an
application for the s. 25 certificate at issue in these proceedings, without affording an adjacent landowner whose property will be
affected by the decision the opportunity of making submissions and in considering same, is in breach of that person’s rights to fair
procedures. It does not appear to me that the express rights given in ss. 24 and 25(3)(e) to make submissions on draft Master Plan
and planning schemes should be construed as implying any intention by the Oireachtas that the applicant, as an adjacent landowner,
should not be given an opportunity to make submissions on an application for a s. 25 certificate for which no procedure is prescribed.
On the contrary, those sections indicate an intention by the Oireachtas that interested parties be entitled to participate in this
statutory scheme. As the North Lotts Planning Scheme is not fully prescriptive and the respondent has a wide discretion to impose
conditions in relation to the carrying out of the development, it appears to me envisageable that an application for a s.25 certificate
and a potential decision with conditions, could raise matters of concern to an adjacent landowner which might not have been
addressed in submissions on the draft planning scheme. Accordingly, I have concluded that the decision taken by the respondent on
13th June, 2007, was in breach of the applicants’ rights to fair procedures.
63. I think I should make clear that the procedure which the respondent requires to have in place is not necessarily identical to that
under the Planning Acts, but at least a procedure whereby interested persons such as landowners in the relevant area of the Planning
Scheme, can ascertain that an application for a s. 25 certificate has been made, such as from a public register maintained by the
respondent, and is then given a short period of time in which to make submissions. Such submissions would also have to be made
available to the applicant for the certificate with a right of reply again within a short period.
Standard of review
64. Prior to considering the contention of the applicants that the proposed development of the notice party is not consistent with the
North Lotts Planning Scheme, it is necessary to consider the standard according to which the Court should review the decision of the
respondent that the development is consistent with the North Lotts Planning Scheme.
65. The applicants submit that the North Lotts Planning Scheme is the blueprint for the development in the North Lotts Area. This is
not in dispute. Further, that it is, in its nature, similar to a development plan under the Planning and Development Acts, albeit far
more detailed in its terms than a normal development plan. They submit that it follows from this that the North Lotts Planning Scheme
should be regarded as an “environmental contract” similar to a development plan, as described by McCarthy J. in Attorney General
(McGarry) v. Sligo County Council [1991] 1 I.R. 99 at p.113, where he stated:
“The plan is a statement of objectives; it informs the community, in its draft form, of the intended objectives and affords
the community the opportunity of inspection, criticism, and, if thought proper, objection. When adopted it forms an
environmental contract between the planning authority, the Council, and the community, embodying a promise by the
Council that it will regulate private development in a manner consistent with the objectives stated in the pan and, further,
that the Council itself shall not effect any development which contravenes the plan materially. The private citizen,
refused permission for development on such grounds based on such objectives, may console himself that it will be the
same for others during the currency of the plan, and that the Council will not shirk from enforcing these objectives on
itself.”
They also submit that it follows that the construction of the Planning Scheme is a matter of law which should be determined by the
courts in accordance with the decision of Barr J. in Tennyson v. Corporation of Dun Laoghaire [1991] 2 I.R. 527, and that the Court
should not defer to the respondents, in accordance with the principles in O’Keeffe v. An Bord Pleanála [1993] 1 I.R. 39.
66. The respondent and notice party submit that review by the Court of the decision on consistency with the Planning Scheme is
limited to the type of review permitted by O’Keeffe v. An Bord Pleanála [1993] 1 I.R. 39, and the notice party, in particular, also
submits that the proper analogy is not the development plan, but rather a planning permission and that, in accordance with the
decision of the Supreme Court in Grianán an Aileach Centre v. Donegal County Council (No. 2) [2004] 2 I.R. 625, the Court has no
jurisdiction to construe the North Lotts Planning Scheme and it is a matter for the respondent.
67. Having considered each of the decisions referred to above, I have concluded that, in substance, the submissions of the applicants
appear correct. Whilst I think there are distinctions between a development plan and a planning scheme drawn up under s. 25 of the
Act of 1997, it appears to me that a planning scheme is much closer to a development plan than to a planning permission. The
Planning Scheme is drawn up by the respondent after public consultation, but then not ultimately determined by the respondent. It is
determined by the Minister, with or without modification, following a further consultation procedure. It is, therefore, not the
respondent’s document, as would be a planning permission.
68. It also appears to me to have some of the hallmarks of the type of environmental contract referred to by McCarthy J. in the
Attorney General (McGarry) v. Sligo County Council [1991] 1 I.R. 99. It is in the nature of a contract between the respondent and if
not the public at large, at least the property owners within the area to which the planning scheme applies. Those property owners are
entitled to rely on the fact that any development undertaken by the respondent in that area, without applying for planning
permission, will be consistent with the Planning Scheme, and that the respondent will only grant a certificate to any other person
pursuant to s. 25 if such development is consistent with the Planning Scheme. Each property owner is entitled to rely on the fact
that any other property owner within the area will be only able to carry out development in accordance with this fast track method if
it is consistent with the Planning Scheme.
69. Further, it appears to me that there is a close analogy between the decision impliedly entrusted to the respondent by the
Oireachtas, having regard to the terms of s. 25, sub-section 7, and a determination by a planning authority that a grant of planning
permission is not a material contravention of a development plan. This latter decision and the distinction of the appropriate nature of
the review by the Courts of planning decisions which are a matter of planning judgment were described by Barr J. in Tennyson v.
Corporation of Dun Laoghaire 1991] 2 I.R. 527 at p.534 where he stated:
“Where a decision is made by a planning authority on an application made to it by a developer under s. 26 of the Act of
1963 for permission to proceed with a proposed development, it may be open to challenge on two broad grounds. First, on
purely planning criteria (as, for example, a contention that the decision of the authority to exclude certain units from a
proposed development was erroneous in that it was unnecessary and did not accord with good planning practice) and,
secondly, that the decision is ultra vires the powers of the planning authority. The latter category of dispute includes
issues relating to the meaning of the development plan relating to the particular application. The Oireachtas has provided
in the planning code a forum for the adjudication of appeals from decisions of planning authorities within the first category
i.e., those relating to planning matters per se. Such appeals are heard and determined by An Bord Pleanála which is a
tribunal having the benefit of special expertise in that area. The court is not an appropriate body to adjudicate on such
matters and in my view it ought not to interfere in disputes relating to purely planning matters. However, where the
dispute raises an issue regarding a matter of law such as the interpretation of the wording of a development plan in the
light of relevant statutory provisions and the primary objective of the document, then these are matters over which the
court has exclusive jurisdiction. An Bord Pleanála has no authority to resolve disputes on matters of law.”
70. Similarly, it appears to me that a decision by the respondent to grant a s. 25 certificate that the carrying out of a development is
consistent with the North Lotts Planning Scheme, and to impose conditions in relation to the carrying out of the development, may be
challenged on the basis either that it is ultra vires the powers of the respondent as, on the proper meaning of the Planning Scheme,
the proposed development is not consistent with the Scheme or the conditions imposed are ultra vires or that the conditions while
ultra vires are unreasonable in the legal sense. This latter matter, having regard, for example, to the terms of s. 25(7)(c)(iii), appears
to be a matter which the Oireachtas has exclusively entrusted to the respondent and which would be subject to the O’Keeffe
principles.
71. However, by contrast, it does not appear to me that the Court could construe s. 25(7)(a) as demonstrating an intention to
entrust exclusively to the respondent the determination of whether or not a development is, or is not, consistent with the Planning
Scheme. That sub-section provides that the carrying out of certain development will be exempted development. The first category is
the carrying out by the respondent itself of any development in the area “which is consistent with that planning scheme”. It could not
be the intention of the Oireachtas that if a genuine dispute arose between an interested person, such as a landowner in the area,
and the respondent as to whether or not a development which the respondent itself proposed to carry out was, or was not,
consistent with the relevant planning scheme approved by the Minister pursuant to s. 25(5), that it would be a matter for
determination by the respondent itself, subject only to review by the Courts in accordance with the O’Keeffe principles. Rather, it
appears to me that such person is entitled to have the dispute as to the proper meaning of the planning scheme approved by the
Minister under s. 25, which is in the nature of an environmental contract upon which they are entitled to rely, determined by the
Court in accordance with the principles set out by Barr J. in Tennyson.
72. Further, the essence of the O’Keeffe principles are that the courts should not interfere with decisions of planning authorities on
matters which the Oireachtas has clearly entrusted to those specialised bodies, and which are primarily a question of planning
judgment, unless such decisions are unreasonable or irrational in the legal sense. The construction of what a planning scheme properly
means has not been so entrusted to the respondent and it is not exercising such a planning judgment in determining what the
planning scheme, as approved by the Minister, properly means. Further, in taking a decision on consistency on an application for a
s.25 certificate, it is not exercising a development function entrusted to it by s. 18, but rather, an adjudicative function. Accordingly,
I have concluded the Court should construe the North Lotts Planning Scheme and determine the dispute as to whether or not certain
factually agreed aspects of the notice party’s proposed development are or are not consistent with the Planning Scheme.
73. The proper approach to the construction, by the Court, of planning documents, was also considered by Barr J. in Tennyson at
p.535, in which he referred to the judgment of McCarthy J. in the Supreme Court In re. X.J.S. Investments Ltd. [1986] I.R. 750, and
the following passage at p.756:
“Certain principles may be stated in respect of the true construction of planning documents:-
(a) To state the obvious, they are not Acts of the Oireachtas or subordinate legislation emanating from skilled
draftsmen and inviting the accepted canons of construction applicable to such material.
(b) They are to be construed in their ordinary meaning as it would be understood by members of the public without
legal training as well as by developers and their agents, unless such documents, read as a whole, necessarily
indicate some other meaning . . .”
Those were the principles then applied by Barr J. in Tennyson and appear to be the ones which I should apply in construing the North
Lotts Planning Scheme.
Consistency with the North Lotts Planning Scheme
74. As set out at the commencement of this judgment, the primary contention of the applicants on this aspect of the case is that the
proposed development of the notice party is not consistent with the North Lotts Planning Scheme in two respects, the first of which
is that it fails to meet the minimum mix of residential and commercial use prescribed by paragraph 4.1 of the Planning Scheme.
75. It is not in dispute that the proposed development is a development exclusively for commercial use, and is on a site which is larger
than 0.2 hectares (0.5 acres). Paragraph 4.1 of the Planning Scheme requires the overall mix of development for the Area to be
consistent with the Master Plan objective to assign 60% of development of land for residential use and 40% for commercial uses. It
also states that there is a prior assumption that the ratio will be met on all sites above 0.2 hectares, but that variations on the ratio
may be considered, subject to an “absolute minimum of 40% residential and 30% commercial with 30% variable” where a development
meets certain criteria. It is also not in dispute that the proposed development of the notice party is on part only of the area owned
by the notice party.
76. A condition imposed by the respondent at para. 2 of the conditions, explains the view taken by the respondent. It states:
“2. The development relates to Phase 1 of the site consisting of buildings 1, 2 and 3. The development of Phase 2 of the site shall be
the subject of a separate Section 25 application. The provision and distribution of 40% residential use and 60% commercial uses shall
be consistent with the terms of the Planning Scheme over the entire landholding (i.e. Phase 1 and Phase 2).”
77. The essence of this dispute between the parties is whether the respondent is confined to considering whether the development
to which the application relates, if carried out, is consistent with the Planning Scheme, or whether it may have regard to some future
unspecified potential development on land also owned by the developer.
78. I have concluded, on a proper construction of s. 25(7) and the North Lotts Planning Scheme, that the respondent is so confined.
The effect of granting the certificate for the current proposed development of the notice party is that that such 100% commercial
development is exempt development for the purposes of the Planning and Development Acts. It may therefore be carried out,
regardless of whether any development is ever carried out on the balance of the lands owned by the notice party. Where the effect
of granting a certificate is to make the development to which the certificate relates exempt development, it appears to me that such
development to be entitled to a certificate must, of itself and by itself, be consistent with the Planning Scheme. The respondent has
no control over whether or not the notice party will ever carry out any further development on the balance of the lands owned by it.
I recognise, of course, that if it did apply for a certificate in relation to proposed development, that the respondent has indicated an
intention as to how it will consider any such application. However, the notice party is not obliged to make any such application.
79. The respondent and notice party submitted that a “site” is not defined in the North Lotts Planning Scheme and therefore it is
open to the respondent to consider as the relevant site, for the purposes of para. 4.1, the entire land holding of the respondent.
They are correct in submitting that site is not defined. However, it seems to me, having regard to the wording of para. 4.1, that its
plain meaning is that if a person seeks to carry out a development on a site which is in excess of 0.2 hectares, then such
development will only be consistent with the North Lotts Planning Scheme, if the mix of residential and commercial uses are in
accordance with the provisions of paragraph 4.1. It is, of course, a matter for a developer as to the size of the development for
which it seeks a section 25 certificate. The notice party could have sought a certificate for development on the whole site owned by
it but did not do so.
80. Accordingly, I have concluded that the carrying out of the development to which the certificate dated 13th June, 2007, applies,
is not consistent with para. 4.1 of the North Lotts Planning Scheme, even taking into account condition 2 thereto.
81. Having decided this issue, it is not strictly necessary to decide the second aspect of alleged inconsistency, namely, in relation to
building heights. However, this alleged inconsistency raises a different issue which is of general importance to the respondent, and
therefore it appears to me that I should determine that issue. It is not in dispute between the applicant and the respondent that the
heights of the buildings in the development, as proposed in the application to the respondent, was inconsistent with section 5 of the
North Lotts Planning Scheme. The issue is whether or not the respondent may impose a condition, or conditions, requiring
modifications of the proposed development so as it make it consistent with the Planning Scheme as it did at condition No. 14 in
certificate DD457.
82. The parties all referred extensively to the judgment of Hardiman J. (with whom the other members of the Court agreed) in
Ashbourne Holdings Ltd. v. An Bord Pleanála [2003] 2 I.R. 114. That decision, in part, was concerned with the vires of a condition
directed at ensuring or regulating public access to the old Head of Kinsale on lands adjacent to the lands for which permission or
retention was sought and being in the same ownership. The condition was imposed pursuant to the powers given by s. 26(1) and (2)
(a) of the Local Government (Planning and Development) Act 1963. Notwithstanding the extensive references to this judgment, all
parties accepted the differences in the two statutory schemes and the differences in the nature of the decision being made by An
Bord Pleanála the subject matter of the Supreme Court judgment in Ashbourne, and the decision taken by the respondent herein.
83. Hardiman J. at p.122, in his decision on vires, stated:
“Despite the strong positions adopted on each side, the question of vires comes down to a consideration of s. 26. If the
power to create conditions of this sort is within s. 26, then only a successful attack on the constitutionality of that
section could prevent its exercise in an appropriate case. If it is not within the section it is legally irrelevant that the first
respondent may think it should be. The rights of property and the imperatives of public access are alike irrelevant to the
question of vires, which is a wholly legal one.”
84. I have concluded that exactly the same position pertains here. The question of the vires of the respondent to grant a certificate
with a condition such as that included at para. 14 of the conditions attached to certificate DD457, the effect of which is to require
redesign of the buildings to make them consistent with the North Lotts Planning Scheme, is a matter of construction of section 25 of
the Act of 1997.
85. This issue raises a difficult question of interpretation. There are persuasive arguments for both constructions. The respondent
relies heavily on the general duties and functions of the respondent, set out in s. 18, to secure the development of the Dublin
Docklands Area, and the very general nature of the functions assigned to it by section 18(1). It also makes the common sense
submission that where, as in this instance, it receives an application for a s. 25 certificate in respect of a development which is not,
in all respects, consistent with the Planning Scheme for the area, that it can more effectively secure the carrying out of that
development by granting the certificate with a condition which requires modification of design etc., to make the proposed
development consistent with the Planning Scheme. They also refer to the very general nature of the wording in s. 27(a)(i) that a
certificate may contain “such conditions in relation to the carrying out of the development as the Authority considers appropriate”.
86. There was some difference in submission between the respondent and notice party as to the precise origin of the power to impose
a condition to make the development compliant with the Planning Scheme. Mr. Cush S.C., on behalf of the respondent, submitted that
such a condition could not derive from sub-section 7(c), inserted by amendment in 2002, but rather must flow from the original
wording of section 25(7)(a)(ii). Mr. Collins, S.C., for the notice party, submitted that it could arise under sub-section 7(c)(ii).
87. The applicants, on the other hand, simply submit that s. 27(a)(ii) and (c) (as amended), does not permit of the certifying, as they
put it, on a contingency basis. They say that such is the effect of condition no. 14 to certificate DD457. The respondent is granting
the certificate but is requiring the notice party to modify its designs and then agree with the respondent such modifications. The
certified development will only be consistent with the North Lotts Planning Scheme if carried out in accordance with a design not yet
determined. The applicants submit that there is no statutory authority for any such approach. A certificate DD457 in its terms makes
clear that the respondent is only certifying on a contingent basis as submitted. It states:
“… certify that subject to the compliance with the attached (22) conditions the carrying out of the said development to
be consistent with the Planning Scheme ….”
88. I have concluded, as a matter of probability, that the applicants’ submissions are correct that s. 25(7)(a)(ii) and (c) cannot be
construed as giving to the respondent a power to certify, as consistent with the Planning Scheme, a development, subject to the
notice party carrying out modifications to the design to ensure compliance with the Planning Scheme, and requiring subsequent
agreement with the respondent of the revised designs.
89. Regretfully, I have concluded that the respondent has incorrectly approached its certifying powers by analogy too closely with
the manner in which the planning authorities now exercise the statutory power to grant planning permissions in accordance with s. 34
of the Act of 2000, and previously, section 26 of the Act of 1963. The planning authority is making a quite different decision pursuant
to those sections, and is expressly given the general power to grant permissions “subject to or without conditions”. Essentially, it may
grant permissions which it considers to be in the interest the proper planning and sustainable development of the area subject to
certain limitations such as not being a material contravention for a development plan.
90. As already stated in this judgment, the function impliedly assigned to the respondent by reason of the provisions of s. 25(7)(a) is
more limited. It has no jurisdiction to grant a certificate where the carrying out of the development would be in the interest of the
Planning scheme. It is confined to granting a certificate adjudicating the development to be consistent with the Planning Scheme.
Further, this function must be construed in the context of its purpose and the effect that it may have, namely, to confer what was
described by counsel for the respondent as the “extraordinary benefit” of enabling a person carry out a significant development
without being subjected to the rigours of the statutory planning code. Its purpose is to allow significant development by a fast track
method by way of exception to the Planning and Developments Acts. As an exception, it cannot be construed more widely that the
terms of the Act permit. It appears to me, primarily from the wording of s. 25(7)(a)(ii) and (c), that the Oireachtas intended that the
primary decision which has to be taken by the respondent is whether or not the carrying out of a proposed development is, or is not,
consistent with the Planning Scheme and it is only in the event that it is determined to be consistent with the Planning Scheme, that
the respondent is given the power to grant a certificate, and it may then include in the certificate for such consistent development
conditions in relation to the carrying out of that development. It is the determination that the proposed development is consistent
with the Planning Scheme which entitles it to be considered as exempt development. The need to permit the respondent include in
the certificate, conditions in relation to the carrying out of the development, appears to arise by reason of the fact that these
developments are ones which would normally require planning permission and the multiplicity of conditions which might normally be
included by a planning authority in relation to the carrying out of a development, as distinct from conditions which pertain to the
nature of the development which will be carried out. Many of the conditions included in certificate DD457 are of that nature. The
amendment made in 2002 by the insertion of sub-paragraph (c) supports, in my view, such a construction. It is to be noted that this
sub-paragraph provides that “for the avoidance of doubt, a certificate issued (emphasis added) under paragraph (a)(ii) may include
the following”, and then a series of types of conditions are listed and that at para. (iii) being the only one of relevance and, whilst
undoubtedly of a very general nature, but as Mr. Cush accepted, correctly in my view, not one which would authorise the imposition
of a condition, the intended effect of which was to make an otherwise inconsistent development consistent with the Planning
Scheme.
91. Whilst I recognise the practical sense in the submission made on behalf of the respondent that development may be more
effectively secured by granting a certificate subject to conditions that re-using and awaiting a revised application, it does not appear
that such a construction is supported by the terms of the Act of 1997 as amended. As already stated, the adjudicative function is
not one expressed to be for the purpose of securing development or regeneration of the Dublin Docklands Area. Also, importantly, the
respondent is not given any powers of enforcement or to ensure compliance with a section 25 certificate. Enforcement remains with
the planning authority. Certainty requires that the certificate of itself demonstrates whether or not the development to which the
certificate applies is, or is not, exempt development.
92. I have therefore concluded that on this ground of challenge also that the decision to grant certificate DD457 was ultra vires the
respondent.
93. I wish to make clear the limits of this conclusion. It is ultra vires the respondent to grant a s.25 certificate in respect of a
development which, as proposed in the application, is inconsistent with the relevant planning scheme, even with a condition the
purpose of which is to render the carrying out of the development in accordance with the condition consistent with the planning
scheme. However, this must be distinguished from the situation where the carrying out of the proposed development the subject of
the application, is determined to be consistent and the respondent considers it desirable in the furtherance of the planning scheme or
Master Plan that the development be carried out with certain variations (obviously consistent with the planning scheme). The
respondent has wide powers to impose such conditions in a certificate under section 25(7)(a)(ii) and (c). This could arise in practice
in relation to the North Lotts Planning Scheme, for example, in relation to matters where it is not prescriptive such as location of
routes and open spaces.
94. The final issue in relation to the vires of the conditions in certificate DD457 is the applicants’ contention that condition no. 22,
requiring the notice party to cede to the respondent the strip of land located on the northern quadrant of the site within four weeks
of the date of issue of the certificate, is ultra vires. The submissions in relation to the purpose of this condition varied. Part of the
submission was that this was also a condition intended to render the development consistent with the North Lotts Planning Scheme in
relation to the provision of open spaces. If so, (which I am not holding), then the decision to grant the certificate is also ultra vires
on this ground. However, there was also a wider submission that the respondent could impose a condition requiring an applicant for a
s. 25 certificate to cede lands to it, free of charge, where the respondent considered such ceding to be in furtherance of either the
Master Plan or the North Lotts Planning Scheme.
95. It is unnecessary for me, having regard to the conclusions already reached in relation to the vires of condition no. 14 and the
other conclusion, to determine separately the vires of the respondent to impose a condition to cede as in condition number 22. It
appears to me undesirable that I should do so on the facts of this application. The land is land owned by the notice party. It had
agreed to cede this land to the respondent if the section 25 certificate was granted. It is not objecting in these proceedings to the
vires of the respondent to impose the condition. Whilst the applicant has made legal submissions against the vires of the respondent
to do so, it is doubtful that the applicant would have locus standi to challenge the validity of the certificate by reason of the
imposition of this condition alone, where it is not the owner of the land. It therefore appears to me more appropriate to leave over the
determination as to whether the respondent has the power to require the transfer to it, free of charge, by the imposition of a
condition in a s. 25 certificate, until it arises (if at all) where the owner of the land who has an interest, objects to the imposition of
such a certificate.
Bias
96. The last ground of challenge to the decision of 13th July, 2007 to issue certificate DD457, is that it was made in breach of the
rule against apparent or objective bias by reason of the agreement of 31st May, 2007, and/or that the respondent took into account
an irrelevant consideration, i.e. the Agreement, in reaching its said decision. I do not propose considering and determining on the
facts of this case the extent to which the respondent took into account the Agreement in reaching its decision. It appears to me
unnecessary, having regard to the conclusions already reached and only relates to the particular facts of this case.
97. However, the deponents for the respondent have made clear in their affidavits that it forms part of their common practice to
enter into both pre-section 25 application discussions and agreements of this nature with developers. They referred to agreements
entered into with one or both of the applicants. Having regard to the general practice and the extent to which the issue was debated
in the course of this hearing, it appears appropriate that I should set out my conclusions on the issue.
98. There was no real dispute between the parties as to the legal principles according to which the Court should determine this issue.
It is accepted by Mr. Cush, on behalf of the respondent, that in Ireland, unlike the position in England and Wales, the same
“reasonable apprehension” test applies to both judicial and administrative bodies. In Spin Communications Ltd. v. Independent Radio
and Television Commission [2001] 4 I.R. 411, Murray J. (as he then was), stated at p.431:
“The test to be applied in determining what may be regarded as constituting objective bias on the part of an adjudicator
(and I use this term in order to cover judicial proceedings and administrative or quasi-judicial proceedings before tribunals
or other administrative bodies) has been considered in a good number of cases in recent years before the High Court and
in particular before this court. I think the law on this question is now clear and is that as expressed by Keane C.J. in his
judgment in the Orange Communications Ltd. v. Director of Telecoms (No. 2) [2000] 4 I.R. 159. In his judgment, with
which a majority of the court expressly agreed, the Chief Justice stated at p. 186 that there is: -
‘No room for doubt as to the applicable test in this country: it is that the decision will be set aside on the ground of
objective bias where there is a reasonable apprehension or suspicion that the decision maker might have been
biased i.e. where it is found that, although there is no actual bias, there is an appearance of bias’ . . .
Moreover, for objective bias to be established it must be shown that there existed some external factor extraneous to the
decision making process which could give rise to a reasonable apprehension that the decision maker might have been
biased. Furthermore, this external factor must exist prior to the decision made.”
99. These principles in relation to an administrative body are subject to some limitation or exception in favour of a bias of necessity or
structural bias by reason of relevant statutory provisions. Keane J. (as he then was) considered the position of a body whose
statutory scheme might mean that it does not present the appearance of strict impartiality required of a Court administering justice in
Radio Limerick One Ltd. v. Independent Radio and Television Commission [1997] 2 I.R. 291 and at p.316 stated:
“There is a further consideration applicable to bodies of this nature which is relevant to the present case. Because of the
factors to which I have already referred, a body such as the commission may not, in given circumstances, present the
appearance of strict impartiality required of a court administering justice. That, however, does not relieve the commission
of the obligation to take every step reasonably open to it to ensure that its conclusions are reached in a manner, not
merely free from bias, but also of the apprehension of bias in the minds of reasonable people. But where, as here, a body
is obliged to carry out certain statutory functions and no issue arises as to the constitutionality of the relevant
provisions, a court cannot by the strict application of the legal principles already referred to prevent the body from
exercising those functions, where all practical steps have been taken by it to free itself, not merely from actual bias but
the apprehension of bias in the minds of reasonable people: see the decision of this court in O’Neill v. Beaumont Hospital
[1990] I.L.R.M. 419.”
100. The applicants also relied upon the decision of the High Court in England in Steeples v. Derbyshire County Council [1985] 1 W.L.R
256. That decision deals with a number of issues and essentially in one part of the decision applies the above principles to the facts
of that case. That is what I must do to the facts of this case.
101. It is not in dispute between the parties that the agreement of the 31st May, 2007, is an “external factor” extraneous to the
respondent’s decision making process on the notice party’s application for a s. 25 certificate of the type referred to by Murray C.J. in
Spin Communications Limited v. Independent Radio and Television Commission. It is also not in dispute that the existence of the
Agreement was brought to the attention of the Board of the respondent, which is its organ responsible for taking the decision on the
s. 25 certificate. The fact that the members of the Board may not have been aware of the detailed terms of the Agreement does not
appear relevant. Its essential features were brought to the attention of the Board when it met on the 11th June, 2007, in accordance
with the paper prepared by Mr. Mulcahy and exhibited and set out earlier in this judgment.
102. The parties were also in agreement that in accordance with the decisions of the Supreme Court, already referred to, the Court in
determining whether a reasonable person might apprehend that there would be bias because of the external factor, that reasonable
person must be deemed to have knowledge of all the relevant circumstances which, in this instance, would include the full terms of
the Agreement and the statutory scheme under which the respondent operates and its practice of entering into discussions and even
agreements with interested parties.
103. The terms of the Agreement are of crucial importance. The agreement of the 31st May, 2007, is an agreement expressed to be
between the respondent and notice party. In its recitals it refers to the North Lotts Planning Scheme (“NLPS”), the initiation of a
statutory scheme to revise the NLPS, the site owned by the respondent and then recites at paragraphs (D) to (G) inclusive:-
(D) The Authority has identified that part of the Site more particularly shown on the plan attached hereto and initialled by
the parties as being appropriate for public open space. The Authority requires a portion of the Site fronting Mayor Street
Upper to facilitate those public works.
(E) The current NLPS would not permit a development of the nature intended by NQIL [North Quay Investments Ltd.].
(F) NQIL is desirous of proceeding with the first phase of its proposed development as soon as is practicable.
(G) The Authority is desirous of facilitating NQIL in this regard subject to terms and conditions set out below.
104. The clauses of particular relevance to the issue of bias appear to be the following:-
1. NQIL lodged on Friday 11th May 2007 an application with the Authority, within the parameters of the current NLPS, for
a Section 25 Certificate for the Site in respect of a modified version of its proposed office development.
3. The executive of the Authority will recommend to the Board that the application for a Section 25 Certificate received
from NQIL pursuant to Clause 1 be granted by the Authority by no later than 31st July, 2007.
5. The Authority acknowledges that it is critical to NQIL to obtain such a Certificate, or alternatively planning permission
from Dublin City Council, within the said twelve month time frame in order to allow NQIL honour its commitments to certain
prospective tenants at North Wall Quay.
6. In consideration of the Authority granting the Section 25 Certificate to be applied for under clauses 1, 2 and 3 above
NQIL will transfer free of cost to the Authority good and marketable title to that portion of the Site more particularly
identified on the plan attached hereto and shown hatched green (“the Strip”) in order to facilitate the Authority’s long
term plans for a major public space in the North Lotts area subject to:
[There are then set out seven conditions some of which provide for the type of transfer, certain circumstances in which
the land would be surrendered back to the notice party and certain provisions in relation to the works to be carried out on
the land, none of which are relevant to the issues herein.]
8. This Agreement does not create nor shall it in any circumstance be taken or construed as having created any
partnership between the Authority and NQIL.
10. The parties agree with one another that they will keep confidential the contents of this Agreement and will not,
without the prior consent of the other party (such consent not to be unreasonably withheld or delayed), divulge to any
third party whatsoever the details thereof (other than to necessary professional advisors and others who are necessary
for NQIL in connection with its funding and other dealings with the development e.g. respective tenants and in any
proceedings issued or intended to be issued or as required by law.
11. Nothing in this Agreement shall prejudice or affect any of the statutory rights, powers or duties for the time being
vested in the Authority as the Statutory Authority for the area in which the Site is located.
105. The applicants submit that Clause 6, when properly construed in the context of the Agreement, means that the respondent
agreed in this Agreement to grant the s. 25 certificate in consideration of the transfer of the land free of cost. I do not accept that
this is the proper construction of Clause 6. Rather, it appears to me that Clause 6 when construed, particularly in the context of
Clause 3, means that in the event that the respondent granted a s. 25 certificate, the notice party agreed to transfer the land free
of charge. It is with this construction that I propose determining the issue of “reasonable apprehension of bias”.
106. I have concluded that in applying these principles, and in particular those stated in Spin Communications Limited v. Independent
Radio and Television Commission and Radio Limerick One Limited v. Independent Radio and Television Commission, that I must set
aside the decision of the respondent to grant this s. 25 certificate to the notice party on the ground of objective bias, as it appears
to me that the existence of the agreement of the 31st May, 2007, gives rise to the reasonable apprehension that the respondent
might have been biased. My reasons for so concluding are the following.
107. The agreement of 31st May, 2007, at recital D and Clause 6, makes clear that the land to be transferred has been identified by
the respondent as being appropriate for public open space and that its acquisition by the respondent is at a minimum desirable to
facilitate the respondent’s long term plans for major public space in the North Lotts Area. In the affidavits, the transfer of the land is
referred to as a “planning gain”. The respondent, in submissions, emphasised the absence of any material benefit to the respondent in
the sense of the value of the land being transferred, but rather, that its transfer would impose financial obligations on the respondent
to create open spaces. Notwithstanding that this may be so, the Agreement indicates that the acquisition by the respondent of this
land is perceived by it as being something which will facilitate its plans for the development of the North Lotts Area and in that sense
its transfer will create a benefit for the respondent.
108. Secondly, Clause 6 makes clear that it is only in the event that the s. 25 certificate is granted that the notice party becomes
obliged to transfer the lands. Thus, there is a direct relationship between the decision to grant the s. 25 certificate and the obtaining
by the respondent of the lands and the benefit in the sense that I have described.
109. Thirdly, the Agreement makes clear that the notice party is desirous for commercial reasons of proceeding with what is termed
the first phase of the development, notwithstanding that the current North Lotts Planning Scheme would not permit a development of
the nature intended. Clauses 3 and 5 acknowledge the crucial timing for the notice party of the grant of the certificate.
110. Clause 3 in its terms commits the “executive of the Authority” to recommend to the Board that the application for the s. 25
certificate be granted by the respondent no later than 31st July, 2007. The Board is, of course, the organ which takes the decision.
However, as already observed, the members of the Board are non-executive members. That is clear from the terms of the Act. A
reasonable person with knowledge of the entire Scheme will be aware of that fact and it seems to me, as a matter of common sense,
that a board, such as the Board of the respondent, will inevitably rely considerably on any recommendation made to it by its full-time
executives. Whilst the “executive of the Authority” is not a legal person and the individual members of the executive do not appear to
be parties to the Agreement, it has been signed by the Secretary of the respondent who is one such executive. In accordance with
its express terms, the executives of the Authority appear to be committing themselves to a particular viewpoint, and it appears to me
that there must be a reasonable apprehension that the executives, having done so, that the Board will, in the absence of some
special factor, follow the recommendation of the executives. This commitment, coupled with the benefit which the respondent will
obtain if the certificate is granted, appear to me to be the crucial factors which create a reasonable apprehension of bias in the
decision to be made on behalf of the respondent by the Board.
111. It does not appear to me that Clause 11 of the Agreement can in any way save the Agreement from creating this reasonable
apprehension of bias. It does no more than state the obvious insofar as no agreement entered into, even if fully authorised, could
affect the statutory rights, powers and duties for the time being vested in the respondent. It appears to me that this Clause is a
formulaic Clause which undoubtedly attempts to preclude a person having a reasonable apprehension of bias but, in my view, having
regard to the other terms of the Agreement which I have already referred, and the fact that the Agreement, albeit on its face with a
statutory body, is to remain confidential pursuant to Clause 10, it cannot operate so as to prevent a conclusion that the Agreement
itself does create a reasonable apprehension of bias in the decision to be taken on the application for the section 25 certificate.
112. The other factor relied upon strongly by counsel for the respondent and the notice party, is the existence of the very wide and
extensive powers given to the respondent to secure development of the Dublin Docklands Area and its practice, which is stated to be
well known, of entering into agreements with developers and the practical necessity to do so. Again, it does not appear to me that
this can avoid the conclusion which I have reached. Undoubtedly, the respondent has very wide powers given it to secure the
development and regeneration of the Dublin Docklands Area. However, for the reasons set out earlier in this judgment, it appears to
me that it has what is a separate and distinct power and obligation to adjudicate on applications for certificates under section 25(7)
(a)(i). In carrying out this function, it is, in the first instance, carrying out an adjudicative function as to whether or not a proposed
development is consistent with the Planning Scheme for the area. If it does so, it may then decide to impose conditions which are
closely related to the development function. By reason of its development function and obligations, the respondents may not present
the appearance of strict impartiality required, for example, by a Court administering justice in determining an application for a section
25 certificate. It might be considered to have a predisposition towards granting certificates. However, this being so, the principles set
out so clearly by Keane J. (as he then was) in Radio Limerick One Limited v. Independent Radio and Television Commission apply, and
the respondent is under an obligation to take practical steps to free itself in taking a decision on an application from a s. 25
certificate, not merely from actual bias, but the apprehension of bias in the minds of reasonable people. This appears to include
having a procedure under which no commitment is given, not just by a member of the Board itself, but by the executives (who can
only be or be perceived to be acting on behalf of the respondent), to any person as to the view to be taken (or a recommendation for
a view) on an application for a s.25 certificate prior to the determination of the application by the Board. It further appears to me to
require that the respondent does not permit any arrangements to be put in place in carrying out its development functions which
would create an impression that the respondent would be obtaining a benefit in the sense of something that it wishes to have or
achieve for the purposes of its development functions if it grants a section 25 certificate.
113. Accordingly, whilst it appears to me permissible for the executives of the respondent to enter into pre s. 25 application
discussions, as is their practice, it appears impermissible that those discussions would result in either a commitment given by the
executives to make a formal recommendation, or in an agreement whereby the respondent would obtain area benefit in any sense in
the event that it grants the section 25 certificate. There is, I recognise, a thin line between what appears permissible, namely,
discussions under which a developer might seek to ascertain from the executives whether or not they perceive any inconsistency with
what is being applied for or a discussions about potential conditions with the type of formal commitment by the executives to make a
particular recommendation which appears impermissible. The practical working of the Act of 1997, having regard to the development
function and the provision for s. 25 certificates, appears to require for its effective working some pre-application discussions and
therefore must be considered as contemplated by the Oireachtas. However, it is important that the executives at all times make clear
that they are not in a position either to commit themselves or the Board to a particular course of action, nor should they seek any
benefit (in the very general sense of the word) for the respondent in the event of the grant of a certificate.. What is permissible falls
short of what was done in this instance.
Certiorari of the Agreement
114. The applicants have sought an order of certiorari of the Agreement of the 31st May, 2007. They have not provided any
authority to support the jurisdiction of the Court to quash an agreement entered into by a public body. The essence of the
jurisdiction of certiorari is to quash a decision which is ultra vires a statutory body. There is no evidence of any decision taken by the
Board, or any other organ of the respondent, to enter into the Agreement with the notice party. Whilst it is expressed to be an
agreement between the respondent and the notice party, the evidence is that it was an agreement entered into by the executives of
the respondent, but it is unclear under what authority they did so. No issue arose in the proceedings as to the authority of the
executives to enter into such an agreement.
115. The applicants sought the order of certiorari of the Agreement on the basis that it was ultra vires the respondent. It follows
from the conclusions which I have reached above, that the respondent has very wide powers in relation to steps which it may take to
secure the development or regeneration of the Dublin Docklands Area. However, having regard to the adjudicative function imposed
on the respondent by s. 25(7)(a)(i) and the principles set out above as to how that function must be exercised in order to avoid any
apprehension of bias, it appears to me that it was ultra vires the respondent to enter into the agreement for two reasons. First, it is
ultra vires the respondent to enter into an agreement in advance of determining an application for a s. 25 certificate under which it
will obtain a benefit if it grants the certificate. In entering into the agreement it is rendering its subsequent decision invalid by reason
of the existence of a reasonable apprehension of bias. It is ultra vires for it to do so. Secondly, insofar as the agreement should be
construed as either the respondent or its executives committing that its executives would make a particular recommendation to the
Board, that also appears to me to be ultra vires the respondent.
Relief
There will be:-
(1) An order of certiorari of the decision 13th July, 2007, to grant certificate DD457 to the notice party pursuant to s.
25(7) of the Dublin Docklands Development Authority Act 1997; and
(2) A declaration that the Agreement of the 31st May, 2007, between the respondent and notice party was ultra vires
the respondent.